SOBHA Crystal Meadows Phase 3 Wing 9 to 15
RG-KA-04223 · RERA PRM/KA/RERA/1251/446/PR/280324/006735 · Last updated on RERA Karnataka portal: 13 Apr 2026
Source: official RERA Karnataka filing
Red flags
- Registration withdrawn
- Litigation declared, 3 cases
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SOBHA Crystal Meadows Phase 3 Wing 9 to 15 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/280324/006735 on 28 Mar 2024. Possession is promised by 31 Dec 2032. 0 of the 59 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameSOBHA Crystal Meadows Phase 3 Wing 9 to 15
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560035
- Pincode560035
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/280324/006735
- ReraGenie IDRG-KA-04223
Builder
- NameSOBHA LIMITED
- Entity typeCompany
- CINL45201KA1995PLC018475
- GSTIN29AABCS7723E1ZB
- Authorized SignatoryMr. Suresh Ganiga
- Managing DirectorMr Jagadish Nangineni
- DirectorMr Jagadish Nangineni
- Project HeadMr Kishor Raj
- Other registrations119 more →
- No longer live8 withdrawn or revoked
- Declared earlier projects196 →
Key dates
Key facts
Registration and timeline
- StatusRegistration withdrawn
- Registered on28 Mar 2024
- Promised completion31 Dec 2032
- Revised completionNone
- Buildings1 building record
- Documents filed412 files
Current status
Figures as on 13 Apr 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1Wing 9 to 15 | - | - | - | 59 | 0 | 59 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.
Building: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 0% |
| Foundation footing work | 0% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 13 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | Yes | 0% |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | Yes | 0% |
| Staircases | Yes | 0% |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | No | Not applicable |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership48
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
| M/s. Sobha Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 177.99 cr | Rs 2.41 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 44.44 cr | Rs 2.46 cr |
| Payment of taxes | Rs 21.14 cr | - |
| On-site expenditure-Site Overhead | Rs 17.80 cr | Rs 63.56 lakh |
Certifying professionals and partners4
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vinita Agast |
| Engineer | Mr. Srinivas Sathyanarayan |
| Engineer | Balakrishnan G |
| Chartered Accountant | Balaji D |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 1028/2010/2010 | O S No1028/2010 filed by one Smt Kempamma against Smt Jayamma and others before the IV Addl Senior Civil Judge Bangalore Rural District Bangalore | - |
| 1520/2012/2012 | O S No 1520/2012 filed by one Sri Gajendra against Sri Gullappa and others before I Addl Civil Judge Bangalore Rural District Bangalore | - |
| 642/2014/2014 | O S No 642/2014 filed by Smt Chandramma and others against Sri Muniyallappa and others before the III Addl Senior Civil Judge Bangalore Rural District Bangalore | - |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed412
As listed on the registration, under the names the promoter filed them with; the newest 80 of 412 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/280324/006735 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: crystal meadows 3.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Crystal Meadows PH3.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Crystal Meadows Phase 3.pdf | 13 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 13 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: crystal meadows 3.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Crystal Meadows PH3.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Crystal Meadows PH 3.pdf | 12 Jan 2026 |
| Bank affidavitFile: SCM PH3 Bank Aff.pdf | 14 Mar 2024 |
| profit and loss account and balance sheetFile: Financial Results 20 21.pdf | 14 Mar 2024 |
| profit and loss account and balance sheetFile: Financial Results 21 22.pdf | 14 Mar 2024 |
| profit and loss account and balance sheetFile: Financial Results 22 23.pdf | 14 Mar 2024 |
| chartered accountant certificate form -1File: Form 1 CA ph 3.pdf | 14 Mar 2024 |
| Registration fees paid noteFile: 4 Registration fees paid.pdf | 14 Mar 2024 |
| Registration fee paid on kharab landFile: Registration fee paid on kharab land.pdf | 14 Mar 2024 |
| current year RTC for all 48 snos involved in the projectFile: 5 RTC for the year 2023 24 for all Sy Nos c.pdf | 14 Mar 2024 |
| kharab affidavitFile: Affidavit Kharab ph 3.pdf | 14 Mar 2024 |
| regularization order by deputy commissionerFile: 7 Regularization order by deputy commissioner.pdf | 14 Mar 2024 |
| EC for all sno of the project from 1-4-2007 to 31-3-2010File: 8 ECs compressed.pdf | 14 Mar 2024 |
