ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Sobha Silicon Oasis Phase 5 Wing 10 & 11

Registration approved Residential/Group Housing project

Sobha Silicon Oasis Phase 5 Wing 10 & 11

By Sobha Limited

RG-KA-55042 · RERA PRM/KA/RERA/1251/310/PR/170913/000121

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Oct 2021Possession promisedmoved 9 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 66 documents Report an error

Sobha Silicon Oasis Phase 5 Wing 10 & 11 is a Residential/Group Housing project by Sobha Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/170913/000121 on 13 Sep 2017. Possession is promised by 1 Oct 2021. The completion date has moved by 9 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSobha Silicon Oasis Phase 5 Wing 10 & 11
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/170913/000121
  • ReraGenie IDRG-KA-55042

Builder

  • NameSobha Limited
  • Entity typeCompany
  • CINL45201KA1995PLC018475
  • Authorized SignatoryLt. Gen Mathew Mammen (Retd), PVSM, AVSM,VSM (Bar)
  • Other registrations119 more →
  • No longer live8 withdrawn or revoked
  • Declared earlier projects196 →

Key dates

this monthRegisteredSep 2017First promiseJan 2021Revised toOct 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on13 Sep 2017
  • Promised completion1 Oct 2021
  • Revised completionRevised to 1 Oct 2021 (originally 1 Jan 2021)
  • Buildings2 building records
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 10---86086
Wing 11---86086

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,670 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 152.22 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGeetha K Nair
EngineerAnilkumar S Hokrani

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJan 2021 → Oct 2021

No reason recorded in the filing

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
CMP/190610/0002334-Sobha Limited10/06/2019

Documents filed66

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/170913/000121 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Sobha reg certificate.jpg-
BBMP Sanctioned Approval Letter-
BBMP Plan Sanction Drawings - Silicon Oasis-
Approved Layout Plan - Non Applicability-
Silicon Oasis Master sale deed RERA Wing 10,11-
Silicon Oasis Master sale deed RERA Wing 10,11-
Land Documents & Location - Silicon Oasis compressed-
Approved Section of Building, Infra Plan of Plotting - Silicon Oasis-
Area Development Plan of Project Area - SO P5-
Allotment letter-
Brochure-
NOC's - Silicon Oasis (Compressed)-
Specifications - Silicon Oasis-
Encumbrance Certificate - Silicon Oasis-
Silicon Khatha-
Sale Deed-
Conversion Certificate-
CLU Silicon-
Relinquishment Deed - Silicon-
Fire NOC-
HAL NOC-
BESCOM-
BWSSB-
KSPCB NOC-
SEIAA-
Telecom NOC-
Unnamed document-
Not Appl - Inspector of Factories-
SO-Phase 5 W10-11-
Section elevation W10-11-
Balance Sheet 2015 - 2016File: Balance Sheet - Mar 2017.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet - Mar 2016.pdf-
Balance Sheet 2013 - 2014File: Balance Sheet - Mar 2015.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit Loss Statement - Mar 2017.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit Loss Statement - Mar 2016.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Profit Loss Statement - Mar 2015.pdf-
Director's Report 2015 - 2016File: DR_2016-17.pdf-
Director's Report 2014 - 2015File: DR_2015-16.pdf-
Director's Report 2013 - 2014File: DR_2014-15.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow - Mar 2017.pdf-
Cash Flow Statement 2014 - 2015File: Cash Flow - Mar 2016.pdf-
Auditor's Report 2015 - 2016File: Auditors Report - Mar 2017.pdf-
Auditor's Report 2014 - 2015File: Auditors Report - Mar 2016.pdf-
Auditor's Report 2013 - 2014File: Auditors Report - Mar 2015.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 2016-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR 2015-16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: ITR 2014-15.pdf-
Form B - Wing 10 & 11-
Prospectus/BrochureFile: Brochure.pdf-
Advertisement Copy 1File: NA - Advertisements.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_170913_000121.xlsx-
Loan raised documentFile: NOC Silicon Oasis.pdf-
Stability CertificateFile: SSC SO W 7 to 12 Included CH.pdf-
Road cutting permission letter issued by the planning Authority for laying Water supply line, sanitary line, UFile: Road Cutting NOC.pdf-
NOC issued by the Fire Force department after completion of workFile: Fire Clearance Certificate - Silion Oasis.pdf-
Occupancy CertificateFile: SO OC wings 7 to 12.pdf-
Consent for operation issued by KSPCBFile: Silicon oasis_CFO_Wing 7 to 11 and Club House.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Lift Licence - Silicon Oasis C.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: Permanent Power Sanction BESCOM - Silicon Oasis.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB NOC.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: Sobha Silicon Oasis Phase 5 Wing 10 & 11.pdf-
Common Area and other amenities facilities are completed or not and details of handling over of the same to asFile: Silicon oasis DOD compressed.pdf-
Details of undivided share of land handed over to the association of allotteesFile: Silicon Oasis UDS.pdf-
Architect certificate for having completed the work(in format no 5)File: Sobha Silicon Oasis Phase 5 Wing 10 & 11.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Silicon Oasis Phase 5 CA.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit Silicon Oasis Phase 5 Wing 10 & 11.pdf-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

