Home / Browse projects / Bengaluru Urban, Karnataka / SRI RAMA ENCLAVE
SRI RAMA ENCLAVE
By MEGA INFRA
RG-KA-45552 · RERA PRM/KA/RERA/1251/472/PR/220424/006824 · Last updated on RERA Karnataka portal: 24 Jan 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SRI RAMA ENCLAVE is a Residential/Group Housing project by MEGA INFRA in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/220424/006824 on 22 Apr 2024. Possession is promised by 30 Sep 2026.
At a glance
Project
- NameSRI RAMA ENCLAVE
- TypeResidential/Group Housing
- Location
- Yelahanka
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/472/PR/220424/006824
- ReraGenie IDRG-KA-45552
Builder
- NameMEGA INFRA
- Entity typePartnership Firm
- GSTIN29ABLFM1097K1ZN
- Authorized SignatoryT DHANANJAYA
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Apr 2024
- Promised completion30 Sep 2026
- Revised completionNone
- Buildings2 building records
- Documents filed107 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER A | - | - | - | 36 | 0 | 36 |
| TOWER B | - | - | - | 28 | 0 | 28 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 24 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities41
As on 24 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | - |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
| Stlit Floor | Yes | - |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| T G CHANDRU | - | - |
| JAYALAKSHMI | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 24.31 cr | - |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 1.50 cr | - |
| Payment of taxes | Rs 1.00 cr | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 75.00 lakh | - |
| On-site expenditure-Salaries of workers | Rs 50.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 20.00 lakh | - |
| On-site expenditure-Site Overhead | Rs 20.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | G Bhanumathy |
| Engineer | Arun Kumar S R |
| Chartered Accountant | RADHAKRISHAN TANTRY |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed107
As listed on the registration, under the names the promoter filed them with; the newest 80 of 107 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/220424/006824 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Q3.pdf | 24 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Arc Q3.pdf | 24 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Eng Q3.pdf | 24 Jan 2026 |
| Village Map showing Proposed SiteFile: Village Map with Proposed Site.pdf | 19 Apr 2024 |
| CDP Map showing Proposed SiteFile: CDP with Proposed Site.pdf | 19 Apr 2024 |
| KSPCB NOC - NewFile: KSPCB - New.pdf | 19 Apr 2024 |
| Land Cost Calculation SheetFile: Land Cost Computation.pdf | 19 Apr 2024 |
| ZR CopyFile: ZR Copy.pdf | 19 Apr 2024 |
| Self attested copy of the Engineer license certificateFile: Engineer Certificate.pdf | 19 Apr 2024 |
| Certified Carpet AreaFile: Carpet Area Certified.pdf | 19 Apr 2024 |
| Financials FY 2022-23 with UDINFile: Mega Infra - ITR - FY 2022-23 WITH udin.pdf | 19 Apr 2024 |
| Covering LetterFile: Reply to quer.pdf | 19 Apr 2024 |
| RTC, survey 181/9B | - |
| Mutation, survey 181/9B | - |
| Encumbrance Certificate, survey 181/9B | - |
| Conversion/Alienation Order, survey 181/9B | - |
| JDA, survey 181/9B | - |
| Khatha, survey 181/9B | - |
| RTC, survey 181/10 | - |
| Mutation, survey 181/10 | - |
| Encumbrance Certificate, survey 181/10 | - |
| Conversion/Alienation Order, survey 181/10 | - |
| JDA, survey 181/10 | - |
| Khatha, survey 181/10 | - |
| Registration CertificateFile: Form C Mega.pdf | - |
| Partnership DeedFile: Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Registration Certificate.pdf | - |
| Certificate issued by Architect Form 2File: form -2.pdf | - |
| Certificate issued by Engineer Form 3File: Form-3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non litigation.pdf | - |
| Certificate from Chartered AccountFile: Cost Approval Certificate.pdf | - |
| Balance Sheet 2021 - 2022File: Balance Sheet 22-23.pdf | - |
| Balance Sheet 2020 - 2021File: Balance Sheet 21-22.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: P and L 22-23.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: P and L 21-22.pdf | - |
| Cash Flow Statement 2022 - 2023File: No Cash Flow.pdf | - |
| Cash Flow Statement 2021 - 2022File: No Cash Flow.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: ITR Ack 22-23.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: ITR Ack 21-22.pdf | - |
| CC + receipt | - |
| BESCOM | - |
| BWSSB NOC | - |
| Approved plan | - |
| Section Drawing and Specs | - |
| Section Drawing of the Apartment | - |
| Project Specs | - |
| Approved plan | - |
| Approved plan | - |
| Structural Stability Certificate | - |
| Advocate Search Report | - |
| Sharing Agreement | - |
| Conversion Copies | - |
| BBMP Property Tax Receipt | - |
| Proforma Agreement of Sale | - |
| Allotment Letter | - |
| form B | - |
| 3 1 violation | - |
| Joint affidavit - land owner | - |
| BESCOM | - |
| BWSSB NOC | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SRI RAMA ENCLAVE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: MEGA INFRA
MEGA INFRA has 1 registration on RERA Karnataka, including SRI RAMA ENCLAVE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SRI RAMA ENCLAVE is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SRI RAMA ENCLAVE?
The registered promoter entity is MEGA INFRA, a partnership firm as per the filing. Its GSTIN 29ABLFM1097K1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SRI RAMA ENCLAVE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SRI RAMA ENCLAVE?
The professionals named in the filing: Architect: G Bhanumathy; Engineer: Arun Kumar S R; Chartered Accountant: RADHAKRISHAN TANTRY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SRI RAMA ENCLAVE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback