Home / Browse projects / Bengaluru Urban, Karnataka / Sowparnika Pranathi
Sowparnika Pranathi
By SOWPARNIKA PROJECTS AND INFRASTRUCTURE PRIVATE LIMITED
RG-KA-99505 · RERA PRM/KA/RERA/1251/310/PR/180503/001564
Source: official RERA Karnataka filing
Red flags
- Completion date moved by 36 months
- 3 extensions taken
Clear
- No complaints on record
- Separate project account declared
Saved.
Sowparnika Pranathi is a Residential/Group Housing project by SOWPARNIKA PROJECTS AND INFRASTRUCTURE PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/180503/001564 on 3 May 2018. Possession is promised by 30 Sep 2025. The completion date has moved by 36 months from the original filing.
At a glance
Project
- NameSowparnika Pranathi
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/180503/001564
- ReraGenie IDRG-KA-99505
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on3 May 2018
- Promised completion30 Sep 2025
- Revised completionRevised to 30 Sep 2025 (originally 30 Sep 2022)
- Buildings1 building record
- Documents filed61 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 | - | - | - | 264 | 0 | 264 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | Not applicable |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterothers
No reason recorded in the filing
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed61
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/180503/001564 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CertificateFile: SPIPL - COI.jpeg | - |
| Project Details | - |
| Architect Certificate for Work Completion Schedule till DateFile: Form-Ex1 Architect Certificate.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Form-Ex5 Engineers Certificate.pdf | - |
| CA Certificate for Funds UtilizationFile: Form-Ex3 CA Certificate.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Form-Ex2 Architect Certificate.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Form-Ex6 Engineers Certifictae.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: Form-Ex4 CA Certificate.pdf | - |
| AffidavitFile: Affidavit Sec 18 Pranathi.pdf | - |
| Latest Encumbrance CertificateFile: EC-Pranathi project.pdf | - |
| Consent letter from 2/3rd of AllotteesFile: Pranathi consent Letter-comp-5.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: Form 4 -Pranathi sold and Unsold Units.pdf | - |
| Pranathi - Commencement Certificate | - |
| Pranathi Plans - 06 - Site Plan | - |
| Pranathi Plans - 06 - Site Plan | - |
| Pranathi - RERA - Draft Sale Deed | - |
| Pranathi - RERA - Draft Agreement of Sale | - |
| Pranathi - Sale Deed & RTC | - |
| Pranathi Plans - Combined | - |
| Pranathi Plans - 06 - Site Plan | - |
| Pranathi - Allotment Letter | - |
| Pranathi - Brochure | - |
| Pranathi - Specifications | - |
| Pranathi - EC | - |
| Pranathi - E - Katha | - |
| Pranathi - Sale Deed & RTC | - |
| Pranathi - Conversion Certificate | - |
| Pranathai - NOC - Fire - Compressed | - |
| Pranathai - NOC - AAI | - |
| Pranathai - NOC - BESCOM | - |
| Pranathai - NOC - KSPCB | - |
| Pranathai - NOC - MOEF - I | - |
| Pranathai - NOC - BSNL | - |
| Pranathi Plans - Combined | - |
| Pranathi Plans - 06 - Site Plan | - |
| Pranathi Plans - Combined | - |
| Pranathi - Conversion Certificate | - |
| Balance Sheet 2016 - 2017File: Balance Sheet - 16-17.pdf | - |
| Balance Sheet 2015 - 2016File: Balance Sheet - 15-16.pdf | - |
| Balance Sheet 2014 - 2015File: Balance Sheet - 14-15.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: P & L Account - 16-17.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: P & L Account - 15-16.pdf | - |
| Audited Profit and Loss Statement 2014 - 2015File: Profit and Loss Account 14-15.pdf | - |
| Director's Report 2016 - 2017File: Directors Report - 16-17.pdf | - |
| Director's Report 2015 - 2016File: Directors Report - 15-16.pdf | - |
| Director's Report 2014 - 2015File: Directors Report 14-15.pdf | - |
| Cash Flow Statement 2016 - 2017File: Cash Flow Statement - 16-17.pdf | - |
| Cash Flow Statement 2015 - 2016File: Cash Flow Statement - 15-16.pdf | - |
| Auditor's Report 2016 - 2017File: Audit Report - 16-17.pdf | - |
| Auditor's Report 2015 - 2016File: Audit Report - 15-16.pdf | - |
| Auditor's Report 2014 - 2015File: Auditors Report 14-15.pdf | - |
| Income Tax Return Acknowledgement 2016 - 2017File: ITR - V - 16-17.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: ITR - V - 15-16.pdf | - |
| Income Tax Return Acknowledgement 2014 - 2015File: ITR V - 14-15.pdf | - |
| Pranathi - RERA Declaration | - |
| Prospectus/BrochureFile: Pranathi-Bi-Fold-Final-lowres.pdf | - |
| Tower Excel SheetFile: Pranathi.xlsx | - |
| Occupancy CertificateFile: Pranathi - Occupancy Certificate.pdf | - |
| Completion certificate issued by the competent authorityFile: KSPCB-Pranathi.pdf | - |
| Registered Agreement of SaleFile: Pranathi Sale Aggreement.pdf | - |
| Registered conveyance deed for an individual unitFile: 823-AMULYA Sale deed.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Sowparnika Pranathi on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 17 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: SOWPARNIKA PROJECTS AND INFRASTRUCTURE PRIVATE LIMITED
SOWPARNIKA PROJECTS AND INFRASTRUCTURE PRIVATE LIMITED has 10 registrations on RERA Karnataka, including SOWPARNIKA INDRAPRASTHA and Sowparnika Ashiyana Phase I. Its filings declare 8 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Sowparnika Pranathi is delayed beyond 30 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Sowparnika Pranathi?
The registered promoter entity is SOWPARNIKA PROJECTS AND INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Its CIN U45201KA2007PTC043166 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Sowparnika Pranathi?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
What should I check before booking in Sowparnika Pranathi?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.