Home / Browse projects / Bengaluru Urban, Karnataka / Sobha Insignia
Sobha Insignia
RG-KA-81406 · RERA PRM/KA/RERA/1251/446/PR/030922/005212 · Last updated on RERA Karnataka portal: 10 Apr 2026
Source: official RERA Karnataka filing
Red flags
- Litigation declared, 1 case
- 1 complaint at RERA Karnataka
Clear
- Completion date never moved
- Separate project account declared
Saved.
Sobha Insignia is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/030922/005212 on 3 Sep 2022. Possession is promised by 31 Mar 2026. 14 of the 33 units on this registration are recorded sold or booked, and 16 of 17 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSobha Insignia
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560037
- Pincode560037
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/030922/005212
- ReraGenie IDRG-KA-81406
Builder
- NameSOBHA LIMITED
- Entity typeCompany
- CINL45201KA1995PLC018475
- GSTIN29AABCS7723E1ZB
- Authorized SignatoryMr. Suresh Ganiga
- Managing DirectorMr Jagadish Nangineni
- DirectorsRavi P N C Menon, Mr Jagadish Nangineni
- Project HeadMr JAYAKUMAR G
- Other registrations119 more →
- No longer live8 withdrawn or revoked
- Declared earlier projects196 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on3 Sep 2022
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings1 building record
- Documents filed105 files
Current status
Figures as on 10 Apr 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing 1 | - | - | - | 33 | 0 | 33 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 10 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 17 construction stages are filed complete. The stage furthest along is Internal and External work including landscapes as per..., at 57%.
Building: 97% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | 57% |
Progress on shared amenities40
As on 10 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Solid waste management and disposal | Yes | 40% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 90% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 95% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 0% |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 60% |
| Terrace | Yes | 98% |
| Outer Wall | Yes | 100% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s. Sobha Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 47.10 cr | Rs 48.61 cr |
| Payment of taxes | Rs 5.97 cr | Rs 5.97 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 5.00 cr | Rs 5.00 cr |
| On-site expenditure-Site Overhead | Rs 3.30 cr | Rs 3.30 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Geetha K Nair |
| Engineer | Arjun M V |
| Chartered Accountant | Balaji D |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 352/2017/2017 | O S No 352/2017 filed by Smt Bharathi & Others against Sri Ramaiah & Others before the City Civil Court Bengaluru for partition of suit schedule properties and other reliefs | - |
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 01192/2023 | - | SOBHA LIMITED | 26/07/2023 |
Documents filed105
As listed on the registration, under the names the promoter filed them with; the newest 80 of 105 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/030922/005212 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Insignia.pdf | 10 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Insignia.pdf | 10 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Insignia.pdf | 10 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 10 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 10 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 10 Apr 2026 |
| Q4 2025-26 Fire and Safety | 10 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Insignia C.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Insignia.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Insignia.pdf | 12 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 12 Jan 2026 |
| Affidavit for pendency of BWSSB NOC and BWSSB application acknowledgementFile: Affidavit for pendency of BWSSB NOC and application ack.pdf | 30 Aug 2022 |
| Furnished Khata Certificate obtained in the name of Sobha LimitedFile: MR.pdf | 18 Aug 2022 |
| No litigation with land owners signatureFile: 2 Affidavit for No Litigation format for Insignia.pdf | 18 Aug 2022 |
| Legal OpinionFile: Legal Opinion Bhoganahalli.pdf | 18 Aug 2022 |
| Single plot layoutFile: Single plot layout remarks and Approved drawings.pdf | 18 Aug 2022 |
| Single plot layout orderFile: Building lincense and remarks.pdf | 18 Aug 2022 |
| Commencement certificateFile: CC remarks and Building lincense.pdf | 18 Aug 2022 |
