Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Aug 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 86 documents Report an error

SRI VIDHATHRI ENCLAVE is a Residential/Group Housing project by SRI VIDHATHRI CONSTRUCTIONS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/041122/005403 on 4 Nov 2022. Possession is promised by 20 Aug 2025.

At a glance

Project

  • NameSRI VIDHATHRI ENCLAVE
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/308/PR/041122/005403
  • ReraGenie IDRG-KA-16167

Builder

  • NameSRI VIDHATHRI CONSTRUCTIONS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45209KA2020PTC142329
  • GSTIN29ABFCS1190J1Z1
  • Authorized SignatoryPAPARAO ERUKU
  • MdPAPARAO ERUKU
  • DirectorsPAPARAO ERUKU, GOPI KRISHNA PURAM, SANTOSH KUMAR BHALKE, SATYADEEP YADA
  • Project HeadPAPARAO ERUKU

Key dates

this monthRegisteredNov 2022PromisedAug 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on4 Nov 2022
  • Promised completion20 Aug 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1---56056

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 21 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 21 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Mr. Babu Mohammed Basha--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 13.68 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 12.88 cr-
Payment of taxesRs 40.00 lakh-
On-site expenditure-Consultants FeesRs 20.00 lakh-
Administrative CostsRs 20.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectT.N.S. Chakravarthi
EngineerI Veeraiah
Chartered AccountantGOLLAPUDI SAIDULU

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed86

As listed on the registration, under the names the promoter filed them with; the newest 80 of 86 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/041122/005403 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Audit Report 2021File: Auditor Report 2021.pdf21 Oct 2022
Director Report 2021File: Director Report.pdf21 Oct 2022
Cashflow Statement 2021File: Cash Flow Statement.pdf21 Oct 2022
Balance Sheet 2021File: BS 2021.pdf21 Oct 2022
Profit & LossFile: PL 2021.pdf21 Oct 2022
ITR 2021File: ITR 2021 22.pdf21 Oct 2022
Title deed of khamarunnisaFile: Title Deed MR Old 85 1.pdf21 Oct 2022
Local authorithy katha in form 9File: Form 9 11 katha 85 1.pdf21 Oct 2022
Hissa phody copyFile: Hiss Podi 85 1.pdf21 Oct 2022
AkarbandFile: Akarbandh.pdf21 Oct 2022
survey sketchFile: Survey Sketch.pdf21 Oct 2022
Building License Given by the local authorityFile: Buiding License by Local Authority.pdf21 Oct 2022
structural safety CertificateFile: stability certificate.pdf21 Oct 2022
Fee receipt paid towards water supply NOCFile: Water supply Noc & Fee Paid Receipt.pdf21 Oct 2022
Estimated cost of construction certified by the EngineerFile: Engineer Certificate.pdf21 Oct 2022
Estimated cost of construction certified by the EngineerFile: Estimatation Abstract.pdf21 Oct 2022
RTC, survey 85/1-
Mutation, survey 85/1-
Encumbrance Certificate, survey 85/1-
Conversion/Alienation Order, survey 85/1-
JDA, survey 85/1-
Khatha, survey 85/1-
Registration CertificateFile: CERTIFICATE OF INCORPORATION.PDF-
Organization StructureFile: Organisation Structure.jpeg-
Certificate issued by CA Form 1File: CA Certificate.pdf-
Certificate issued by Architect Form 2File: Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: No litigaton.pdf-
Certificate from Chartered AccountFile: CA Certificate.pdf-
Balance Sheet 2021 - 2022File: BS 2022.pdf-
Audited Profit and Loss Statement 2021 - 2022File: PL 2022.pdf-
Director's Report 2021 - 2022File: Director Report.pdf-
Cash Flow Statement 2021 - 2022File: Cashflow Statement.pdf-
Auditor's Report 2021 - 2022File: Audit Report.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 2022.pdf-
Building Licence-
Approved Building-
Approved Building-
Project specifications-
Approved Building-
CDP-
legal report-
JDA-
Proforma of Agreement for Sale-
Allotment Letter-
Brochure NA-
Form B Affidavit-
Sectin 3 Affidavit-
JDA Affidavit-
Bescom NOC-
Bwssb Noc-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
KSPCB-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Village Map-
Guidence Value Certificate-
No Mortgage Affidavit-
Gift Deed-
STP-
GPA-
akarbandh-
CDP-
Approved Building-
Estimate Breakup details-
MR Old 85 1-
Stability CertificateFile: Stability Certificate (Sri Vidhathri Constructions PVT LTD).pdf-
Occupancy CertificateFile: Enclave OC.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SRI VIDHATHRI ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SRI VIDHATHRI CONSTRUCTIONS PRIVATE LIMITED

SRI VIDHATHRI CONSTRUCTIONS PRIVATE LIMITED has 1 registration on RERA Karnataka, including SRI VIDHATHRI ENCLAVE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SRI VIDHATHRI ENCLAVE is delayed beyond 20 Aug 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SRI VIDHATHRI ENCLAVE?

The registered promoter entity is SRI VIDHATHRI CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Its CIN U45209KA2020PTC142329 and GSTIN 29ABFCS1190J1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SRI VIDHATHRI ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SRI VIDHATHRI ENCLAVE?

The professionals named in the filing: Architect: T.N.S. Chakravarthi; Engineer: I Veeraiah; Chartered Accountant: GOLLAPUDI SAIDULU. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SRI VIDHATHRI ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SRI VIDHATHRI ENCLAVE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SRI VIDHATHRI ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.