Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SRI LAKSHMI VALLABHA VISTA is a Residential/Group Housing project by SRI LAKSHMI VALLABHA BUILDERS LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/220926/008958 on 22 Sep 2026. Possession is promised by 25 Aug 2030.
At a glance
Project
- NameSRI LAKSHMI VALLABHA VISTA
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 560075
- Pincode560075
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/220926/008958
- ReraGenie IDRG-KA-23582
Builder
- NameSRI LAKSHMI VALLABHA BUILDERS LLP
- Entity typePartnership Firm
- LLPINACL-8458
- GSTIN29AFNFS3155C1ZT
- Authorized SignatoryMallika
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Sep 2026
- Promised completion25 Aug 2030
- Revised completionNone
- Buildings1 building record
- Documents filed78 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLOCK-A | - | - | - | 32 | 0 | 32 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 18 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | - |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 18 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SRI LAKSHMI VALLABHA BUILDERS LLP | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 32.44 cr | - |
| On-site expenditure-Site Overhead | Rs 36.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 30.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | G VINAY KUMAR |
| Engineer | G VINAY KUMAR |
| Chartered Accountant | P VENKOBI |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed78
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/220926/008958 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| SECTION 3 NOTARIZED AFFIDAVITFile: SECTION 3 NOTARIZED AFFIDAVIT.pdf | 18 Sep 2026 |
| BESCOM NOCFile: VALLABHA BESCOM NOC.pdf | 18 Sep 2026 |
| FORM-3 ENGINEER CERTIFICATEFile: FORM-3 ENGG CERTIFICATE.pdf | 18 Sep 2026 |
| COST ESTIMATIONFile: COST ESTIMATION.pdf | 18 Sep 2026 |
| ENGINEER LICENCEFile: ENGG LICENCE WITH DECLARATION.pdf | 18 Sep 2026 |
| WATER NOC AND SOURCE OF WATER DECLARATION AFFIDAVITFile: WATER NOC AND SOURCE DECLARATION AFFIDAVIT.pdf | 18 Sep 2026 |
| BWSSB DEMAND NOTEFile: BWSSB DEMAND NOTE.pdf | 18 Sep 2026 |
| FORM-1 CA CERTIFICATEFile: FORM 1 SRI LAKSHMI VALLABHA VISTA.pdf | 11 Sep 2026 |
| FORM-2 ARCHITECT CERTIFICATEFile: FORM-2 ARCHITECT CERTIFICATE.pdf | 11 Sep 2026 |
| FORM-3 ENGINEER CERTIFICATEFile: FORM-3 ENGINEER CERTIFICATE.pdf | 11 Sep 2026 |
| SECTION 3 AFFIDAVITFile: SECTION 3 AFFIDAVIT.pdf | 11 Sep 2026 |
| FORM-B AFFIDAVITFile: FORM-B AFFIDAVIT UPDATED.pdf | 11 Sep 2026 |
| NON LITIGATION AFFIDAVITFile: NON LITIGATION AFFIDAVIT.pdf | 11 Sep 2026 |
| LOCATION DETAILSFile: gps location.jpeg | 11 Sep 2026 |
| LOCATION DETAILSFile: SITE LOCATION LATITUDE AND LONGINTUTE.jpeg | 11 Sep 2026 |
| WATER NOCFile: bwssb noc.pdf | 11 Sep 2026 |
| KSPCB NOCFile: pollution board.pdf | 11 Sep 2026 |
| PAN DIGITAL SIGNEDFile: DIGITIAL SIGNED PAN.pdf | 11 Sep 2026 |
| FINANCIALS 2025-26File: FINANCIALS FY 2025-26.pdf | 11 Sep 2026 |
| ITR 2025-26File: ITR FY 2025-26.pdf | 11 Sep 2026 |
| FINANCIALS DECLARATIONFile: NO FINANCIALS DECLARATION.pdf | 11 Sep 2026 |
| EC UPTO DATEFile: EC 2025-26_merged.pdf | 11 Sep 2026 |
