Home / Browse projects / Bengaluru Urban, Karnataka / Sterling Ascentia

Registration approved No litigation declared Residential/Group Housing project

Sterling Ascentia

By M/s Sterling Urban Ventures Pvt. Ltd

RG-KA-38866 · RERA PRM/KA/RERA/1251/446/PR/171026/000563 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • 30 complaints at RERA Karnataka
  • Completion date moved by 57 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
Sep 2026Possession promisedmoved 57 months from the original
9 of 18Construction stages donefurthest along: Dadoing, 98%
9 of 290Units unsoldnot recorded sold or booked
30Complaints at RERA Karnatakaon this registration
Jump to the 123 documents Report an error

Sterling Ascentia is a Residential/Group Housing project by M/s Sterling Urban Ventures Pvt. Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/171026/000563 on 26 Oct 2017. Possession is promised by 30 Sep 2026. The completion date has moved by 57 months from the original filing. 281 of the 290 units on this registration are recorded sold or booked, and 9 of 18 construction stages are filed complete. 30 complaints are on record with the regulator.

At a glance

Project

  • NameSterling Ascentia
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/171026/000563
  • ReraGenie IDRG-KA-38866

Builder

  • NameM/s Sterling Urban Ventures Pvt. Ltd
  • Entity typeCompany
  • CINU70102KA2007PTC042496
  • Authorized SignatoryRamani Sastri
  • DirectorShankar Sastri

Key dates

this monthRegisteredOct 2017First promiseDec 2021Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on26 Oct 2017
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2021)
  • Buildings4 building records
  • Documents filed123 files

Current status

97%281 of 290 units booked
93.3%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 3---59059
Tower 4---59059
Tower 5---86086
Tower 6---86086

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 18 construction stages are filed complete. The stage furthest along is Dadoing, at 98%.

Building: 97% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Retaining wall (All types)100%
Plinth level Beam100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
RCC or MS Framed structure100%
Masonry construction: Bricks, Concrete blocks etc100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc95%
Basic work of Water supply, Sanitary and Electrification95%
Dadoing, Skirting, Flooring, Tiles work (All types)98%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing95%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network95%
Weather Proof work(tile,concrete)95%
Painting85%
Elevation work95%
Internal and External work including landscapes as per santioned drawings85%

Progress on shared amenities41

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes95%
Internal Roads & FootpathsYes95%
Sewage and Drainage SystemYes95%
Parks & Tree plantingYes75%
Street LightingYes95%
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalYes95%
Water conservationNoNot applicable
Energy managementYes95%
Fire protection and fire safety requirementsYes95%
Education/Health/Other public amenitiesYes95%
Electricity supply transformer and substationYes95%
Emergency Evacuation servicesYes95%
Storm water drainsYes95%
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes95%
ElectricityYes100%
Smart Home AutomationYes0%
CCTV SurveillanceYes100%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes25%
Indoor Sports facilityYes40%
Swimming PoolYes100%
GymYes80%
ParksYes100%
Power BackupYes100%
GasNoNot applicable
Water and SanitationYes100%
Air Conditioning And incerntionNoNot applicable
StaircasesYes100%
LiftsYes100%
Staircases and Lift lobbies, corridor,lobbies, corridorYes100%
Fire escapesYes100%
Common entrance and exit for the building / common portico/foyer/verandahYes100%
BasementYes100%
TerraceYes100%
Outer WallYes100%
Open parking areas and common storage spacesYes100%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area22,915 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 464.00 cr
Cost incurredRs 433.00 cr
Spent of the estimate93.32%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 196.33 crRs 182.85 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 162.28 crRs 161.91 cr
On-site expenditure-Salaries of workersRs 79.75 crRs 79.76 cr
Payment of taxesRs 25.63 crRs 8.48 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVenkataraman Associates
EngineerPRAKASH B V

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2021 → not stated

No reason recorded in the filing

EX/PRM/KA/RERA/1251/446/PR/221028/000563not stated → Sep 2023

Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc; Shortage of Labour; others

ExtensionSep 2023 → Sep 2026

No reason recorded in the filing

Complaints filed with RERA Karnataka30

Case no.ComplainantRespondentFiled
CMP/221007/0010064-M/s Sterling Urban Ventures Pvt. Ltd07/10/2022
CMP/221021/0010125-M/s Sterling Urban Ventures Pvt. Ltd21/10/2022
CMP/221122/0010377-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221122/0010378-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221122/0010379-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221122/0010380-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221122/0010381-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221122/0010382-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221122/0010383-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221122/0010384-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221122/0010385-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221122/0010386-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221122/0010387-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221122/0010388-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221122/0010389-M/s Sterling Urban Ventures Pvt. Ltd22/11/2022
CMP/221123/0010390-M/s Sterling Urban Ventures Pvt. Ltd23/11/2022
CMP/221123/0010394-M/s Sterling Urban Ventures Pvt. Ltd23/11/2022
CMP/221123/0010395-M/s Sterling Urban Ventures Pvt. Ltd23/11/2022
CMP/221128/0010410-M/s Sterling Urban Ventures Pvt. Ltd28/11/2022
CMP/221130/0010414-M/s Sterling Urban Ventures Pvt. Ltd30/11/2022
CMP/221209/0010443-M/s Sterling Urban Ventures Pvt. Ltd09/12/2022
CMP/221209/0010445-M/s Sterling Urban Ventures Pvt. Ltd09/12/2022
00029/2023-M/s Sterling Urban Ventures Pvt. Ltd06/01/2023
00033/2023-M/s Sterling Urban Ventures Pvt. Ltd09/01/2023
00508/2023-M/s Sterling Urban Ventures Pvt. Ltd18/04/2023
00514/2023-M/s Sterling Urban Ventures Pvt. Ltd18/04/2023
00050/2024-M/s Sterling Urban Ventures Pvt. Ltd11/01/2024
00187/2024-M/s Sterling Urban Ventures Pvt. Ltd13/02/2024
00347/2024-M/s Sterling Urban Ventures Pvt. Ltd02/04/2024
00615/2024-M/s Sterling Urban Ventures Pvt. Ltd20/06/2024

