ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Solus 2 Phase I

Registration approved Commercial project

Solus 2 Phase I

By Mythri Housing Private Limited

RG-KA-89906 · RERA PRM/KA/RERA/1251/310/PR/171015/000729

Source: official RERA Karnataka filing

Red flags

  • 9 complaints at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Aug 2020Possession promisedmoved 12 months from the original
9Complaints at RERA Karnatakaon this registration
Jump to the 76 documents Report an error

Solus 2 Phase I is a Commercial project by Mythri Housing Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171015/000729 on 15 Oct 2017. Possession is promised by 31 Aug 2020. The completion date has moved by 12 months from the original filing. 9 complaints are on record with the regulator.

At a glance

Project

  • NameSolus 2 Phase I
  • TypeCommercial
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/171015/000729
  • ReraGenie IDRG-KA-89906

Builder

  • NameMythri Housing Private Limited
  • Entity typeCompany
  • CINU45200KA2011PTC057691
  • Authorized SignatoryGururaj K
  • OthersPrakash H.N
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2017First promiseAug 2019Revised toAug 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Oct 2017
  • Promised completion31 Aug 2020
  • Revised completionRevised to 31 Aug 2020 (originally 31 Aug 2019)
  • Buildings1 building record
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Not Applicable---05858

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,906 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 29.54 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKhan Global Engineering consultants Pvt Ltd for facade
EngineerShradha Designtech Pvt Ltd

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/220620/000729Aug 2019 → Aug 2020

Reason as filed by the promoterFinancial crunch

Complaints filed with RERA Karnataka9

Case no.ComplainantRespondentFiled
CMP/211218/0008733-Mythri Housing Private Limited18/12/2021
CMP/220919/0010023-Mythri Housing Private Limited19/09/2022
00207/2023-Mythri Housing Private Limited15/02/2023
00208/2023-Mythri Housing Private Limited15/02/2023
00209/2023-Mythri Housing Private Limited15/02/2023
00361/2023-Mythri Housing Private Limited23/03/2023
00770/2023-Mythri Housing Private Limited18/05/2023
01496/2023-Mythri Housing Private Limited27/09/2023
01231/2025-Mythri Housing Private Limited29/09/2025

Documents filed76

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171015/000729 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registration Certificate- MHPL.pdf-
Architect Certificate for Work Completion Schedule till DateFile: As on Date Work (AC).pdf-
Engineer Certificate for Work Completion Schedule till DateFile: As on Date Work (EC).pdf-
CA Certificate for Funds UtilizationFile: CA Certificate.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Pending work (A).pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Pending Work (EC).pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate.pdf-
AffidavitFile: Form B.pdf-
Latest Encumbrance CertificateFile: Latest EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (2).xlsx-
Document 1File: Affidavit - S2.pdf-
Document 2File: 2-3rd Consent Letter - S2.pdf-
Document 3File: Bank Statement - S2 -- 1.pdf-
Document 4File: Bank Statement - S2 -- 2.pdf-
Document 5File: Commencement certificate - S2.pdf-
Document 6File: Doc.pdf-
Solus 2 - Commencement Certificate Ack-
Solus 2 - Approved building Plan-
Solus2 - Approved Layout Plan -
Solus 2 - Proform of Sale Deed-
Solus2-Agreement of Sale-
Solus2 - Existing Layout Plan-
Sectional drawing solus2-
Sale deed and RTC-
Solus 2 - Approved Section of buildinge Plan-
Solus2 - Area Development Plan of the Project area -
Solus 2 -Proforma of Allotment Letter-
Solus 2 -Brochure-
Solus2- All NOC's from all the auhorities-
Solus 2 - Project Specifications-
EC-
Khatha Certificate Khatha Extract and Tax Paid Receipt-
Joint Development Agreement and General Power of Attorney-
Other documents-
Conversion Order-
Section 14 of KTCP Act-
Utilization Certificate-
TDR Certificate-
Relinquishment Deed-
Doc No 5 Revised Fire NOC-
Doc No 1 Airport NOC-
Doc No 3 BESCOM NOC-
Doc No 6 BWSSB NOC Revised-
Doc No 7 KSPCB NOC-
SEIAA NOC-
Doc No 2 BSNL NOC-
NOC from abutting lands-
Unnamed document-
Urban Land Ceiling-
BMRCL-
Urban Arts Commission-
Inspector of factories-
District Magistrate-
Coastal regulation-
Structural Stability Certificate-
Sectional drawing solus2-
Balance Sheet 2015 - 2016File: Mythri Balance Sheet 15-16.pdf-
Balance Sheet 2014 - 2015File: Mythri Balance Sheet 14-15.pdf-
Balance Sheet 2013 - 2014File: Mythri Balance Sheet 13-14.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Mythri Profit & Loss 15-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Mythri Profit & Loss 14-15.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Mythri Profit & Loss 13-14.pdf-
Director's Report 2015 - 2016File: Mythri Director Report 15-16.pdf-
Director's Report 2014 - 2015File: Mythri Director Report 14-15.pdf-
Director's Report 2013 - 2014File: Mythri Director Report 13-14.pdf-
Cash Flow Statement 2015 - 2016File: Mythri Cash Flow 15-16.pdf-
Cash Flow Statement 2014 - 2015File: Mythri Cash Flow 14-15.pdf-
Auditor's Report 2015 - 2016File: Mythri Auditor Report 15-16.pdf-
Auditor's Report 2014 - 2015File: Mythri Auditor Report 14-15.pdf-
Auditor's Report 2013 - 2014File: Mythri Auditor Report 13-14.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR Mythri 15-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR Mythri 14-15.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: ITR Mythri 13-14.pdf-
Solus 2 - Declaration in Form 'B'-
Prospectus/BrochureFile: Solus2 Brochure_Version_compressed.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_171015_000729.xlsx-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Jain Heights Grand West phase I-OngoingJun 2020Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Solus 2 Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Mythri Housing Private Limited

Mythri Housing Private Limited has 1 registration on RERA Karnataka, including Solus 2 Phase I. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Solus 2 Phase I is delayed beyond 31 Aug 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Solus 2 Phase I?

The registered promoter entity is Mythri Housing Private Limited, a company as per the filing. Its CIN U45200KA2011PTC057691 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Solus 2 Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Solus 2 Phase I?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Solus 2 Phase I?

The professionals named in the filing: Architect: Khan Global Engineering consultants Pvt Ltd for facade; Engineer: Shradha Designtech Pvt Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Solus 2 Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Solus 2 Phase I. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Solus 2 Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.