Sterling Villa Grande Phase-III
By Sterling Urban Developments Private Limited
RG-KA-86455 · RERA PRM/KA/RERA/1251/446/PR/030623/005969 · Last updated on RERA Karnataka portal: 12 Jan 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Sterling Villa Grande Phase-III is a Residential/Group Housing project by Sterling Urban Developments Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/030623/005969 on 3 Jun 2023. Possession is promised by 30 Jun 2026. 17 of the 25 units on this registration are recorded sold or booked, and 16 of 16 construction stages are filed complete.
At a glance
Project
- NameSterling Villa Grande Phase-III
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/446/PR/030623/005969
- ReraGenie IDRG-KA-86455
Builder
- NameSterling Urban Developments Private Limited
- Entity typeCompany
- CINU07010KA2002PTC030626
- GSTIN29AAACF9183C1ZJ
- Authorized SignatorySASTRI VENKAT RAMANI
- CeoSASTRI VENKAT RAMANI
- DirectorsSASTRI VENKAT RAMANI, Gowri Shankar Sastri
- Project HeadSASTRI VENKAT RAMANI
- Other registrations1 more →
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on3 Jun 2023
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings1 building record
- Documents filed199 files
Current status
Figures as on 12 Jan 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sterling Villas Grande Phase-3 | - | - | - | 25 | 0 | 25 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 12 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 16 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 12 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | Yes | 100% |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | Yes | 100% |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership11
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sterling Urban Developments Private Limited | - | - |
| Sterling Urban Developments Private Limited | - | - |
| Sterling Urban Developments Private Limited | - | - |
| Sterling Urban Developments Private Limited | - | - |
| Sterling Urban Developments Private Limited | - | - |
| Sterling Urban Developments Private Limited | - | - |
| Sterling Urban Developments Private Limited | - | - |
| Sterling Urban Developments Private Limited | - | - |
| Sterling Urban Developments Private Limited | - | - |
| Sterling Urban Developments Private Limited | - | - |
| Sterling Urban Developments Private Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 23.13 cr | - |
| On-site expenditure-Salaries of workers | Rs 2.75 cr | - |
| On-site expenditure-Consultants Fees | Rs 2.75 cr | - |
| On-site expenditure-Site Overhead | Rs 2.75 cr | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 2.75 cr | - |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 1.33 cr | - |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 1.33 cr | - |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 1.33 cr | - |
| Payment of taxes | Rs 83.27 lakh | - |
| Payment of cess | Rs 83.27 lakh | - |
| Payment of fees | Rs 83.27 lakh | - |
| Payment of charges | Rs 83.27 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VENKATRAMANAN ASSOCIATES |
| Engineer | PRAKASH B V |
| Chartered Accountant | M Padmanabha Bhat |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed199
As listed on the registration, under the names the promoter filed them with; the newest 80 of 199 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/030623/005969 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA SVG Phase 3 Form 4 31122025.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: AC SVG Phase 3 Form 5 31122025.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: EC SVG Phase 3 from 6 31122025.pdf | 12 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 12 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 12 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 12 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 12 Jan 2026 |
