ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / SRNR DAFFODIL

Registration approved No litigation declared Residential/Group Housing project

SRNR DAFFODIL

By SRNR CONSTRUCTIONS LLP

RG-KA-98913 · RERA PRM/KA/RERA/1251/472/PR/220922/005262 · Last updated on RERA Karnataka portal: 21 Sep 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 83 documents Report an error

SRNR DAFFODIL is a Residential/Group Housing project by SRNR CONSTRUCTIONS LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/220922/005262 on 22 Sep 2022. Possession is promised by 31 Dec 2024.

At a glance

Project

  • NameSRNR DAFFODIL
  • TypeResidential/Group Housing
  • Location
    • Yelahanka
    • Bengaluru Urban
    • 560064
  • Pincode560064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/472/PR/220922/005262
  • ReraGenie IDRG-KA-98913

Builder

  • NameSRNR CONSTRUCTIONS LLP
  • Entity typePartnership Firm
  • LLPINAAV-8813
  • GSTIN29AEJFS3753D1ZT
  • Authorized SignatorySUDHAKARA REDDY ANNEM

Key dates

this monthRegisteredSep 2022PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on22 Sep 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SRNR DAFFODIL---36036

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 21 Sep 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 21 Sep 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesYes-

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,672 sq m
Named landowners2
LandownerVillageDistrict
Evelyn Lobo--
Robert Sabin Lobo--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 9.97 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 9.45 cr-
On-site expenditure-Consultants FeesRs 25.00 lakh-
Payment of taxesRs 25.00 lakh-
On-site expenditure-Site OverheadRs 2.20 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRaju
EngineerBhaskar Y
Chartered AccountantGIRI PRASAD AND ASSOCIATES

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed83

As listed on the registration, under the names the promoter filed them with; the newest 80 of 83 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/220922/005262 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Amended partnership deed/Reconstitution DeedFile: Reconstitution Deed.pdf21 Sep 2022
BWSSB NOCFile: BANGALORE WATER SUPPLY AND SEWERAGE BOARD.pdf16 Sep 2022
BWSSB Fee receiptFile: SRNR BWSSB Online payment receipt.pdf16 Sep 2022
Reconstitution DeedFile: Reconstitution Deed.pdf16 Sep 2022
BWSSB fee receipt confirmationFile: BWSSB FEE RECEIPT CINFIRMATION.pdf16 Sep 2022
fee receipt paid towards BESCOM NOCFile: BESCOM NOC FEE.png1 Sep 2022
STP LocationFile: STP LOCATION.pdf1 Sep 2022
STP design DrawingFile: STP Design.pdf1 Sep 2022
stability certificateFile: Stability Certificate.pdf1 Sep 2022
BWSSB NOCFile: BWSSB NOC_merged.pdf1 Sep 2022
joint affidavit decalartionFile: Affidavit Cum Declaration.pdf1 Sep 2022
9000 sqft Katha for C25/1 & C25/2File: 3-1-2020.pdf1 Sep 2022
9000 sqft Katha for C26/1 & C26/2File: 20-4-2021.pdf1 Sep 2022
SRNR CONSTRUCTIONS LLP KathaFile: 27-4-2021.pdf1 Sep 2022
6600 Sqft KathaFile: katha no 931.pdf1 Sep 2022
2400 sqft KathaFile: katha no 932.pdf1 Sep 2022
Sale DeedFile: sale deed no 34-2007-08.pdf1 Sep 2022
need to clarify which converted land is taken for the project Sy No.55File: conversion order.pdf2 Aug 2022
need chain of sale deeds from conversion land owners to rifco safari encalve pvt ltdFile: Sale Deed.pdf2 Aug 2022
need local authorithy katha in the name of robert sabastian lobo for ext 4500+4500 sqfeet(c-26/A,c-2File: Katha C26.pdf2 Aug 2022
need local authorithy katha in the name of aninha joana rita menezes and antonio maria menezesFile: C25 katha.pdf2 Aug 2022
need to upload advocate search reportFile: advocate search report.pdf2 Aug 2022
need notrazied form bFile: Form B.pdf2 Aug 2022
need joint affidavit cum declartionsFile: jd affidavit.pdf2 Aug 2022
no litigation affidavit is not notraziedFile: Affidavit Non Litigation.pdf2 Aug 2022
Need to upload the certified copy obtained by the concerned Sub-registrar regarding value of theFile: valuation.pdf2 Aug 2022
Upload Single Plot Layout PlanFile: single plot layout.pdf2 Aug 2022
Upload Layout OrderFile: single plot.pdf2 Aug 2022
Upload Building License.File: Licence Fee BBMP.pdf2 Aug 2022
Upload the Architect Details With Valid COA NumberFile: Form-2 Architect certificate.pdf2 Aug 2022
Uploaded proforma of Agreement for Sale (AFS) not in accordance with notified AFS. Therefore pleaseFile: aos of SRNR DAFFODIL rera draft new.pdf2 Aug 2022
Please upload the signed copy of project specification comprising with the project name and addressFile: Specifications.pdf2 Aug 2022
RTC, survey 37-
Mutation, survey 37-
Encumbrance Certificate, survey 37-
Conversion/Alienation Order, survey 37-
Sale/Title/Gift Deed, survey 37-
JDA, survey 37-
Khatha, survey 37-
Registration CertificateFile: Certificate of LLP Incorporation.PDF-
Partnership DeedFile: Partnership LLP Deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 CA Certificate_compressed.pdf-
Certificate issued by Architect Form 2File: Form-2 Architect certificate.pdf-
Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit.pdf-
Certificate from Chartered AccountFile: Form 1 CA Certificate_compressed.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Income Tax.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ACK income Tax.pdf-
cc_BBMP_EoDB_CH_26731_21-22-
BESCOM NOC-
BWSSB NOC-
Plan BBMP-
Specifications-
Plan BBMP-
Specifications-
Structural Stability Certificate-
JDA-
Sale Agreement -
Application Form -
05[1]-
Declaration-Form B--
Notarized Affidavit for 3(1) Voliation-
Joint Affidavit from Promoter and Landowner-
BESCOM NOC-
KSPCB NOC-
KSPCB NOC-
EC-
Robert Lobo C26A Sale Deed_20210323_0001-
Robert Lobo C26B Sale Deed_20210323_0001-
Sale Deed C25-
Sale Deed C25:1-
SRNR Katha-
Prospectus/BrochureFile: 05[1].pdf-
Occupancy CertificateFile: SRNR OC.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SRNR DAFFODIL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSRNR DAFFODILOther 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 31 registered projects within 2 km.

Builder: SRNR CONSTRUCTIONS LLP

SRNR CONSTRUCTIONS LLP has 1 registration on RERA Karnataka, including SRNR DAFFODIL. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SRNR DAFFODIL is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SRNR DAFFODIL?

The registered promoter entity is SRNR CONSTRUCTIONS LLP, a partnership firm as per the filing. Its LLPIN AAV-8813 and GSTIN 29AEJFS3753D1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SRNR DAFFODIL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SRNR DAFFODIL?

The professionals named in the filing: Architect: Raju; Engineer: Bhaskar Y; Chartered Accountant: GIRI PRASAD AND ASSOCIATES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SRNR DAFFODIL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SRNR DAFFODIL. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SRNR DAFFODIL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.