ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / SS South Crest

Registration approved Residential/Group Housing project

SS South Crest

By Shri Shabari Infrastructures

RG-KA-22283 · RERA PRM/KA/RERA/1251/310/PR/171016/000595

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2019Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 54 documents Report an error

SS South Crest is a Residential/Group Housing project by Shri Shabari Infrastructures in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171016/000595 on 16 Oct 2017. Possession is promised by 30 Sep 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameSS South Crest
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/171016/000595
  • ReraGenie IDRG-KA-22283

Builder

  • NameShri Shabari Infrastructures
  • Entity typePartnership Firm
  • Authorized SignatoryMS Subramani
  • OthersRavi V, Pramod Singh

Key dates

this monthRegisteredOct 2017First promiseSep 2018Revised toSep 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 Oct 2017
  • Promised completion30 Sep 2019
  • Revised completionRevised to 30 Sep 2019 (originally 30 Sep 2018)
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SS South Crest---88088

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,934 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 12.65 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR Surendran
EngineerR Jagadish

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/191014/000595Sep 2018 → Sep 2019

Reason as filed by the promoterFinancial crunch

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed54

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171016/000595 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: SSI - Regn.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Arc certificate - work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg certificate - work completed.pdf-
CA Certificate for Funds UtilizationFile: CA certificate - Fund utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arc certificate - work pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg certificate - work pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA certificate - Funds required.pdf-
AffidavitFile: Affidavit (form B).jpeg-
Latest Encumbrance Certificate-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.png-
Document 1-
CC - South Crest-
Site Plan (Sanctioned) - 1-
BW_PDF0012-02-
Sale Deed - Draft-
Sale Agreement - Draft-
Sale Deed Ramaswamy-
BW_PDF0012-03-
Area statement-
Allotment letter-
SS_South_Crest_Brochure_New-
PC - NOC-
Specification-
EC from 10 Apr 2014 to 14 Nov 16-
Khata-
JDA - SS South Crest-
GPA SS South Crest-
Conversion Order-
PC - NOC-
Balance Sheet 2015 - 2016File: BS_-_2016.pdf-
Balance Sheet 2014 - 2015File: BS - 2015.pdf-
Balance Sheet 2013 - 2014File: BS - 2014.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Auditors report.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Auditors report.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Auditors report.pdf-
Director's Report 2015 - 2016File: Directors Report.pdf-
Director's Report 2014 - 2015File: Directors Report.pdf-
Director's Report 2013 - 2014File: Directors Report.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow.pdf-
Cash Flow Statement 2014 - 2015File: Cash Flow.pdf-
Auditor's Report 2015 - 2016File: Auditors report.pdf-
Auditor's Report 2014 - 2015File: Auditors report.pdf-
Auditor's Report 2013 - 2014File: Auditors report.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: IT Ack - 2016.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: IT Ack - 2015.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: IT Ack - 2014.pdf-
Declaration (Form B)-
Prospectus/BrochureFile: SS_South_Crest_Brochure_New.pdf-
Advertisement Copy 1File: WhatsApp Image 2018-12-03 at 6.03.50 PM.jpeg-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_171016_000595.xlsx-
Occupancy CertificateFile: Completion Cert Applied.pdf-
Completion certificateFile: Completion Cert Applied.pdf-
Registered Agreement of SaleFile: Sale Deed - 1B - South Crest - Rera.pdf-
Registered conveyance deed for an individual unitFile: Sale Deed - 1B - South Crest - Rera.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SS South Crest on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Shri Shabari Infrastructures

Shri Shabari Infrastructures has 1 registration on RERA Karnataka, including SS South Crest. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SS South Crest is delayed beyond 30 Sep 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SS South Crest?

The registered promoter entity is Shri Shabari Infrastructures, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SS South Crest?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SS South Crest?

The professionals named in the filing: Architect: R Surendran; Engineer: R Jagadish. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SS South Crest?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SS South Crest. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SS South Crest to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.