| Q3 2025-26 Fire and Safety | 12 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 12 Jan 2026 |
| Sources of fundsFile: 1-Source of Fund.pdf | 26 May 2023 |
| Assignment Agreement ACREFile: Assignment Agrement ACRE.pdf | 26 May 2023 |
| Loan Ledger Statement ACREFile: ACRE Loan.pdf | 26 May 2023 |
| Resized Financials 20-21File: Financials 2021.pdf | 26 May 2023 |
| Financials 19-20File: 2Financials 1920.pdf | 26 May 2023 |
| Financials 20-21File: 2Financials 2021.pdf | 26 May 2023 |
| Financials 21-22File: 2Financials 2122.pdf | 26 May 2023 |
| Area details the projects detailsFile: 1Area details the projects details are not matchi (1).pdf | 26 May 2023 |
| Break up of type of units (BHK) wiseFile: 2Break up of type of units BHK wise (1).pdf | 26 May 2023 |
| Built-Up AreaFile: 4Built Up Area (1).pdf | 26 May 2023 |
| Number of Parking.File: 5Number of Parking (1).pdf | 26 May 2023 |
| Carpet Area Calculation to be Certified by EngineerFile: 6Carpet Area Calculation to be Certified by Engin (1).pdf | 26 May 2023 |
| CDP MAPFile: 7CDP MAP (1).pdf | 26 May 2023 |
| KSPCB CFEFile: 9Upload Renewed KSPCB CFE.pdf | 26 May 2023 |
| Renewal Engineer CertificateFile: 12Engineer Certificate (1).pdf | 26 May 2023 |
| Demarcated PlanFile: Demarcated Plan.pdf | 26 May 2023 |
| BWSSB NOC (Panchayath)File: BWSSB NOC Panchayat.pdf | 26 May 2023 |
| Brief estimated cost of construction for civil works certified by the EngineerFile: 12Engineer Certificate (1).pdf | 26 May 2023 |
| Sectional Sanctioned PlanFile: Sectional Sanctioned Plan Revised (1).pdf | 26 May 2023 |
| Inventory DetailsFile: Inventory and Area Details.pdf | 26 May 2023 |
| Annual Audit Form-7File: Form 7 Annual Return.pdf | 18 May 2023 |
| Mr.Gowri Shankar KYCFile: II-KYC.pdf | 18 May 2023 |
| Source of FundFile: III-Source of Fund.pdf | 18 May 2023 |
| profit and loss account and balance sheetFile: IV-SUDPL Financials 19-20.pdf | 18 May 2023 |
| profit and loss account and balance sheetFile: IV-SUDPL Financials 20-21.pdf | 18 May 2023 |
| profit and loss account and balance sheetFile: IV-SUDPL Financials 21-22.pdf | 18 May 2023 |
| land cost in ``Source of Fund details''File: CA Certificate.pdf | 18 May 2023 |
| Guidance value certificate issued by the concerned sub-registrarFile: 2-Guideline Value Certificate.pdf | 18 May 2023 |
| Form-9 (Rule 28) RDPR registrar page upload only 8 sy nos. in project sy no is 11 sy no.sFile: 3-Letter dated Upload Form-9.pdf | 18 May 2023 |
| Area details the project details page not matching with the Approved Plan (total area , covers areaFile: 1-Area details the projects details are not matching.pdf | 18 May 2023 |
| Break up of types of Units (BHKwise)File: 2-Break up of type of units (BHK) wise.pdf | 18 May 2023 |
| Built up area Mentioned in the project details Page not matching with the sanction plan clarify / upFile: 4-Built-Up Area.pdf | 18 May 2023 |
| Number of parking mentioned in the project details page not matching with the sanction plan clarifyFile: 5-Number of Parking.pdf | 18 May 2023 |
| certified Carpet area calculationFile: 6-Carpet Area Calculation to be Certified by Engineer.pdf | 18 May 2023 |
| CDP map showing the proposed site.File: 7-CDP MAP.pdf | 18 May 2023 |
| village map showing the proposed siteFile: 8-Village MAP.pdf | 18 May 2023 |
| Renewed KSPCB CFEFile: 9-Upload Renewed KSPCB CFE.pdf | 18 May 2023 |
| Building LicenseFile: 10-Building License.pdf | 18 May 2023 |
| Renewed SEIAA NOCFile: 11-SEIAA_NOC Affidavit.pdf | 18 May 2023 |
