ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / SRI MURARI GRAND

Registration approved Residential/Group Housing project

SRI MURARI GRAND

By SRI MURARI BUILDERS

RG-KA-10562 · RERA PRM/KA/RERA/1251/310/PR/210409/004118 · Last updated on RERA Karnataka portal: 5 Apr 2021

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Aug 2023Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 55 documents Report an error

SRI MURARI GRAND is a Residential/Group Housing project by SRI MURARI BUILDERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/210409/004118 on 9 Apr 2021. Possession is promised by 30 Aug 2023.

At a glance

Project

  • NameSRI MURARI GRAND
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/210409/004118
  • ReraGenie IDRG-KA-10562

Builder

  • NameSRI MURARI BUILDERS
  • Entity typePartnership Firm
  • Authorized SignatoryS. J. JANARDANA
  • OthersS. J. JANARDANA, M.S. BABU, M. JYOTHSNA, M.SUDHAKAR, P.B. GAYATHRI

Key dates

this monthRegisteredApr 2021PromisedAug 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 Apr 2021
  • Promised completion30 Aug 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sri Murari Grands---40040

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 5 Apr 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 5 Apr 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable

Land and ownership5

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area915 sq m
Named landowners5
LandownerVillageDistrict
P.B.GAYATHRI--
S.J.JANARDANA--
M. JYOTHSNA--
M.SUDHAKAR--
M.S.BABU--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 5.99 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV. Sivakumar
EngineerSRINIVAS RAO BOLIMUNTA

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed55

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/210409/004118 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
DECLARATION FOR KSPCBFile: Declaration for KSPCB.pdf5 Apr 2021
EXTRACT FROM SANCTION PLAN FOR BWSSB NOCFile: BWSSB NOC.pdf24 Mar 2021
KHATHAT EXTRACTFile: KHATHA EXTRACT.pdf17 Mar 2021
COMMENCEMENT CERTIFICATE NA-
approved plan -
approved plan -
Sale Deed-
Agreement of Sale-
SALE DEED RTC-
approved plan -
CDP PLAN -
ALLOTMENT LETTER-
DESCRIPTION OF SPECIFICATIONS-
EC MURARI BUILDER-
NON VIOLATION OF SEC 3-
KHATHA BBMP-
Unnamed document-
CONVERSTION ORDER-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
BWSSB NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
approved plan -
approved plan -
CONVERSTION ORDER-
Unnamed document-
Balance Sheet 2019 - 2020File: SRI MURARI BS 19 20.pdf-
Balance Sheet 2018 - 2019File: SRI MURARI BS 19.pdf-
Balance Sheet 2017 - 2018File: SRI MURARI BS 2018.pdf-
Audited Profit and Loss Statement 2019 - 2020File: SRI MURARI PL 19 20.pdf-
Audited Profit and Loss Statement 2018 - 2019File: SRI MURARI PL 19.pdf-
Audited Profit and Loss Statement 2017 - 2018File: SRI MURARI PL 2018.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITRV 2020 21.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITRV 2019 20.pdf-
FORM B-
Prospectus/BrochureFile: Sri Murari Grand Broucher.pdf-
Advertisement Copy 1File: Advertisement ccopy.png-
Tower Excel SheetFile: PRMKARERA1251310PR210409004118.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SRI MURARI GRAND on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSRI MURARI GRANDOther 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: SRI MURARI BUILDERS

SRI MURARI BUILDERS has 1 registration on RERA Karnataka, including SRI MURARI GRAND. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SRI MURARI GRAND is delayed beyond 30 Aug 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SRI MURARI GRAND?

The registered promoter entity is SRI MURARI BUILDERS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SRI MURARI GRAND?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SRI MURARI GRAND?

The professionals named in the filing: Architect: V. Sivakumar; Engineer: SRINIVAS RAO BOLIMUNTA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SRI MURARI GRAND?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SRI MURARI GRAND. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SRI MURARI GRAND to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.