| ADVOCATE SEARCH REPORTFile: ADVOCATE SEARCH REPORT.pdf | 11 Sep 2026 |
| ADLR DECLARATIONFile: ADLR DECLARATION.pdf | 11 Sep 2026 |
| ORIGINAL SANCTIONED PLANFile: SANCTIONED PLAN.pdf | 11 Sep 2026 |
| CDP DEMARCATIONFile: CDP DEMARKED.pdf | 11 Sep 2026 |
| KHATHAFile: KHATHA.pdf | 11 Sep 2026 |
| ENGINEER LICENCEFile: BBMP-LICENSE RENEWAL.pdf | 11 Sep 2026 |
| STRUCTURAL STABILITY CERTIFICATEFile: STRUCTURAL STABILITY CERTIFICATE.pdf | 11 Sep 2026 |
| STP DECLARATIONFile: STP DECLARATION.pdf | 11 Sep 2026 |
| STP DECLARATION AFFIDAVITFile: STP DECLARATION AFFIDAVIT.pdf | 11 Sep 2026 |
| WATER NOCFile: bwssb noc.pdf | 11 Sep 2026 |
| DECLARATION OF UNITSFile: DECLARATION OF UNITS.pdf | 11 Sep 2026 |
| LAND COST CALCULATIONFile: LAND COST CALCULATION.pdf | 11 Sep 2026 |
| AGREEMENT FOR SALE UPDATEDFile: AGREEMENT FOR SALE UPDATED.pdf | 11 Sep 2026 |
| ALLOTMENT LETTER UPDATEDFile: ALLOTMENT LETTER UPDATED.pdf | 11 Sep 2026 |
| RTC, survey 2/1 & 2 | - |
| Mutation, survey 2/1 & 2 | - |
| Encumbrance Certificate, survey 2/1 & 2 | - |
| Sale/Title/Gift Deed, survey 2/1 & 2 | - |
| Khatha, survey 2/1 & 2 | - |
| Registration CertificateFile: REGD CERTIFICATE SLV BUILDERS LLP.pdf | - |
| GST CertificateFile: GST CERTIFICATE.pdf | - |
| Partnership DeedFile: LLP DEED SRI LAKSHMI VALLABHA BUILDERS LLP.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: FORM 1 SRI LAKSHMI VALLABHA VISTA.pdf | - |
| Certificate issued by Architect Form 2File: FORM-2 ARCHITECT CERTIFICATE.pdf | - |
| Certificate issued by Engineer Form 3File: FORM-3 ENGINEER CERTIFICATE.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: NON LITIGATION AFFIDAVIT.pdf | - |
| Balance Sheet 2024 - 2025File: FINANCIALS 2025-26.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: FINANCIALS 2025-26.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: FIRM ITR DETAILS.pdf | - |
| BUILDING LICENCE | - |
| SANCTIONED PLAN | - |
| SANCTIONED PLAN | - |
| LEGAL REPORT | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| LOCATION DETAILS | - |
| COST ESTIMATION | - |
| CDP MAP | - |
| CDP DEMARKED | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SRI LAKSHMI VALLABHA VISTA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 5 registered projects within 2 km.
Century Regalia (Project 2)
Suruchi Properties Private Limited
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: SRI LAKSHMI VALLABHA BUILDERS LLP
SRI LAKSHMI VALLABHA BUILDERS LLP has 1 registration on RERA Karnataka, including SRI LAKSHMI VALLABHA VISTA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SRI LAKSHMI VALLABHA VISTA is delayed beyond 25 Aug 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SRI LAKSHMI VALLABHA VISTA?
The registered promoter entity is SRI LAKSHMI VALLABHA BUILDERS LLP, a partnership firm as per the filing. Its LLPIN ACL-8458 and GSTIN 29AFNFS3155C1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SRI LAKSHMI VALLABHA VISTA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SRI LAKSHMI VALLABHA VISTA?
The professionals named in the filing: Architect: G VINAY KUMAR; Engineer: G VINAY KUMAR; Chartered Accountant: P VENKOBI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SRI LAKSHMI VALLABHA VISTA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.