Sterling Ascentia
By M/s Sterling Urban Ventures Pvt. Ltd
RG-KA-38866 · RERA PRM/KA/RERA/1251/446/PR/171026/000563 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- 30 complaints at RERA Karnataka
- Completion date moved by 57 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
Saved.
Sterling Ascentia is a Residential/Group Housing project by M/s Sterling Urban Ventures Pvt. Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/171026/000563 on 26 Oct 2017. Possession is promised by 30 Sep 2026. The completion date has moved by 57 months from the original filing. 281 of the 290 units on this registration are recorded sold or booked, and 9 of 18 construction stages are filed complete. 30 complaints are on record with the regulator.
At a glance
Project
- NameSterling Ascentia
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/171026/000563
- ReraGenie IDRG-KA-38866
Builder
- NameM/s Sterling Urban Ventures Pvt. Ltd
- Entity typeCompany
- CINU70102KA2007PTC042496
- Authorized SignatoryRamani Sastri
- DirectorShankar Sastri
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on26 Oct 2017
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2021)
- Buildings4 building records
- Documents filed123 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 3 | - | - | - | 59 | 0 | 59 |
| Tower 4 | - | - | - | 59 | 0 | 59 |
| Tower 5 | - | - | - | 86 | 0 | 86 |
| Tower 6 | - | - | - | 86 | 0 | 86 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 18 construction stages are filed complete. The stage furthest along is Dadoing, at 98%.
Building: 97% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 100% |
| Plinth level Beam | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry construction: Bricks, Concrete blocks etc | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 95% |
| Basic work of Water supply, Sanitary and Electrification | 95% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 98% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 95% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | 95% |
| Weather Proof work(tile,concrete) | 95% |
| Painting | 85% |
| Elevation work | 95% |
| Internal and External work including landscapes as per santioned drawings | 85% |
Progress on shared amenities41
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 95% |
| Internal Roads & Footpaths | Yes | 95% |
| Sewage and Drainage System | Yes | 95% |
| Parks & Tree planting | Yes | 75% |
| Street Lighting | Yes | 95% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | 0% |
| Solid waste management and disposal | Yes | 95% |
| Water conservation | No | Not applicable |
| Energy management | Yes | 95% |
| Fire protection and fire safety requirements | Yes | 95% |
| Education/Health/Other public amenities | Yes | 95% |
| Electricity supply transformer and substation | Yes | 95% |
| Emergency Evacuation services | Yes | 95% |
| Storm water drains | Yes | 95% |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 95% |
| Electricity | Yes | 100% |
| Smart Home Automation | Yes | 0% |
| CCTV Surveillance | Yes | 100% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 25% |
| Indoor Sports facility | Yes | 40% |
| Swimming Pool | Yes | 100% |
| Gym | Yes | 80% |
| Parks | Yes | 100% |
| Power Backup | Yes | 100% |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | 100% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 100% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 100% |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas and common storage spaces | Yes | 100% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 196.33 cr | Rs 182.85 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 162.28 cr | Rs 161.91 cr |
| On-site expenditure-Salaries of workers | Rs 79.75 cr | Rs 79.76 cr |
| Payment of taxes | Rs 25.63 cr | Rs 8.48 cr |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Venkataraman Associates |
| Engineer | PRAKASH B V |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc; Shortage of Labour; others
No reason recorded in the filing
Complaints filed with RERA Karnataka30
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/221007/0010064 | - | M/s Sterling Urban Ventures Pvt. Ltd | 07/10/2022 |
| CMP/221021/0010125 | - | M/s Sterling Urban Ventures Pvt. Ltd | 21/10/2022 |
| CMP/221122/0010377 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221122/0010378 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221122/0010379 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221122/0010380 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221122/0010381 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221122/0010382 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221122/0010383 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221122/0010384 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221122/0010385 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221122/0010386 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221122/0010387 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221122/0010388 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221122/0010389 | - | M/s Sterling Urban Ventures Pvt. Ltd | 22/11/2022 |
| CMP/221123/0010390 | - | M/s Sterling Urban Ventures Pvt. Ltd | 23/11/2022 |
| CMP/221123/0010394 | - | M/s Sterling Urban Ventures Pvt. Ltd | 23/11/2022 |
| CMP/221123/0010395 | - | M/s Sterling Urban Ventures Pvt. Ltd | 23/11/2022 |
| CMP/221128/0010410 | - | M/s Sterling Urban Ventures Pvt. Ltd | 28/11/2022 |
| CMP/221130/0010414 | - | M/s Sterling Urban Ventures Pvt. Ltd | 30/11/2022 |
| CMP/221209/0010443 | - | M/s Sterling Urban Ventures Pvt. Ltd | 09/12/2022 |
| CMP/221209/0010445 | - | M/s Sterling Urban Ventures Pvt. Ltd | 09/12/2022 |
| 00029/2023 | - | M/s Sterling Urban Ventures Pvt. Ltd | 06/01/2023 |
| 00033/2023 | - | M/s Sterling Urban Ventures Pvt. Ltd | 09/01/2023 |
| 00508/2023 | - | M/s Sterling Urban Ventures Pvt. Ltd | 18/04/2023 |
| 00514/2023 | - | M/s Sterling Urban Ventures Pvt. Ltd | 18/04/2023 |
| 00050/2024 | - | M/s Sterling Urban Ventures Pvt. Ltd | 11/01/2024 |
| 00187/2024 | - | M/s Sterling Urban Ventures Pvt. Ltd | 13/02/2024 |
| 00347/2024 | - | M/s Sterling Urban Ventures Pvt. Ltd | 02/04/2024 |
