Home / Browse projects / Bengaluru Urban, Karnataka / Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58
Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58
RG-KA-60885 · RERA PRM/KA/RERA/1251/446/PR/200121/003218 · Last updated on RERA Karnataka portal: 3 Oct 2026
Source: official RERA Karnataka filing
Red flags
- Litigation declared, 12 cases
- 2 complaints at RERA Karnataka
- Completion date moved by 9 months
- 1 extension taken
Clear
- Separate project account declared
Saved.
Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/200121/003218 on 21 Jan 2020. Possession is promised by 30 Sep 2026. The completion date has moved by 9 months from the original filing. 356 of the 356 units on this registration are recorded sold or booked, and 14 of 14 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameSobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/200121/003218
- ReraGenie IDRG-KA-60885
Builder
- NameSOBHA LIMITED
- Entity typeCompany
- CINL45201KA1995PLC018475
- Authorized SignatoryLt. Gen Mathew Mammen (Retd), PVSM, AVSM,VSM (Bar)
- Other registrations119 more →
- No longer live8 withdrawn or revoked
- Declared earlier projects196 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on21 Jan 2020
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2025)
- Buildings4 building records
- Documents filed136 files
Current status
Figures as on 3 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing 55 | - | - | - | 60 | 0 | 60 |
| Wing 56 | - | - | - | 118 | 0 | 118 |
| Wing 57 | - | - | - | 60 | 0 | 60 |
| Wing 58 | - | - | - | 118 | 0 | 118 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 3 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 14 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 100% |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry construction: Bricks, Concrete blocks etc | Not applicable |
| Plastering inside , outside & Ceiling | Not applicable |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 100% |
| Painting | 100% |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per santioned drawings | 100% |
Progress on shared amenities41
As on 3 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Internal Roads & Footpaths | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | 100% |
| Water conservation | No | Not applicable |
| Energy management | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | 100% |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | 100% |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 100% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 100% |
| Indoor Sports facility | Yes | 100% |
| Swimming Pool | Yes | 100% |
| Gym | Yes | 100% |
| Parks | Yes | 100% |
| Power Backup | Yes | 100% |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | 100% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 100% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 100% |
| Terrace | Yes | 100% |
| Outer Wall | No | Not applicable |
| Open parking areas and common storage spaces | Yes | 100% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 113.45 cr | Rs 204.08 cr |
| On-site expenditure-Site Overhead | Rs 12.21 cr | Rs 3.18 cr |
| Payment of taxes | Rs 10.06 cr | Rs 17.67 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | - | Rs 12.11 cr |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Arun Kumar |
| Engineer | Anilkumar S Hokrani |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Litigation declared12
| Case | Court | Status |
|---|---|---|
| 594 | II Addl. (Sr.Dn.), Bangalore Rural | - |
| 356 | Principal Civil Judge (Sr. Dn.), Banglaore Rural | - |
| 227 | Principal (Sr.Dn.) Civil Judge, Bangalore Rural | - |
| 448 | III Additional Senior Civil Judge Bengaluru Rural Dist | - |
| 1351 | 1st Additional Senior Civil Judge Bengaluru Rural Dist | - |
| 815 | I Additional Senior Civil Judge, Bengaluru Rural, Bengaluru | - |
| 17398 | High court of Karnataka | - |
| 25145 | High court of Karnataka | - |
| 388 | High court of Karnataka | - |
| 13573 | High court of Karnataka | - |
| 368 | IV Additional Senior Civil Judge Bengaluru Rural Dist | - |
| 483 | III Additional Senior Civil Judge Bengaluru Rural Dist | - |
Complaints filed with RERA Karnataka2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/221226/0010531 | - | SOBHA LIMITED | 26/12/2022 |
| 00781/2025 | - | SOBHA LIMITED | 27/05/2025 |
Documents filed136
As listed on the registration, under the names the promoter filed them with; the newest 80 of 136 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/200121/003218 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: SDA O PH27.pdf | 3 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: SDA PH27.pdf | 3 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Dream Acres Oasis Phase 27.pdf | 3 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 3 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 3 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 3 Oct 2026 |
| Q2 2026-27 Fire and Safety | 3 Oct 2026 |
| Q2 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: OS No 815 2017 Order dt 08072024.pdf | 3 Oct 2026 |
| Q2 2026-27 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 3 Oct 2026 |
| Q2 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: W P 17398 disposed.pdf | 3 Oct 2026 |
| Q2 2026-27 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 3 Oct 2026 |
| Q2 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: 25145 disposed.pdf | 3 Oct 2026 |
| Q2 2026-27 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 3 Oct 2026 |
| Q2 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: 388 disposed.pdf | 3 Oct 2026 |
| Q2 2026-27 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 3 Oct 2026 |
