ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / SUBHA 9 SKY VUE

Registration approved Residential/Group Housing project

SUBHA 9 SKY VUE

By SUBHA Builders and Developers

RG-KA-71641 · RERA PRM/KA/RERA/1251/308/PR/171214/000908

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 3 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2020Possession promisedmoved 3 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 38 documents Report an error

SUBHA 9 SKY VUE is a Residential/Group Housing project by SUBHA Builders and Developers in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/171214/000908 on 14 Dec 2017. Possession is promised by 31 Mar 2020. The completion date has moved by 3 months from the original filing.

At a glance

Project

  • NameSUBHA 9 SKY VUE
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/171214/000908
  • ReraGenie IDRG-KA-71641

Builder

  • NameSUBHA Builders and Developers
  • Entity typePartnership Firm
  • Authorized SignatoryChandra ShekarGarine

Key dates

this monthRegisteredDec 2017First promiseDec 2019Revised toMar 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Dec 2017
  • Promised completion31 Mar 2020
  • Revised completionRevised to 31 Mar 2020 (originally 30 Dec 2019)
  • Buildings2 building records
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BLOCK---81081
B BLOCK---99099

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,463 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 31.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManjunath Nayak
EngineerPraveen Kumar Gurrala

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/308/PR/201001/000908Dec 2019 → Mar 2020

Reason as filed by the promoterShortage of Labour

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/171214/000908 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: New Document.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect Completed Work Certificate-SBD.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Work Completed Certificate-SBD.pdf-
CA Certificate for Funds UtilizationFile: CA Fund Utulization Certificate.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Pending Work Certificate-SBD.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer Work Pending Certificate-SBD.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate For Funds Required-PDF.pdf-
AffidavitFile: Affidavit For Project Extension -pdf.pdf-
Latest Encumbrance CertificateFile: EC-Subha 9 Sky Vue.jpg-
Consent letter from 2/3rd of AllotteesFile: Consent of allottees letter for project extension-PDF.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold UnsoldDetails-Subha 9 Sky Vue.xlsx-
Document 1File: Acknowledgement.pdf-
Document 2File: Completion Certificate.pdf-
Document 3File: Stability Certificte.pdf-
Document 4File: 1333135000002094 -Designated Account.pdf-
Document 5File: 2.2- CC.pdf-
Document 6File: AAFIDAVIT-SEC 18-SUBHA 9 SKY VUE.pdf-
C_9SKY VUE CC-
4-
3-
N_9SKY VUE SALE DEED-
O_9SKY VUE sale agreement-
ANEKAL PLANNING DEVELOOPEMNET DEMAND DRAFT 01-022016-
2-
1-
I_SBD ALLOTMENT LETTER_DCP-
ANEKAL PLANNING DEVELOOPEMNET DEMAND DRAFT 01-022016-
L_SPECIFICATION-
B_EC 9SKY VUE-
E Kahta-
JDA10072017-
M_FORM B-
Prospectus/BrochureFile: SUBHA 9 sky Vue Brouchre.pdf-
Advertisement Copy 1File: 9 SKY VUE ADVERTISEMENT.jpg-
Tower Excel SheetFile: A and B BLOCK FLAT DETAILS.xlsx-
Occupancy CertificateFile: OCcupancy Certificate.pdf-
Completion certificateFile: Completeation Certificate.pdf-
Registered Agreement of SaleFile: Sale Agreement.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 3 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SUBHA 9 SKY VUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSUBHA 9 SKY VUEOther 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: SUBHA Builders and Developers

SUBHA Builders and Developers has 1 registration on RERA Karnataka, including SUBHA 9 SKY VUE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SUBHA 9 SKY VUE is delayed beyond 31 Mar 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SUBHA 9 SKY VUE?

The registered promoter entity is SUBHA Builders and Developers, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SUBHA 9 SKY VUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SUBHA 9 SKY VUE?

The professionals named in the filing: Architect: Manjunath Nayak; Engineer: Praveen Kumar Gurrala. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUBHA 9 SKY VUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUBHA 9 SKY VUE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUBHA 9 SKY VUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.