| Village map showing proposed siteFile: BHOGANAHALLI SITE LOCATION Village map 17082022.pdf | 18 Aug 2022 |
| Updated the total built up area of 11256.18 sqm as per the approved drawing in page 4File: TBUA updation in page 4 screenshot.pdf | 18 Aug 2022 |
| Project schedule dates updated till the proposed completion date in page 6File: Project schedule of Insignia.pdf | 18 Aug 2022 |
| Brief copy of estimated cost of construction certified by the EngineerFile: Form 3 Engineer certificate.pdf | 18 Aug 2022 |
| Mentioned the project name and project address in section 3(1) notarized affidavitFile: Notarized Affidavit for 3(1) Voliation Insignia.pdf | 18 Aug 2022 |
| Renewed BWSSB NOC along with the copy of fee paid receipt towards NOCFile: BWSSB NOC ack with remarks.pdf | 18 Aug 2022 |
| Proforma of Agreement for sale comprising with project bank detailsFile: Proforma of ATS Sobha Insignia.pdf | 18 Aug 2022 |
| BSNL NOC and MSL KSRSACFile: BSNL NOC remarks and MSL KSRSAC.pdf | 18 Aug 2022 |
| RTC, survey 128/7 | - |
| Mutation, survey 128/7 | - |
| Encumbrance Certificate, survey 128/7 | - |
| Conversion/Alienation Order, survey 128/7 | - |
| Sale/Title/Gift Deed, survey 128/7 | - |
| Khatha, survey 128/7 | - |
| Registration CertificateFile: Registration Certificate of SL.pdf | - |
| Organization StructureFile: Organisation Structure.pdf | - |
| Certificate issued by CA Form 1File: Form 1 Sobha Insignia CA c.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Affidavit for No Litigation format for Insignia R1.pdf | - |
| Certificate from Chartered AccountFile: Form 1 Sobha Insignia CA c.pdf | - |
| Balance Sheet 2020 - 2021File: Balance sheet Mar 2022.pdf | - |
| Balance Sheet 2019 - 2020File: Balance sheet Mar 2021.pdf | - |
| Balance Sheet 2018 - 2019File: Balance Sheet Mar 2020.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Profit Loss Statement Mar 2022.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: Profit Loss Statement Mar 2021.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: Profit Loss Statement Mar 2020.pdf | - |
| Director's Report 2020 - 2021File: DR 2021 22.pdf | - |
| Director's Report 2019 - 2020File: DR 2020 21.pdf | - |
| Director's Report 2018 - 2019File: DR 2019 20.pdf | - |
| Cash Flow Statement 2020 - 2021File: Cash Flow Mar 2022.pdf | - |
| Cash Flow Statement 2019 - 2020File: Cash Flow Mar 2021.pdf | - |
| Auditor's Report 2020 - 2021File: Auditors Report Mar 2022.pdf | - |
| Auditor's Report 2019 - 2020File: Auditors Report Mar 2021.pdf | - |
| Auditor's Report 2018 - 2019File: Auditors Report Mar 2020.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: ITR AY 2021 22.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: ITR AY 2020 21.pdf | - |
| Income Tax Return Acknowledgement 2018 - 2019File: ITR AY 2019 20.pdf | - |
| BUILDING LICENCE Insignia | - |
| BESCOM NOC 21052020 | - |
| BWSSB NOC | - |
| Approved drawings Insignia | - |
| Approved drawings Insignia | - |
| Approved drawings Insignia | - |
| Approved drawings and specification | - |
| Approved drawings Insignia | - |
| Insignia Specifications | - |
| Approved drawings Insignia | - |
| NA Area Development Plan Of Project Area | - |
| SSC Insignia 21062022 | - |
| NA Not a JDA | - |
| Change of land use No 96 2020 21 1957 of 2021 2022 c | - |
| District Magistrate | - |
| Official Memorandum No 78 of 2007 08 | - |
| Sale deed docs combined | - |
| Proforma of ATS Sobha Insignia Highlighted Final | - |
| Intimation Letter | - |
| Insigni RERA BOOKLET final Aug 6 2022 | - |
| Form B Sobha Insignia c | - |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 Litigation | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Sep 2028 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 Litigation | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2028 | Not due yet |
| Sobha Windsor Phase 4 Wing 9, 10 and 11 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Mar 2028 | Not due yet |
| Sobha Victoria park phase 2 Litigation | PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE | Ongoing | Dec 2027 | Not due yet |
| Sobha Victoria park phase 1 Litigation | PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE | Ongoing | Dec 2027 | Not due yet |
| Sobha Sentosa Phase 4 Wing 1 and 2 Litigation | PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA | Ongoing | Dec 2027 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 2, W2 Litigation | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Dec 2027 | Not due yet |
| Sobha Windsor Phase 3 Wing 6, 7 and 8 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Sep 2027 | Not due yet |
| Sobha City Athena | Property No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, Bengaluru | Ongoing | Sep 2027 | Not due yet |