Documents filed123

As listed on the registration, under the names the promoter filed them with; the newest 80 of 123 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/171026/000563 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Sterling Ascentia Form 4 30-09-2026.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 Ascentia Architect Certificate upto 30-09-26 Dt 01-10-26.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: B V PRAKASH STERLING ASCENTIA ENGINEER CERTIFICATE FORM 6 UP TO 30 SEPT 2026.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Sterling Ascentia Form 4 30-06-2026.pdf9 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, ASCENTIA, RERA Architect (QU) Certificate up to 30 JUNE 2026.pdf9 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: B V PRAKASH STERLING ASCENTIA ENGINEER CERTIFICATE FORM 6 UP TO 30 JUNE 2026.pdf9 Jul 2026
Q1 2026-27 Water supply and sewage board9 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)9 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)9 Jul 2026
Q1 2026-27 KPTCL- BESCOM9 Jul 2026
Q1 2026-27 Fire and Safety9 Jul 2026
Q1 2026-27 Airport Authority of India9 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Ascentia Form4 Mar2026.pdf3 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Architect Certificate Form 5 Ascentia 31-03-26.pdf3 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: EC CERTIFICATE MAR 2026.pdf3 Apr 2026
Q4 2025-26 Water supply and sewage board3 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)3 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)3 Apr 2026
Q4 2025-26 KPTCL- BESCOM3 Apr 2026
Q4 2025-26 Fire and Safety3 Apr 2026
Q4 2025-26 Airport Authority of India3 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Form 4 31122025.pdf7 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: AC Form 5 31122025.pdf7 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: EC Form 6 31122025.pdf7 Jan 2026
Q3 2025-26 Water supply and sewage board7 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)7 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)7 Jan 2026
Q3 2025-26 KPTCL- BESCOM7 Jan 2026
Q3 2025-26 Fire and Safety7 Jan 2026
Q3 2025-26 Airport Authority of India7 Jan 2026
ClarificationFile: Clarification.pdf28 Oct 2025
Consent LettersFile: Consent letter.pdf28 Oct 2025
CertificateFile: SUIPL Incorporation Certificate.pdf-
Project Details-
Modified plan details site plan, floor plans, Plan Licence LetterFile: MD plan license.pdf-
Elevation, Sections, Specifications ( If changes are there )File: suvpl Elevation section plan.pdf-
List Of AllotteesFile: Suvpl List of Allotees.pdf-
List Of ComplaintsFile: SUVPl List of Complaints.pdf-
Consent LetterFile: Consent Letter.pdf-
Chartered Accountant CertificateFile: SUVPL CA Modified1.pdf-
Notarized AffidavitFile: Affidivit.pdf-
Engineer CertificateFile: SUVPL EC Modified Plan.pdf-
Architect CertificateFile: Suvpl AC modified plan.pdf-
Structural Engineer Certificate for stability of structureFile: SUVPL Stability Certificate.pdf-
Modification of Plan DetailsFile: Approved Building Plotting Plan.pdf-
Modification of Plan DetailsFile: Modified plan 01092025.pdf-
Modification of Plan DetailsFile: Commencement Certificate.pdf-
Modification of Plan DetailsFile: Commencement Certificate.pdf-
Modification of Plan DetailsFile: SUVPL List RD plan.pdf-
Modification of Plan DetailsFile: SUVPL list of MD Plan.pdf-
Document 1File: 25112011 AAI NOC.pdf-
Partial Oc Received tower 5 and tower 6File: Partial OC.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Arc Cert for work till date.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Eng Cert for Work till Date.pdf-
CA Certificate for Funds UtilizationFile: CA Certificate for Funds Utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arc Cert for pending work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Eng Cert for Pending Work.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate for Funds required.pdf-
AffidavitFile: Affidavit seeking for Extension.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Affidavit - Consent by Allottees.pdf-
Document 2File: Form B - Project Extension.pdf-
Document 3File: Bank Statement.pdf-
Document 4File: Commencement Cert.pdf-
Document 5File: Compestn Agreement to build.pdf-
Document 6File: Compestn scanned agreement to sell.pdf-
Document 7File: Air force HAL - NOC.pdf-
Document 8File: BESCOM NOC.pdf-
Document 9File: BWSSB NOC.pdf-
Document 10File: FIRE NOC.pdf-
Document 11File: KSPCB NOC.pdf-
Document 12File: SEIAA NOC.pdf-
Document 14File: Ascentia - Sanction Plan.pdf-

How this compares with Bengaluru Urban

97%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one moved by 57 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Sterling Ascentia on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSterling AscentiaOther 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: M/s Sterling Urban Ventures Pvt. Ltd

M/s Sterling Urban Ventures Pvt. Ltd has 1 registration on RERA Karnataka, including Sterling Ascentia. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Sterling Ascentia is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sterling Ascentia?

The registered promoter entity is M/s Sterling Urban Ventures Pvt. Ltd, a company as per the filing. Its CIN U70102KA2007PTC042496 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sterling Ascentia?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sterling Ascentia?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Sterling Ascentia?

The professionals named in the filing: Architect: Venkataraman Associates; Engineer: PRAKASH B V. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sterling Ascentia?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sterling Ascentia. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sterling Ascentia to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.