| full MR for sno 76/3File: 9 SyNo76 3 MR No 41 of 2007 08.pdf | 14 Mar 2024 |
| MR for sno 80/2, sno 79 measuring 1a20g , 81/10File: 10 MRs for SyNo80 2 79 81 10.pdf | 14 Mar 2024 |
| litigations connected to project propertiesFile: Affidavit Litigations ph 3.pdf | 14 Mar 2024 |
| commencement certificateFile: 12 Commencement certificate note.pdf | 14 Mar 2024 |
| Building License.File: 13 Building License.pdf | 14 Mar 2024 |
| CDP map showing proposed site.File: 15 CDP PLAN.pdf | 14 Mar 2024 |
| ZR copy for nala and lake buffer.File: Buffer as per BDA Zoning Regulations.pdf | 14 Mar 2024 |
| SEIAA NOC.File: 17 SEIAA and pymt fee receipt.pdf | 14 Mar 2024 |
| KSPCB NOCFile: Ph3 up.pdf | 14 Mar 2024 |
| phase wise demarcation plan.File: PHASE 03.pdf | 14 Mar 2024 |
| certified carpet area calculation.File: SCM P3 carpet area.pdf | 14 Mar 2024 |
| sectional drawings and elevationsFile: SECTIONS & ELEVATIONS.pdf | 14 Mar 2024 |
| Floor plansFile: Ph 3 c.pdf | 14 Mar 2024 |
| Site planFile: Site Plan SCM.pdf | 14 Mar 2024 |
| phase wise demarcation plan.File: ALL PHASES.pdf | 14 Mar 2024 |
| Area calculation sheet certified by the EngineerFile: 23 SCM Development details.pdf | 14 Mar 2024 |
| latest dated self attested copy of the Engineer license certificateFile: 24 Engineer license certificate.pdf | 14 Mar 2024 |
| Amenities and Common area detailsFile: SCM P3 Common areas.pdf | 14 Mar 2024 |
| STP design drawing attestedFile: Attested STP design drawings and tech writup.pdf | 14 Mar 2024 |
| Land cost calculation sheetFile: 27 SCM LAND AREA CALUCLATION.pdf | 14 Mar 2024 |
| source of water supply to the projectFile: source of water supply.pdf | 14 Mar 2024 |
| proforma of Agreement for SaleFile: Proforma of ATS SCM ph3 .pdf | 14 Mar 2024 |
| RTC, survey 64/1 | - |
| Mutation, survey 64/1 | - |
| Encumbrance Certificate, survey 64/1 | - |
| Conversion/Alienation Order, survey 64/1 | - |
| Sale/Title/Gift Deed, survey 64/1 | - |
| Khatha, survey 64/1 | - |
| RTC, survey 64/2 | - |
| Mutation, survey 64/2 | - |
| Encumbrance Certificate, survey 64/2 | - |
| Conversion/Alienation Order, survey 64/2 | - |
| Sale/Title/Gift Deed, survey 64/2 | - |
| Khatha, survey 64/2 | - |
| RTC, survey 64/3 | - |
| Mutation, survey 64/3 | - |
| Encumbrance Certificate, survey 64/3 | - |
| Conversion/Alienation Order, survey 64/3 | - |
| Sale/Title/Gift Deed, survey 64/3 | - |
| Khatha, survey 64/3 | - |
| RTC, survey 65/2 | - |
| Mutation, survey 65/2 | - |
| Encumbrance Certificate, survey 65/2 | - |
| Conversion/Alienation Order, survey 65/2 | - |
| Sale/Title/Gift Deed, survey 65/2 | - |
| Khatha, survey 65/2 | - |
| RTC, survey 64/4 | - |
| Mutation, survey 64/4 | - |
| Encumbrance Certificate, survey 64/4 | - |
| Conversion/Alienation Order, survey 64/4 | - |
| Sale/Title/Gift Deed, survey 64/4 | - |
| Khatha, survey 64/4 | - |
| RTC, survey 75/1 | - |
| Mutation, survey 75/1 | - |
| Encumbrance Certificate, survey 75/1 | - |
| Conversion/Alienation Order, survey 75/1 | - |
| Sale/Title/Gift Deed, survey 75/1 | - |
| Khatha, survey 75/1 | - |
| RTC, survey 75/3 | - |
| Mutation, survey 75/3 | - |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Sobha Neopolis Phase 5 - W 5, 6 & 7 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2031 | Not due yet |
| Sobha Neopolis Phase 4 - 3, 4, 8 & 9 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2031 | Not due yet |
| Sobha Neopolis Phase 2 - W 12 & 13 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2030 | Not due yet |
| Sobha Neopolis Phase 3 - W 1, 2, 10 & 11 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2029 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 4, W4 Litigation | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2029 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 Litigation | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2029 | Not due yet |
| Sobha Royal crest Litigation | "PROPOSED RESIENTIAL APARMENT @ BBMP Katha no. 989/38/2, 38/4, 80/3, 37/1, 38/3, 80/2, 38/1, 35/3, 35/4, 37/2 , 38/5, 79, 80/1 @ HOSAKARAHALLI VILLAGE, UTTARAHALLI HOBLI, NEAR P.E.S COLLEGE,BANGALORE SOUTH TALUK., WARD NO 160, RAJARAJESHWARINAGAR ZONE" | Ongoing | Dec 2028 | Not due yet |
| Sobha Neopolis Phase 1 - W 14, 15, 16, 17, 18&19 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2028 | Not due yet |
| Sobha Dream Gardens Phase 5 - Wing 10 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2028 | Not due yet |
| Sobha Dream Gardens Phase 4 - Wing 1 and 2 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2028 | Not due yet |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 Litigation | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Sep 2028 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2028 | Not due yet |
