Sri Gayathri Prime

By SDR CONSTRUCTIONS

RG-KA-75246 · RERA PRM/KA/RERA/1251/309/PR/311222/005568 · Last updated on RERA Karnataka portal: 26 Dec 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 129 documents Report an error

Sri Gayathri Prime is a Residential/Group Housing project by SDR CONSTRUCTIONS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/311222/005568 on 31 Dec 2022. Possession is promised by 31 Dec 2024.

At a glance

Project

  • NameSri Gayathri Prime
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/311222/005568
  • ReraGenie IDRG-KA-75246

Builder

  • NameSDR CONSTRUCTIONS
  • Entity typePartnership Firm
  • GSTIN29ADPFS5689BIZE
  • Authorized SignatoryGopireddy Sreenivasulu
  • Other registrations3 more →

Key dates

this monthRegisteredDec 2022PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on31 Dec 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed129 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sri Gayathri Prime---48048

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 26 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 26 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
Kalappa--
K M MUDAPPA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.20 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 6.00 cr-
On-site expenditure-Salaries of workersRs 10.00 lakh-
On-site expenditure-Consultants FeesRs 10.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTata Vittala Srinivas
EngineerMandhadi Venkat Ramana Reddy
Chartered AccountantVinod Kumar Reddy

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed129

As listed on the registration, under the names the promoter filed them with; the newest 80 of 129 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/311222/005568 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
PROJECT CLARIFICATIONFile: project clarification.pdf26 Dec 2022
SINGLE LAYOUT PLAN CLARIFICATIONFile: clarification single layout plan.pdf26 Dec 2022
ESTIMATEFile: ESTIMATE_compressed.pdf26 Dec 2022
AGREEMENTFile: NEW Agreement of Sale Proforma.pdf26 Dec 2022
Agreement For SaleFile: Agreement For Sale.pdf1 Dec 2022
Architects certificateFile: Architects certificate.pdf1 Dec 2022
Balance SheetFile: Balance Sheet.pdf1 Dec 2022
Building licence Plan BBMPFile: Building licence Plan BBMP.pdf1 Dec 2022
BWSSB receiptFile: BWSSB receipt.pdf1 Dec 2022
CA Certificate Form_1File: CA Certificate Form_1.pdf1 Dec 2022
Commencement certificate_BBMPFile: Commencement certificate_BBMP.pdf1 Dec 2022
DocScanner 29Nov2022File: DocScanner 29Nov2022.pdf1 Dec 2022
engineers certificateFile: engineers certificate.pdf1 Dec 2022
EstimateFile: Estimate.xls1 Dec 2022
ITR202122File: ITR202122.pdf1 Dec 2022
PAN authenticationFile: PAN authentication.pdf1 Dec 2022
SDR CONSTRUCTIONSFile: SDR CONSTRUCTIONS.pdf1 Dec 2022
SpecificationsFile: Specifications.pdf1 Dec 2022
Upload chartered accountant certificate in prescribed format 3.Upload profit and loss account for 20File: P AND L 19.pdf6 Oct 2022
Upload chartered accountant certificate in prescribed format 3.Upload profit and loss account for 20File: P AND L 20.pdf6 Oct 2022
1)as the promoter is developing 20 guntas only that is 2023.41sqm as per clarification given by theFile: SDR-20GUNTA.pdf6 Oct 2022
2)not uploaded rtc obtained by revenue department office (uploaded online view copy )File: RTC.pdf6 Oct 2022
Upload Single plot / Development Plan. (Uploaded Building Sanction plan instead)File: STP-Plan.pdf6 Oct 2022
Please upload the STP design drawing as per the guidlines of KSPCBFile: STP-Plan.pdf6 Oct 2022
Please upload the copy of fee receipt paid towards BWSSB NOC.File: BWSSB.pdf6 Oct 2022
Uploaded proforma of Agreement for Sale(AFS) partially not in accordance with the notified AFS. TherFile: SALE AGREEMENT.pdf6 Oct 2022