| 00615/2024 | - | M/s Sterling Urban Ventures Pvt. Ltd | 20/06/2024 |
Documents filed123
As listed on the registration, under the names the promoter filed them with; the newest 80 of 123 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/171026/000563 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Sterling Ascentia Form 4 30-09-2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 Ascentia Architect Certificate upto 30-09-26 Dt 01-10-26.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: B V PRAKASH STERLING ASCENTIA ENGINEER CERTIFICATE FORM 6 UP TO 30 SEPT 2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Sterling Ascentia Form 4 30-06-2026.pdf | 9 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, ASCENTIA, RERA Architect (QU) Certificate up to 30 JUNE 2026.pdf | 9 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: B V PRAKASH STERLING ASCENTIA ENGINEER CERTIFICATE FORM 6 UP TO 30 JUNE 2026.pdf | 9 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 9 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 9 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 9 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 9 Jul 2026 |
| Q1 2026-27 Fire and Safety | 9 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 9 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Ascentia Form4 Mar2026.pdf | 3 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Architect Certificate Form 5 Ascentia 31-03-26.pdf | 3 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: EC CERTIFICATE MAR 2026.pdf | 3 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 3 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 3 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 3 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 3 Apr 2026 |
| Q4 2025-26 Fire and Safety | 3 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 3 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Form 4 31122025.pdf | 7 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: AC Form 5 31122025.pdf | 7 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: EC Form 6 31122025.pdf | 7 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 7 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 7 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 7 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 7 Jan 2026 |
| Q3 2025-26 Fire and Safety | 7 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 7 Jan 2026 |
| ClarificationFile: Clarification.pdf | 28 Oct 2025 |
| Consent LettersFile: Consent letter.pdf | 28 Oct 2025 |
| CertificateFile: SUIPL Incorporation Certificate.pdf | - |
| Project Details | - |
| Modified plan details site plan, floor plans, Plan Licence LetterFile: MD plan license.pdf | - |
| Elevation, Sections, Specifications ( If changes are there )File: suvpl Elevation section plan.pdf | - |
| List Of AllotteesFile: Suvpl List of Allotees.pdf | - |
| List Of ComplaintsFile: SUVPl List of Complaints.pdf | - |
| Consent LetterFile: Consent Letter.pdf | - |
| Chartered Accountant CertificateFile: SUVPL CA Modified1.pdf | - |
| Notarized AffidavitFile: Affidivit.pdf | - |
| Engineer CertificateFile: SUVPL EC Modified Plan.pdf | - |
| Architect CertificateFile: Suvpl AC modified plan.pdf | - |
| Structural Engineer Certificate for stability of structureFile: SUVPL Stability Certificate.pdf | - |
| Modification of Plan DetailsFile: Approved Building Plotting Plan.pdf | - |
| Modification of Plan DetailsFile: Modified plan 01092025.pdf | - |
| Modification of Plan DetailsFile: Commencement Certificate.pdf | - |
| Modification of Plan DetailsFile: Commencement Certificate.pdf | - |
| Modification of Plan DetailsFile: SUVPL List RD plan.pdf | - |
| Modification of Plan DetailsFile: SUVPL list of MD Plan.pdf | - |
| Document 1File: 25112011 AAI NOC.pdf | - |
| Partial Oc Received tower 5 and tower 6File: Partial OC.pdf | - |
| Architect Certificate for Work Completion Schedule till DateFile: Arc Cert for work till date.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Eng Cert for Work till Date.pdf | - |
| CA Certificate for Funds UtilizationFile: CA Certificate for Funds Utilization.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Arc Cert for pending work.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Eng Cert for Pending Work.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: CA Certificate for Funds required.pdf | - |
| AffidavitFile: Affidavit seeking for Extension.pdf | - |
| Latest Encumbrance CertificateFile: EC.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx | - |
| Document 1File: Affidavit - Consent by Allottees.pdf | - |
| Document 2File: Form B - Project Extension.pdf | - |
| Document 3File: Bank Statement.pdf | - |
| Document 4File: Commencement Cert.pdf | - |
| Document 5File: Compestn Agreement to build.pdf | - |
| Document 6File: Compestn scanned agreement to sell.pdf | - |
| Document 7File: Air force HAL - NOC.pdf | - |
| Document 8File: BESCOM NOC.pdf | - |
| Document 9File: BWSSB NOC.pdf | - |
| Document 10File: FIRE NOC.pdf | - |
| Document 11File: KSPCB NOC.pdf | - |
| Document 12File: SEIAA NOC.pdf | - |
| Document 14File: Ascentia - Sanction Plan.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Sterling Ascentia on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 14 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: M/s Sterling Urban Ventures Pvt. Ltd
M/s Sterling Urban Ventures Pvt. Ltd has 1 registration on RERA Karnataka, including Sterling Ascentia. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Sterling Ascentia is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Sterling Ascentia?
The registered promoter entity is M/s Sterling Urban Ventures Pvt. Ltd, a company as per the filing. Its CIN U70102KA2007PTC042496 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Sterling Ascentia?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Sterling Ascentia?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Sterling Ascentia?
The professionals named in the filing: Architect: Venkataraman Associates; Engineer: PRAKASH B V. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sterling Ascentia?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.