| Sobha Windsor Phase 4 Wing 9, 10 and 11 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Mar 2028 | Not due yet |
| Sobha Victoria park phase 2 | "PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE " | Ongoing | Dec 2027 | Not due yet |
| Sobha Victoria park phase 1 | "PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE " | Ongoing | Dec 2027 | Not due yet |
| Sobha Sentosa Phase 4 Wing 1 and 2 | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Dec 2027 | Not due yet |
| Sobha Oakshire Phase 3 Wing 5,6,11 and 12 | Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110 | Ongoing | Dec 2027 | Not due yet |
| Sobha Dream Gardens Phase 3 - Wing 3 and 4 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2027 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 2, W2 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Dec 2027 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Dec 2027 | Not due yet |
| Sobha Windsor Phase 3 Wing 6, 7 and 8 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Sep 2027 | Not due yet |
| Sobha City Athena | Property No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, Bengaluru | Ongoing | Sep 2027 | Not due yet |
| Sobha Sentosa Phase 3 Wing 3 and 4 Litigation | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Jun 2027 | Not due yet |
| Sobha Oakshire Phase 2 Wing 3,4,9 and 10 | Field is not sufficient to enter the details | Ongoing | Jun 2027 | Not due yet |
| Sobha Sentosa Phase 2 Wing 5 and 6 Litigation | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Dec 2026 | Not due yet |
| Sobha Oakshire Phase 1 Wing 1,2,7 and 8 | Field is not sufficient to enter the details | Ongoing | Dec 2026 | Not due yet |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 Litigation | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Dec 2026 | Not due yet |
| Sobha Galera | "SOBHA GALERA, SURVEY NO 45/4 OF HUSKUR VILLAGE, BIDARAHALLI HOBLI, BANGLAORE EAST TALUK SURVEY NO.116 OF AMANIDODDAKERE VILLAGE, KASABA HOBLI, HOSAKOTE TALUK, BANGALORE , BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 560049" | Ongoing | Dec 2026 | Not due yet |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 Litigation | Balagere, Bangalore | Ongoing | Sep 2026 | Not delivered |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 Litigation | Balagere, Bangalore | Ongoing | Sep 2026 | Not delivered |
| Sobha Sentosa Phase 1 Wing 7 Litigation | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 8 - Wing 15 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 6 - Wing 10 and 11 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 5 - Wing 8 and 9 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Windsor Phase 2 Wing 3, 4 and 5 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Apr 2026 | Not delivered |
| Sobha Insignia Litigation | KHATHA NO.1232/128/7, SY NO.128/7, BHOGANAHALLI VILLAGE VARTHUR HOBLI, BENGALURU EAST, BENGALURU URBAN | Ongoing | Mar 2026 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 and 24 Litigation | Balagere, Bangalore | Ongoing | Mar 2026 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 and 24 Litigation | Balagere, Bangalore | Ongoing | Mar 2026 | Not delivered |
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 and 22 Litigation | Balagere, Bangalore | Ongoing | Mar 2026 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SOBHA Crystal Meadows Phase 3 Wing 9 to 15 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 44 registered projects within 2 km.
BIRLA EVARA
VARDHITA PROPERTIES PRIVATE LIMITED
DSR HIGHLAND GREENZ
DSR INFRA PROJECTS
TRIFECTA VANTO PHASE-1
TRIFECTA PROJECTS PRIVATE LIMITED
GODREJ LAKESIDE ORCHARD
Godrej Properties Limited
Adarsh Tropica (Phase-2)
ORCHIDS APARTMENTS PVT LTD
East Park Residences
Ramsons Trendsquares Realty LLP
See every Bengaluru Urban project, with the district possession charts
Builder: SOBHA LIMITED
SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What does it mean that SOBHA Crystal Meadows Phase 3 Wing 9 to 15 shows as registration withdrawn on RERA Karnataka?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the RERA Karnataka portal, and take legal advice before paying any further instalment.
What are my rights if SOBHA Crystal Meadows Phase 3 Wing 9 to 15 is delayed beyond 31 Dec 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SOBHA Crystal Meadows Phase 3 Wing 9 to 15?
The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SOBHA Crystal Meadows Phase 3 Wing 9 to 15?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SOBHA Crystal Meadows Phase 3 Wing 9 to 15?
The professionals named in the filing: Architect: Vinita Agast; Engineer: Mr. Srinivas Sathyanarayan; Engineer: Balakrishnan G; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SOBHA Crystal Meadows Phase 3 Wing 9 to 15?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback