Sohum Heights

By M/S SOHUM ENTERPRISES

RG-MH-05814 · RERA P51700051918 · Last updated on MahaRERA portal: 8 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Staircases, 85%
20 of 45Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 131 documents Report an error

Sohum Heights is a Others project by M/S SOHUM ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700051918 on 13 Jul 2023. Possession is promised by 31 Dec 2026. 25 of the 45 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSohum Heights
  • TypeOthers
  • Location
    • DAWDI
    • Dawadi
    • Kalyan
    • Thane
    • 421203
  • Pincode421203
  • RERA no.P51700051918
  • ReraGenie IDRG-MH-05814

Builder

  • NameM/S SOHUM ENTERPRISES
  • Entity typePartnership
  • PartnerSUCHITRA SANTOSH PARDESHI

Key dates

this monthRegisteredJul 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jul 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed131 files

Current status

56%25 of 45 units booked
82.8%Work done, per cost certificate

Figures as on 8 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sohum HeightsNA8842345

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 85%.

Sohum Heights: 60% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor40%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered1
Open Space28

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area696 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
Declared on8 Dec 2025
LandownerVillageDistrict
TULSHIRAM JANU KHANEDawadiThane
SANTOSH MARUTI KHANEDahivaliThane
ASHOK MARUTI KHANEDawadiThane
CHINTAMANI JANU KHANEDawadiThane

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2342.92
Proposed, not sanctioned2,343 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDOMBIVLI EAST
Estimated costRs 5.10 cr
Cost incurredRs 4.22 cr
Work done82.83%
BuildingWingEstimatedIncurred
Sohum HeightsNARs 5.09 crRs 4.22 cr
-NARs 1Rs 1

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSTHAPATYA NIRMAN
EngineerMANOHAR PATI & ASSOCIATES
Chartered AccountantASPG & CO
Chartered AccountantSAGAR JOSHI
PartnerRole in project
M/S SOHUM ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed131

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 30092023.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 31122023.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 31032024.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 30062024.pdf8 Dec 2025
Form 1File: FORM 1 31-12-2024.pdf8 Dec 2025
Form 2File: FORM 2 31122024 SOHUM.pdf8 Dec 2025
Form 3File: FORM 3 OCT-DEC 2024.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30092024.pdf8 Dec 2025
Form 1File: FORM 1 SOHUM MAR 2025.pdf8 Dec 2025
Form 2File: FORM 2 MARCH 2025.pdf8 Dec 2025
Form 3File: FORM 3 JAN- MAR 2025 (1).pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR 25.pdf8 Dec 2025
Withdrawal Update Form 1File: FORM 1 JUNE 2025.pdf8 Dec 2025
Withdrawal Update Form 2File: FORM 2 MARCH 2025.pdf8 Dec 2025
Withdrawal Update Form 3File: Sohum Enterprise Form 3 Q1 FY 2025-26 NEW FORMAT.pdf8 Dec 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 31-12-2023.pdf1 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 31-03-2024.pdf1 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 30-06-2024.pdf1 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 30-09-2024.pdf1 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 31-12-2024.pdf1 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 31-03-2025.pdf1 Jul 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SEPT 25.pdf28 Jun 2025
Other - LegalFile: CONSENT LETTER.pdf18 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: FORM 5 MARCH 2025.pdf18 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 OCT-DEC 2024.pdf17 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JAN- MAR 2025 (1).pdf17 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 2025.pdf17 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JUN 23.pdf17 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SEPT 23.pdf17 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DEC23.pdf17 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD MAR 24.pdf17 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JUN 24.pdf17 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SEPT 25.pdf17 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DEC 24.pdf17 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SEPT 23.pdf17 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31-12-2024.pdf14 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SOHUM MAR 2025.pdf14 Jun 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK AC DECLARATION FORMAT A.pdf14 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SOHUM.pdf12 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A SOHUM 30092024.pdf13 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A SOHUM 31122024.pdf13 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A SOHUM 31032025.pdf13 Apr 2025
Building plan approvalFile: PLAN SOHUM REVISED (1).pdf25 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC of Sohum Heights.pdf25 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN SOHUM REVISED (1).pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Dec 23.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- March 24.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- June 24.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sep 23.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sep 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep 23.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 23.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mar 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Sep 24.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Dec 23.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sep 23.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Mar 24.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Jun 24.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sep 24.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- March 24.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- June 24.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sep 23.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sep 24.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Dec 23.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Jun 24.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sep 24.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Mar 24.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Sep 23.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Dec 23.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep 23.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec 23.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mar 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Sep 24.pdf8 Oct 2024
Form 1File: Form 1- Sep 23.pdf3 Oct 2024
Form 2File: Form 02 - Sep 23.pdf3 Oct 2024
Form 3File: CA Certificate_Sep-23.pdf3 Oct 2024
Form 1File: Form 1- Dec 23.pdf3 Oct 2024
Form 2File: Form 02 - Dec 23.pdf3 Oct 2024

How this compares with Thane

56%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sohum Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAWDI7,600+ in Thane

Builder: M/S SOHUM ENTERPRISES

M/S SOHUM ENTERPRISES has 1 registration on MahaRERA, including Sohum Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sohum Heights is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sohum Heights?

The registered promoter entity is M/S SOHUM ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sohum Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sohum Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sohum Heights?

The professionals named in the filing: Architect: STHAPATYA NIRMAN; Engineer: MANOHAR PATI & ASSOCIATES; Chartered Accountant: ASPG & CO; Chartered Accountant: SAGAR JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sohum Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sohum Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sohum Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.