Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 62 documents Report an error

SOUNDARYA KAMAKSHI is a Residential/Group Housing project by SOUNDARYA CONSTRUCTIONS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/180222/002210 on 22 Feb 2018. Possession is promised by 31 Mar 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameSOUNDARYA KAMAKSHI
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/180222/002210
  • ReraGenie IDRG-KA-48147

Builder

  • NameSOUNDARYA CONSTRUCTIONS
  • Entity typePartnership Firm
  • Authorized SignatoryS.P.HOMBANNA
  • OthersV.S.SURESH, R.JAGADEESH

Key dates

this monthRegisteredFeb 2018First promiseMar 2019Revised toMar 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on22 Feb 2018
  • Promised completion31 Mar 2020
  • Revised completionRevised to 31 Mar 2020 (originally 31 Mar 2019)
  • Buildings3 building records
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A---25025
WING B---36036
WING C---50050

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 2 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 2 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,678 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 23.26 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/446/PR/220711/002210Mar 2019 → Mar 2020

Reason as filed by the promoterFinancial crunch; Shortage of Labour

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed62

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/180222/002210 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
BANK ACCOUNT CHANGE REQUESTFile: QUERY - REPLY.pdf2 Feb 2022
CLARIFICATION FOR PREVIOUS AND NEW END DATEFile: QUERY - REPLY.pdf2 Feb 2022
CLARIFICATION LETTERFile: 1 CLARIFICTION LETTER.pdf1 Mar 2021
LOAN CLOSURE LETTERFile: 2 Tata Capital - CLOSURE LETTER.pdf1 Mar 2021
ESCROW ACCOUNT BANK STATEMENTFile: ICICI BANK Escrow acc.pdf1 Mar 2021
SEC 18 AFFIDAVITFile: Affidavit-Soundarya Kamakshi.pdf1 Mar 2021
CURRENT ACCOUNT BANK STATEMENTFile: CURRENT ACCOUNT BANK STATEMENT.pdf1 Mar 2021
CertificateFile: 1_Firm Registration Certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: ARC Work Completion.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: ENG Work Completion.pdf-
CA Certificate for Funds UtilizationFile: CA Fund Utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: ARC WOrk Pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: ENG Work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Fund Required.pdf-
AffidavitFile: SECTION18 AFFIDAVIT.pdf-
Latest Encumbrance CertificateFile: FORM-B_ NEW.pdf-
Details Of Sold/ Un-sold UnitsFile: Kamakshi - SoldUnsoldDetails.xlsx-
Document 1File: Soundarya Kamakshi EC.pdf-
Document 2File: Bank statement.pdf-
Document 3File: Commencement Certificate.pdf-
Document 4File: Elevation Section Site Plan.pdf-
6_Commencement Certificate-
Floor Plan-
Elevation Section Site Plan-
17_Proforma for Sale Deed-
9_Proforma for Sale Agreement Kamakshi-
RTC-
Elevation Section Site Plan-
Floor Plan-
13_ALLOTEMENT LETTER - SOUNDARYA-
14_Kamakshi Brochure-
16_Project Specifications-
EC-
Katha-
19_JDA-
18_Title Deed with Area Sketch-
10_Conversion Certificate-
15_NOC BWSSB-
Floor Plan-
Project Specifications-
19_Supplemental Agreement-
Balance Sheet 2016 - 2017File: Soundarya ITR Acts 2015-16.pdf-
Balance Sheet 2015 - 2016File: Soundarya ITR Acts 2014-15.pdf-
Balance Sheet 2014 - 2015File: Soundarya ITR Acts 2013-14.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Soundarya ITR Acts 2015-16.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Soundarya ITR Acts 2014-15.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Soundarya ITR Acts 2013-14.pdf-
Director's Report 2016 - 2017File: Soundarya ITR Acts 2015-16.pdf-
Director's Report 2015 - 2016File: Soundarya ITR Acts 2014-15.pdf-
Director's Report 2014 - 2015File: Soundarya ITR Acts 2013-14.pdf-
Cash Flow Statement 2016 - 2017File: Soundarya ITR Acts 2015-16.pdf-
Cash Flow Statement 2015 - 2016File: Soundarya ITR Acts 2014-15.pdf-
Auditor's Report 2016 - 2017File: Soundarya ITR Acts 2015-16.pdf-
Auditor's Report 2015 - 2016File: Soundarya ITR Acts 2014-15.pdf-
Auditor's Report 2014 - 2015File: Soundarya ITR Acts 2013-14.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Soundarya ITR Acts 2015-16.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Soundarya ITR Acts 2014-15.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Soundarya ITR Acts 2013-14.pdf-
Form B-
Prospectus/BrochureFile: Will upload later.pdf-
Advertisement Copy 1File: Will upload later.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_180222_002210_WING A.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SOUNDARYA KAMAKSHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SOUNDARYA CONSTRUCTIONS

SOUNDARYA CONSTRUCTIONS has 1 registration on RERA Karnataka, including SOUNDARYA KAMAKSHI. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SOUNDARYA KAMAKSHI is delayed beyond 31 Mar 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SOUNDARYA KAMAKSHI?

The registered promoter entity is SOUNDARYA CONSTRUCTIONS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SOUNDARYA KAMAKSHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in SOUNDARYA KAMAKSHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOUNDARYA KAMAKSHI. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOUNDARYA KAMAKSHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.