| Sobha Sentosa Phase 3 Wing 3 and 4 Litigation | PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA | Ongoing | Jun 2027 | Not due yet |
| Sobha Sentosa Phase 2 Wing 5 and 6 Litigation | PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA | Ongoing | Dec 2026 | Not due yet |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 Litigation | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Dec 2026 | Not due yet |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 Litigation | Balagere, Bangalore | Ongoing | Sep 2026 | Not delivered |
| Sobha Sentosa Phase 1 Wing 7 Litigation | PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 6 - Wing 10 and 11 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 5 - Wing 8 and 9 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 8 - Wing 15 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Apr 2026 | Not delivered |
| Sobha Windsor Phase 2 Wing 3, 4 and 5 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Nov 2025 | Not delivered |
| Sobha Windsor Phase 1 Wing 1 and 2 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Nov 2025 | Not delivered |
| Sobha Rajvilas | Sy. No 19/3, Minerva Mill Quarters, Gopalapura, Mysore Deviation road | Ongoing | Mar 2025 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 24 Wing 29 and 30 | Balagere, Bangalore | Ongoing | Mar 2025 | Not delivered |
| Sobha Lake Gardens Phase 1 | Bharathi Nagar, Krishnarajapura, Seegehalli Village, K.R. Puram Hobli | Ongoing | Nov 2024 | Not delivered |
| Sobha Dream Gardens Phase 2 - Wing 5, 6 and 7 | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Nov 2024 | Not delivered |
| Sobha Dream Gardens Phase 1 - Wing 8 and 9 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Nov 2024 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38 Litigation | Balagere, Bangalore | Ongoing | Sep 2024 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 23 Wing 25, 26, 27 and 28 | Balagere, Bangalore | Ongoing | Sep 2024 | Not delivered |
| Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Royal Pavilion Phase 3 - Wing 16 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Royal Pavilion Phase 2 - Wing 4 and 5 | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Royal Pavilion Phase 1 - Wing 6 and 7 | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2024 | Not delivered |
| Sobha Forest Edge | 02/20/1/21/2 Hosahalli, Kengeri Sub Division, Ward No.198, Bengaluru | Ongoing | Jun 2023 | Not delivered |
| Sobha HRC Pristine Phase 4 Block 4 and 5 Litigation | Survey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, Bengaluru | Ongoing | Apr 2023 | Not delivered |
| Sobha HRC Pristine Phase 3 Block 3 Litigation | Survey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, Bengaluru | Ongoing | Apr 2023 | Not delivered |
| Sobha HRC Pristine Phase 2 Block 2 Litigation | Survey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, Bengaluru | Ongoing | Apr 2023 | Not delivered |
| Sobha HRC Pristine Phase 1 Block 1 Litigation | Survey No. 87/2, 87/3, 80 and 111, Jakkur Village, Yelahanka Hobli, Bengaluru | Ongoing | Apr 2023 | Not delivered |
| Sobha Dream Acres - Palm Springs Phase 16 Wing 50 Litigation | Balagere, Bangalore | Ongoing | Mar 2023 | Not delivered |
| Sobha Arena - Pebble Court (Block 1) Litigation | Kanakapura Road, Bangalore | Ongoing | Jan 2023 | Not delivered |
| Sobha Palm Court Litigation | Yelahanka, Bangalore | Ongoing | Feb 2022 | Not delivered |
| Sobha Morzaria Grandeur 2 (W1) | Dairy circle, Bangalore | Ongoing | Feb 2022 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Sobha Insignia on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 20 registered projects within 2 km.
MAITHRI SPRINGWOODS
MAITHRI DEVELOPERS
Century Mirai Ph1
Century Silicon City Private Limited
MYHNA ORCHID
MYHNA ESTATE PROJECTS
INNOVATIVE PALACIA
SHUBANKARA DEVELOPERS
Saideep Hiranya
Shri Saideep Srinidhi Buildcon LLP
77° LIFE
DivyaSree Infrastructure Projects Private
See every Bengaluru Urban project, with the district possession charts
Builder: SOBHA LIMITED
SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Sobha Insignia is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Sobha Insignia?
The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Sobha Insignia?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Sobha Insignia?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Sobha Insignia?
The professionals named in the filing: Architect: Geetha K Nair; Engineer: Arjun M V; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sobha Insignia?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.