Home / Browse projects / Mandya, Karnataka / SOBHA BOULEVARD
SOBHA BOULEVARD
RG-KA-91981 · RERA PRM/KA/RERA/1267/374/PR/100626/008716 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SOBHA BOULEVARD is a Plotted Development project by SOBHA LIMITED in Mandya, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1267/374/PR/100626/008716 on 10 Jun 2026. Possession is promised by 31 Dec 2028.
At a glance
Project
- NameSOBHA BOULEVARD
- TypePlotted Development
- Location
- Shrirangapattna
- Mandya
- PincodeNot stated
- RERA no.PRM/KA/RERA/1267/374/PR/100626/008716
- ReraGenie IDRG-KA-91981
Builder
- NameSOBHA LIMITED
- Entity typeCompany
- CINL45201KA1995PLC018475
- GSTIN29AABCS7723E1ZB
- Authorized SignatoryPAVITHRA G KALMAT
- Managing DirectorMr Jagadish Nangineni
- DirectorMr Jagadish Nangineni
- Project HeadNandeesh raju
- Other registrations119 more →
- No longer live8 withdrawn or revoked
- Declared earlier projects196 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on10 Jun 2026
- Promised completion31 Dec 2028
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed74 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sobha Ltd | - | - |
| Sobha Ltd | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 31.86 cr | Rs 29.48 lakh |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 2.50 cr | - |
| On-site expenditure-Consultants Fees | Rs 2.09 cr | - |
| Payment of taxes | Rs 35.74 lakh | - |
| On-site expenditure-Site Overhead | - | Rs 5.45 lakh |
| Principal sum and interest payable to financial institutions-Scheduled Banks | - | Rs 25,780 |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Engineer | Balakrishnan G |
| Chartered Accountant | Balaji D |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed74
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1267/374/PR/100626/008716 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Boulevard C.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Boulevard.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Boulevard.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Sobha Boulevard 1.pdf | 13 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 13 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 13 Jul 2026 |
| Draft ATS - Sobha BoulevardFile: Draft ATS - Sobha Boulevard.pdf | 10 Jun 2026 |
| Project estimation BreakupFile: Project estimation Breakup.pdf | 10 Jun 2026 |
| RTC, survey 5/2 | - |
| Mutation, survey 5/2 | - |
| Encumbrance Certificate, survey 5/2 | - |
| Conversion/Alienation Order, survey 5/2 | - |
| Sale/Title/Gift Deed, survey 5/2 | - |
| Khatha, survey 5/2 | - |
| RTC, survey 1174 | - |
| Mutation, survey 1174 | - |
| Encumbrance Certificate, survey 1174 | - |
| Conversion/Alienation Order, survey 1174 | - |
| Sale/Title/Gift Deed, survey 1174 | - |
| Khatha, survey 1174 | - |
| Registration CertificateFile: Registration Certificate of SL.pdf | - |
| Memorandum of AssociationFile: MOA SL.pdf | - |
| Article of AssociationFile: AOA SL c.pdf | - |
| GST CertificateFile: GST Certificate self attested.pdf | - |
| Organization StructureFile: Organisation Structure.pdf | - |
| Certificate issued by CA Form 1File: Form-1 CA Sobha Boulevard.pdf | - |
| Certificate issued by Engineer Form 3File: Form-3 Sobha Boulevard and Estimation summary.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| AffidavitFile: Non litigations.pdf | - |
| Balance Sheet 2024 - 2025File: Financials FY 2024-25.pdf | - |
| Balance Sheet 2023 - 2024File: Balance Sheet Mar 2024.pdf | - |
| Balance Sheet 2022 - 2023File: Balance sheet Mar 2023.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: Financials FY 2024-25.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Profit Loss Statement Mar 2024.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Profit Loss Statement Mar 2023.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: ITR AY 2025-26.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: ITR Ack AY 2024 25.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR AY 2023 24.pdf | - |