| Clear and legible sanctioned sectional drawings and elevationsFile: 12-Sectional Sanctioned Plan.pdf | 18 May 2023 |
| Built up area / Number of units/ number of floors in the SEIAA NOC is not matching with the sanctionFile: 11-SEIAA_NOC Affidavit.pdf | 18 May 2023 |
| Built up area / Number of units in the KSPCB NOC is not matching with the sanction Plan.File: 9-Upload Renewed KSPCB CFE.pdf | 18 May 2023 |
| Please upload the renewed Engineer license certificate on the project detail pageFile: 3-Registration certificate from Structural Engineer B V Prakash.pdf | 18 May 2023 |
| project name and project address and upload the signed copy of the project specifFile: 8-SVG - SPECIFICATIONS.pdf | 18 May 2023 |
| fee receipt paid towards Power supply NOCFile: 9-BESCOM.pdf | 18 May 2023 |
| NOC issued by Water supply authority along with the copy of fee receipt paid towarFile: 10-BWSSB Letter.pdf | 18 May 2023 |
| STP design drawing and STP demarcation drawing as per the guidelines of KSPCB NOC.File: 11-STP Drawings.pdf | 18 May 2023 |
| brief estimated cost of construction for civil works certified by the EngineerFile: 12-Engineer Certificate.pdf | 18 May 2023 |
| Covering letterFile: Covering Letter.pdf | 18 May 2023 |
| RTC, survey 104 [28 G] | - |
| Mutation, survey 104 [28 G] | - |
| Encumbrance Certificate, survey 104 [28 G] | - |
| Conversion/Alienation Order, survey 104 [28 G] | - |
| Sale/Title/Gift Deed, survey 104 [28 G] | - |
| Khatha, survey 104 [28 G] | - |
| RTC, survey 107 [27 G] | - |
| Mutation, survey 107 [27 G] | - |
| Encumbrance Certificate, survey 107 [27 G] | - |
| Conversion/Alienation Order, survey 107 [27 G] | - |
| Sale/Title/Gift Deed, survey 107 [27 G] | - |
| Khatha, survey 107 [27 G] | - |
| RTC, survey 108 [2 A 34 G] | - |
| Mutation, survey 108 [2 A 34 G] | - |
| Encumbrance Certificate, survey 108 [2 A 34 G] | - |
| Conversion/Alienation Order, survey 108 [2 A 34 G] | - |
| Sale/Title/Gift Deed, survey 108 [2 A 34 G] | - |
| Khatha, survey 108 [2 A 34 G] | - |
| RTC, survey 109 [6 A 37G] | - |
| Mutation, survey 109 [6 A 37G] | - |
| Encumbrance Certificate, survey 109 [6 A 37G] | - |
| Conversion/Alienation Order, survey 109 [6 A 37G] | - |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Sterling Villa Grande Phase-II | Survey no. 104(P), 107(P), 108, 109, 110(P), 111(P), 112(P), 113, 114, 115 & 116, , Seegehalii Village, Bidarahalli Hobli, Bengaluru - 560067 | Ongoing | Mar 2024 | Not delivered |
| Sterling Villa Grande Phase-I | Survey no. 104(P), 107(P), 108, 109, 110(P), 111(P), 112(P), 113, 114, 115 & 116, , Seegehalii Village, Bidarahalli Hobli, Bengaluru - 560067 | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Sterling Villa Grande Phase-III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Sterling Urban Developments Private Limited
Sterling Urban Developments Private Limited has 2 registrations on RERA Karnataka, including Sterling Villa Grande Phase-III and Sterling Villa Grande Phase II. Its filings declare 2 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Sterling Villa Grande Phase-III is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Sterling Villa Grande Phase-III?
The registered promoter entity is Sterling Urban Developments Private Limited, a company as per the filing. Its CIN U07010KA2002PTC030626 and GSTIN 29AAACF9183C1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Sterling Villa Grande Phase-III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Sterling Villa Grande Phase-III?
The professionals named in the filing: Architect: VENKATRAMANAN ASSOCIATES; Engineer: PRAKASH B V; Chartered Accountant: M Padmanabha Bhat. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sterling Villa Grande Phase-III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.