| Q2 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: 13573 disposed.pdf | 3 Oct 2026 |
| Q2 2026-27 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 3 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: SDA O PH27.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: SDA PH27.pdf | 10 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Dream Acres Oasis Phase 27.pdf | 10 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 10 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 10 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 10 Jul 2026 |
| Q1 2026-27 Fire and Safety | 10 Jul 2026 |
| Q1 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: OS No 815 2017 Order dt 08072024.pdf | 10 Jul 2026 |
| Q1 2026-27 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 10 Jul 2026 |
| Q1 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: W P 17398 disposed.pdf | 10 Jul 2026 |
| Q1 2026-27 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 10 Jul 2026 |
| Q1 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: 25145 disposed.pdf | 10 Jul 2026 |
| Q1 2026-27 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 10 Jul 2026 |
| Q1 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: 388 disposed.pdf | 10 Jul 2026 |
| Q1 2026-27 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 10 Jul 2026 |
| Q1 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: 13573 disposed.pdf | 10 Jul 2026 |
| Q1 2026-27 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 10 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: SDA O PH27.pdf | 9 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: SDA PH27.pdf | 9 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: SDA PH27.pdf | 9 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 9 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 9 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 9 Apr 2026 |
| Q4 2025-26 Fire and Safety | 9 Apr 2026 |
| Q4 2025-26 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: OS No 815 2017 Order dt 08072024.pdf | 9 Apr 2026 |
| Q4 2025-26 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 9 Apr 2026 |
| Q4 2025-26 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: W P 17398 disposed.pdf | 9 Apr 2026 |
| Q4 2025-26 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 9 Apr 2026 |
| Q4 2025-26 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: 25145 disposed.pdf | 9 Apr 2026 |
| Q4 2025-26 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 9 Apr 2026 |
| Q4 2025-26 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: 388 disposed.pdf | 9 Apr 2026 |
| Q4 2025-26 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 9 Apr 2026 |
| Q4 2025-26 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: 13573 disposed.pdf | 9 Apr 2026 |
| Q4 2025-26 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 9 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: SDA O PH27 C.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: SDA PH 27.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: SDA PH 27.pdf | 12 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 12 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 12 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 12 Jan 2026 |
| Q3 2025-26 Fire and Safety | 12 Jan 2026 |
| Q3 2025-26 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: OS No 815 2017 Order dt 08072024.pdf | 12 Jan 2026 |
| Q3 2025-26 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 12 Jan 2026 |
| Q3 2025-26 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: W P 17398 disposed.pdf | 12 Jan 2026 |
| Q3 2025-26 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 12 Jan 2026 |
| Q3 2025-26 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: 25145 disposed.pdf | 12 Jan 2026 |
| Q3 2025-26 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 12 Jan 2026 |
| Q3 2025-26 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: 388 disposed.pdf | 12 Jan 2026 |
| Q3 2025-26 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 12 Jan 2026 |
| Q3 2025-26 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: 13573 disposed.pdf | 12 Jan 2026 |
| Q3 2025-26 Any further orders in this regardFile: NA NO FURTHER ORDERS.pdf | 12 Jan 2026 |
| Previous Project DetailsFile: Previous Project Details.pdf | 10 Jan 2020 |
| ITR AY 2018 19File: ITR AY 2018 19.pdf | 10 Jan 2020 |
| ITR AY 2019 20File: ITR AY 2019 20.pdf | 10 Jan 2020 |
| Promoter DetailsFile: Promoter Details.pdf | 10 Jan 2020 |
| Site Plan Indicating Phase 27 and Sanction PlanFile: DA Phase 27 - Plan.pdf | 10 Jan 2020 |
| Floor PlansFile: Floor Plans Phase 27.pdf | 10 Jan 2020 |
| BBMP letter on Validity of commencement certificate and sanction letterFile: Sanction letter with Clarification on CC validity.pdf | 10 Jan 2020 |
| Conversion Order (49/1, 49/2, 49/5, 50/2, 50/3, 50/4, 50/5, 50/6, 60/4, 61/1, and 61/3)File: Conversion Order R1_compressed.pdf | 6 Jan 2020 |
| Sale Deeds (51/2c1, 60/4, 76/1)File: SD - DA.pdf | 6 Jan 2020 |
| ECFile: EC - DA_compressed R0.pdf | 6 Jan 2020 |
| Sanction & Comencement Certificate ValidityFile: Sanction letter & Clarification on CC validity.pdf | 6 Jan 2020 |
| CertificateFile: Registration Certificate.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Sobha Dream Acres - Oasis Phase 27 Wing 55, on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 94 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: SOBHA LIMITED
SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58?
The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58?
The professionals named in the filing: Architect: Arun Kumar; Engineer: Anilkumar S Hokrani. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on.