| Director's Report 2024 - 2025File: Financials FY 2024-25.pdf | - |
| Director's Report 2023 - 2024File: DR 2023 24.pdf | - |
| Director's Report 2022 - 2023File: DR 2022 23.pdf | - |
| Cash Flow Statement 2024 - 2025File: Financials FY 2024-25.pdf | - |
| Cash Flow Statement 2023 - 2024File: Cash Flow Mar 2024.pdf | - |
| Auditor's Report 2024 - 2025File: Financials FY 2024-25.pdf | - |
| Auditor's Report 2023 - 2024File: Auditors Report FY 2023 2024.pdf | - |
| Auditor's Report 2022 - 2023File: Auditors Report Mar 2023.pdf | - |
| Layout plan sanction letter | - |
| Provisional residential layout plan | - |
| Specifications Boulevard R3 | - |
| RERA Boulevard Brochure R1 | - |
| Draft ATS - Sobha Boulevard | - |
| Boulevard Allotment letter | - |
| Form B Boulevard | - |
| Sec 3(1) Affidavit | - |
| Title Report | - |
| CESOM NOC Ack Affidavit notarized | - |
| Water NOC ack Affidavit notarized | - |
| KSPCB NOC Declaration Affidavit | - |
| Unnamed document | - |
| No Sales declaration Boulevard | - |
| Village Map Demarcation | - |
| STP details- RERA | - |
| Boulevard CDP PLAN | - |
| STP Layout_Signed | - |
| CLU Copy | - |
| ADLR Sketch | - |
| Land cost calculation sheet with Guidelines value | - |
| Phodi and Akarband | - |
| Prospectus/BrochureFile: RERA Boulevard Brochure R1 C.pdf | - |
| Plot Excel SheetFile: Sobha Boulevard.xlsx | - |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SOBHA Crystal Meadows Phase 5 Wing 16 to 22 | SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442 | Ongoing | Dec 2035 | Not due yet |
| SOBHA Crystal Meadows Phase 4 Wing 23 to 28 | SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442 | Ongoing | Dec 2033 | Not due yet |
| Sobha Hamptons -Townpark Phase 2 W1 to 3 | PROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKA | Ongoing | Jun 2033 | Not due yet |
| Sobha Madison Heights-Townpark Phase 2 W1 to 4 | PROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKA | Ongoing | Dec 2032 | Not due yet |
| SOBHA Crystal Meadows Phase 3 Wing 9 to 15 | SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442 | Ongoing | Dec 2032 | Not due yet |
| Sobha Neopolis Phase 5 - W 5, 6 & 7 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2031 | Not due yet |
| Sobha Neopolis Phase 4 - 3, 4, 8 & 9 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2031 | Not due yet |
| SOBHA Ayana at Dream Acres Wing 60 to 71 | Sy No 50/2, 50/4, 50/5, 50/6, 51/1,51/2B1, 51/2B2, 51/3,51/4, 51/2C1,51/2C2, 53/1 and 53/2 of BalagereVillage , Ward No 149 , Varthur Hobli ,Bengaluru East , Bengaluru Urban,Karnataka - 560087 | Ongoing | Dec 2031 | Not due yet |
| Sobha Hamptons -Townpark Phase 1 W4 to 6 | PROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKA | Ongoing | Jun 2031 | Not due yet |
| SOBHA Crystal Meadows Phase 2 Wing 7 and 8 | SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442 | Ongoing | Jun 2031 | Not due yet |
| Sobha Altair | "SOBHA ALTAIR, SY NO 56, HADOSIDDAPURA VILLAGE, CHIKKANNELLI VILLAGE VARTHUR HOBLI, BENGALURU EAST TALUK, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 560035" | Ongoing | May 2031 | Not due yet |
| Sobha Neopolis Phase 2 - W 12 & 13 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2030 | Not due yet |
| Sobha Madison Heights-Townpark Phase 1 W5 to 7 | PROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKA | Ongoing | Dec 2030 | Not due yet |
| Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2 | Survey nos 10,55, 7/2, 8/2, 9/10, 9/11,9/12, 9/13, 9/14, 9/15, 9/16 , NEARAYAPPASWAMY TEMPLE, AGARAVILLAGE , BENGALURU , Bengaluru East, Bengaluru Urban, Karnataka - 560034 | Ongoing | Dec 2030 | Not due yet |
| Sobha Infinia Phase 2A Block 5 Wing 5 | Survey nos 10,55, 7/2, 8/2, 9/10, 9/11,9/12, 9/13, 9/14, 9/15, 9/16 , NEARAYAPPASWAMY TEMPLE, AGARAVILLAGE , BENGALURU , Bengaluru East, Bengaluru Urban, Karnataka - 560034 | Ongoing | Jun 2030 | Not due yet |
| Sobha Magnus | "E-KATHA NO.7863600645, SY.NO. 87/2, 87/3 SITUATED AT KOTHANUR VILLAGE , UTTARAHALLI HOBLI , Bengaluru South , Bengaluru Urban, Karnataka " | Ongoing | May 2030 | Not due yet |