44 not delivered by the promised date12 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Sobha Winchester-OngoingJul 2017Not delivered
Sobha West Hill - Part C-OngoingJul 2017Not delivered
Sobha Valley View - Heritage-OngoingJul 2017Not delivered
Sobha Silicon Oasis Wings 10 and 11-OngoingJul 2017Not delivered
Sobha Silicon Oasis Wings 1, 2, 3, 4, 5, 6-OngoingJul 2017Not delivered
Sobha Silicon Oasis Wing 8-OngoingJul 2017Not delivered
Sobha Silicon Oasis Wing 7-OngoingJul 2017Not delivered
Sobha Silicon Oasis Wing 7-OngoingJul 2017Not delivered
Sobha Silicon Oasis WIng 9-OngoingJul 2017Not delivered
Sobha Serene-CompletedJul 2017No date filed
Sobha Rio Vista-OngoingJul 2017Not delivered
Sobha Palm Court-OngoingJul 2017Not delivered
Sobha Palladian-CompletedJul 2017No date filed
Sobha Orion-OngoingJul 2017Not delivered
Sobha Morzaria Grandeur - 2-OngoingJul 2017Not delivered
Sobha Morzaria Grandeur-CompletedJul 2017No date filed
Sobha Landscape-CompletedJul 2017No date filed
Sobha Jade-OngoingJul 2017Not delivered
Sobha Indraprastha - Residential-OngoingJul 2017Not delivered
Sobha Forest View - Ebony-CompletedJul 2017No date filed
Sobha Forest View - Alder-CompletedJul 2017No date filed
Sobha Estate-CompletedJul 2017No date filed
Sobha Elan-OngoingJul 2017Not delivered
Sobha Dream Acres-Tropical Greens Wing 46-OngoingJul 2017Not delivered
Sobha Dream Acres-Tropical Greens Wing 45-OngoingJul 2017Not delivered
Sobha Dream Acres-Tropical Greens Wing 43, 44-OngoingJul 2017Not delivered
Sobha Dream Acres-Tropical Greens Wing 42-OngoingJul 2017Not delivered
Sobha Dream Acres-Tropical Greens Wing 41-OngoingJul 2017Not delivered
Sobha Dream Acres-Rain Forest-Wing 9,10,14-CompletedJul 2017No date filed
Sobha Dream Acres-Rain Forest-Wing 7,8 & 13-CompletedJul 2017No date filed
Sobha Dream Acres-Rain Forest-Wing 5 and 6-OngoingJul 2017Not delivered
Sobha Dream Acres-Rain Forest-Wing 3 and 4-OngoingJul 2017Not delivered
Sobha Dream Acres-Rain Forest-Wing 17-OngoingJul 2017Not delivered
Sobha Dream Acres-Rain Forest-Wing 16-OngoingJul 2017Not delivered
Sobha Dream Acres-Rain Forest-Wing 12-OngoingJul 2017Not delivered
Sobha Dream Acres-Rain Forest-Wing 11-OngoingJul 2017Not delivered
Sobha Dream Acres-Rain Forest-Wing 1,2-OngoingJul 2017Not delivered
Sobha Dream Acres-Palm Springs Wing 53-OngoingJul 2017Not delivered
Sobha Dream Acres-Palm Springs Wing 52-OngoingJul 2017Not delivered
Sobha Dream Acres-Palm Springs Wing 48 and 49-OngoingJul 2017Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Sobha Silicon Oasis Phase 5 Wing 10 & 11 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSobha Silicon Oasis PhasOther 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 17 registered projects within 2 km.

Builder: Sobha Limited

SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Sobha Silicon Oasis Phase 5 Wing 10 & 11 is delayed beyond 1 Oct 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sobha Silicon Oasis Phase 5 Wing 10 & 11?

The registered promoter entity is Sobha Limited, a company as per the filing. Its CIN L45201KA1995PLC018475 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sobha Silicon Oasis Phase 5 Wing 10 & 11?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sobha Silicon Oasis Phase 5 Wing 10 & 11?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Sobha Silicon Oasis Phase 5 Wing 10 & 11?

The professionals named in the filing: Architect: Geetha K Nair; Engineer: Anilkumar S Hokrani. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sobha Silicon Oasis Phase 5 Wing 10 & 11?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sobha Silicon Oasis Phase 5 Wing 10 & 11. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sobha Silicon Oasis Phase 5 Wing 10 & 11 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.