Home / Browse projects / Bengaluru Urban, Karnataka / SOLACE - A SINDHURI INFRA PROJECT

Registration approved No litigation declared Residential/Group Housing project

SOLACE - A SINDHURI INFRA PROJECT

By SINDHURI INFRA PROJECTS

RG-KA-17655 · RERA PRM/KA/RERA/1251/446/PR/210625/007863 · Last updated on RERA Karnataka portal: 18 Jun 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2027Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 91 documents Report an error

SOLACE - A SINDHURI INFRA PROJECT is a Residential/Group Housing project by SINDHURI INFRA PROJECTS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/210625/007863 on 21 Jun 2025. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameSOLACE - A SINDHURI INFRA PROJECT
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/210625/007863
  • ReraGenie IDRG-KA-17655

Builder

  • NameSINDHURI INFRA PROJECTS
  • Entity typePartnership Firm
  • GSTIN29ACSFS5327E2ZN
  • Authorized SignatoryM.Anil Kumar Reddy
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on21 Jun 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Solace---12012

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 18 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 18 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership4

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners4
LandownerVillageDistrict
Deepu Cherickal Thomas Korah--
Prisu Thomas--
Rohan Cherickal Thomas--
Kirthana Thomas--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 8.20 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 5.25 cr-
On-site expenditure-Site OverheadRs 1.45 cr-
On-site expenditure-Salaries of workersRs 95.00 lakh-
On-site expenditure-Consultants FeesRs 35.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 20.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArun Kumar Deivanayagam
EngineerChethan Megharaj Sidgiddi
Chartered AccountantNirmala Sreenivasulu

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed91

As listed on the registration, under the names the promoter filed them with; the newest 80 of 91 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/210625/007863 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Enquiry ReplyFile: Notice Reply.pdf18 Jun 2025
Layout PlanFile: Officers Colony.jpg18 Jun 2025
Complete Flow of the PropertyFile: Complete Flow of Property.pdf18 Jun 2025
Registration CertificateFile: SindhuriReconstituion2025 compressed.pdf-
GST CertificateFile: sindhuri gst certificate.pdf-
Partnership DeedFile: SindhuriReconstituion2025 compressed.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 altered.pdf-
Certificate issued by Architect Form 2File: Form 2 .pdf-
Certificate issued by Engineer Form 3File: Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: No litigation sindhuri infra.pdf-
Balance Sheet 2023 - 2024File: Balance sheet 24.pdf-
Balance Sheet 2022 - 2023File: Balance sheet With UDIN.pdf-
Balance Sheet 2021 - 2022File: balance sheet (1).pdf-
Audited Profit and Loss Statement 2023 - 2024File: Profit and loss 24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Profit and loss account With UDIN.pdf-
Audited Profit and Loss Statement 2021 - 2022File: profit & loss.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR 2024-25 Acknowledgement.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR 2023-24 Sindhuri.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 2022-23 Sidhuri.pdf-
Building license 130-
Apporved plan 130-
Apporved plan 130-
Structural Stability Certificate-
Solace Specification Signed _compressed-
Sindhuri SOLACE Sale Agreement-
MEG allotment letter signed_compressed-
form B sindhuri solace affidavit-
3 (1) affidavit sindhuri-
joint affidavit sindhuri infra-
Tile Certificate-
MEG Bescom NOC_compressed-
BWSSB COMPLETE_compressed-
KSPCB NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
MEG Subregistar Value_compressed-
Land Cost Calculation Self Attested-
CDP Solace-
Sindhuri Second Reconstitution-
SindhuriReconstituion2025 compressed-
Sindhuri First Partnership Deed-
Sindhuri Firm Registration-
Firm Final Constitution Certificate-
STP mandatory notification by GoK-
STP Confirmation-
Sindhuri Solace-A Amenities-
Area Statement Flat-
Sindhuri SIlas_RERA_Detailed_CostEstimate-
Copy of Sindhuri Board resolution for Rera-
Sale Deed 1599-
Sale deed2629-
Release Deed from Siblings-
Gift Deed within family-
Deepu Affidavit -
Deepu Family tree-
OLD EC and affidavits-
JD_compressed-
GPA Construction-
GPA Sale-
Sharing Agreement-
Ec from 2004 to 2023-
ECC-22052025-1695984-
Source of Fund Signed-
Structural Stability Certificate-
Registration of Reconstitution-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Jose EsperancaMunicipal No 5, North Road, Bangalore Civil Station, BBMP Ward No 59,BangaloreCompleted-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SOLACE - A SINDHURI INFRA PROJECT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SINDHURI INFRA PROJECTS

SINDHURI INFRA PROJECTS has 1 registration on RERA Karnataka, including SOLACE - A SINDHURI INFRA PROJECT. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SOLACE - A SINDHURI INFRA PROJECT is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SOLACE - A SINDHURI INFRA PROJECT?

The registered promoter entity is SINDHURI INFRA PROJECTS, a partnership firm as per the filing. Its GSTIN 29ACSFS5327E2ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SOLACE - A SINDHURI INFRA PROJECT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SOLACE - A SINDHURI INFRA PROJECT?

The professionals named in the filing: Architect: Arun Kumar Deivanayagam; Engineer: Chethan Megharaj Sidgiddi; Chartered Accountant: Nirmala Sreenivasulu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOLACE - A SINDHURI INFRA PROJECT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOLACE - A SINDHURI INFRA PROJECT. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOLACE - A SINDHURI INFRA PROJECT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.