| Sobha Neopolis Phase 3 - W 1, 2, 10 & 11 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2029 | Not due yet |
| SOBHA Crystal Meadows Phase 1 Wing 1 to 6 | SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442 | Ongoing | Dec 2029 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2029 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2029 | Not due yet |
| Sobha Royal crest | "PROPOSED RESIENTIAL APARMENT @ BBMP Katha no. 989/38/2, 38/4, 80/3, 37/1, 38/3, 80/2, 38/1, 35/3, 35/4, 37/2 , 38/5, 79, 80/1 @ HOSAKARAHALLI VILLAGE, UTTARAHALLI HOBLI, NEAR P.E.S COLLEGE,BANGALORE SOUTH TALUK., WARD NO 160, RAJARAJESHWARINAGAR ZONE" | Ongoing | Dec 2028 | Not due yet |
| Sobha Neopolis Phase 1 - W 14, 15, 16, 17, 18&19 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2028 | Not due yet |
| Sobha Dream Gardens Phase 5 - Wing 10 | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2028 | Not due yet |
| Sobha Dream Gardens Phase 4 - Wing 1 and 2 | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2028 | Not due yet |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Sep 2028 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2028 | Not due yet |
| Sobha Windsor Phase 4 Wing 9, 10 and 11 | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Mar 2028 | Not due yet |
| Sobha Victoria park phase 2 | "PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE " | Ongoing | Dec 2027 | Not due yet |
| Sobha Victoria park phase 1 | "PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE " | Ongoing | Dec 2027 | Not due yet |
| Sobha Sentosa Phase 4 Wing 1 and 2 | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Dec 2027 | Not due yet |
| Sobha Oakshire Phase 3 Wing 5,6,11 and 12 | Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110 | Ongoing | Dec 2027 | Not due yet |
| Sobha Dream Gardens Phase 3 - Wing 3 and 4 | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2027 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 2, W2 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Dec 2027 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Dec 2027 | Not due yet |
| Sobha Windsor Phase 3 Wing 6, 7 and 8 | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Sep 2027 | Not due yet |
| Sobha City Athena | Property No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, Bengaluru | Ongoing | Sep 2027 | Not due yet |
| Sobha Sentosa Phase 3 Wing 3 and 4 | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Jun 2027 | Not due yet |
| Sobha Oakshire Phase 2 Wing 3,4,9 and 10 | Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110 | Ongoing | Jun 2027 | Not due yet |
| Sobha Oakshire Phase 1 Wing 1,2,7 and 8 | Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110 | Ongoing | Dec 2026 | Not due yet |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Dec 2026 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mandya
Computed across the 81 Mandya projects on ReraGenie, from their own filings.
Keep SOBHA BOULEVARD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mandya81 in Mandya
Zuari Garden city - Kaveri Apartments
ZUARI INFRAWORLD INDIA LIMITED
Zuari Garden City - Brindavan Serenity
ZUARI INFRAWORLD INDIA LIMITED
Construction PKGB 88 DU's
CMC mandya
Sharadindu - State III
Sree Senior Homes
Sharadindu Stage VI
Sree Senior Homes
SHARADINDU STAGE IV
SREE SENIOR HOMES
See every Mandya project, with the district possession charts
Builder: SOBHA LIMITED
SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Mandya district page.
Frequently asked questions
What are my rights if SOBHA BOULEVARD is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SOBHA BOULEVARD?
The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SOBHA BOULEVARD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SOBHA BOULEVARD?
The professionals named in the filing: Engineer: Balakrishnan G; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SOBHA BOULEVARD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.