The uploaded estimated cost of construction of the project does not tally with the cost details therFile: estimation cost of project.xls6 Oct 2022
ec from 26/06/2021 to upto date in form 15File: ec upto date.pdf6 Sep 2022
RTC for both syno 529/2File: RTC 259-2.pdf6 Sep 2022
RTC for both syno 529/3File: RTC 259-3.pdf6 Sep 2022
MR FOR FOR SYNO 529/2File: MR -2592-03.pdf6 Sep 2022
MR FOR FOR SYNO 529/3File: MR-2593-03.pdf6 Sep 2022
conversion order for syno 529/2File: DC Order-529-2- 04.pdf6 Sep 2022
title deed for both syno 529/2 & 529/3File: Tital deed 259-05.pdf6 Sep 2022
clarification since JDA exected only for 20guntas but project extent and khata extent is not matchinFile: jda clarification.pdf6 Sep 2022
notarized form BFile: FORM B NEW-08.pdf6 Sep 2022
Development Plan.File: Development plan & order - 01 & 02.PDF6 Sep 2022
Development Plan OrderFile: Building licence - 03.pdf6 Sep 2022
Building LicenseFile: Building licence - 03.pdf6 Sep 2022
update Total Carpet Area of all the FloorsFile: Sri Gayathri Prime Sri Gayathri Prime (2) (1).xlsx6 Sep 2022
updated cost details in the cost detailFile: estimation cost of project.xls6 Sep 2022
upload the signed copy of the project specification comprising of project name and addressFile: PRIME-NAME confirmation.pdf6 Sep 2022
proforma of Agreement for sale as notified by the GOKFile: SALE AGREEMENT 203.pdf6 Sep 2022
Provision of STP in the project is to be clarified by the promoter along with the supporting STP demFile: Development plan & order - 01 & 02.PDF6 Sep 2022
copy of fee receipt paid towards BESCOM NOCFile: Bescom receipt - 09.pdf6 Sep 2022
NOC issued by BWSSB NOCFile: BWSSB NOC - 10.pdf6 Sep 2022
section 3(1) notarized affidavitFile: AFFIDAVIT NEW-08.pdf6 Sep 2022
RTC, survey 529/3-
Mutation, survey 529/3-
Encumbrance Certificate, survey 529/3-
Conversion/Alienation Order, survey 529/3-
Sale/Title/Gift Deed, survey 529/3-
JDA, survey 529/3-
Khatha, survey 529/3-
RTC, survey 529/2-
Mutation, survey 529/2-
Encumbrance Certificate, survey 529/2-
Conversion/Alienation Order, survey 529/2-
Sale/Title/Gift Deed, survey 529/2-
JDA, survey 529/2-
Khatha, survey 529/2-
Registration CertificateFile: Firm Certificate.pdf-
Partnership DeedFile: Partnership Deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: CA Certificate Form_1.pdf-
Certificate issued by Architect Form 2File: Architects certificate.pdf-
Certificate issued by Engineer Form 3File: engineers certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation Affidavit.pdf-
Certificate from Chartered AccountFile: CA Certificate Form_1.pdf-
Balance Sheet 2020 - 2021File: BALANCE 19.pdf-
Balance Sheet 2019 - 2020File: BALANCE 20.pdf-
Balance Sheet 2018 - 2019File: BALANCE 20.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P AND L 20.pdf-
Audited Profit and Loss Statement 2019 - 2020File: P AND L 19.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Sri Gayathri Prime on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SDR CONSTRUCTIONS

SDR CONSTRUCTIONS has 4 registrations on RERA Karnataka, including Sri Gayathri Prime and HMT SRI GAYATHRI SERENITY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Sri Gayathri Prime is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sri Gayathri Prime?

The registered promoter entity is SDR CONSTRUCTIONS, a partnership firm as per the filing. Its GSTIN 29ADPFS5689BIZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sri Gayathri Prime?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Sri Gayathri Prime?

The professionals named in the filing: Architect: Tata Vittala Srinivas; Engineer: Mandhadi Venkat Ramana Reddy; Chartered Accountant: Vinod Kumar Reddy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sri Gayathri Prime?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sri Gayathri Prime. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sri Gayathri Prime to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.