Home / Browse projects / Mandya, Karnataka / Sharadindu Stage VI
Sharadindu Stage VI
RG-KA-08426 · RERA PRM/KA/RERA/1267/375/PR/071126/009087 · Last updated on RERA Karnataka portal: 3 Nov 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Sharadindu Stage VI is a Residential/Group Housing project by Sree Senior Homes in Mandya, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1267/375/PR/071126/009087 on 7 Nov 2026. Possession is promised by 31 Dec 2035.
At a glance
Project
- NameSharadindu Stage VI
- TypeResidential/Group Housing
- Location
- Pandavapura
- Mandya
- 571434
- Pincode571434
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1267/375/PR/071126/009087
- ReraGenie IDRG-KA-08426
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on7 Nov 2026
- Promised completion31 Dec 2035
- Revised completionNone
- Buildings2 building records
- Documents filed141 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block G | - | - | - | 16 | 0 | 16 |
| Block H | - | - | - | 16 | 0 | 16 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 3 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities37
As on 3 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | Yes | - |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Water and Sanitation | Yes | - |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sree Senior Homes | - | - |
| Sree Senior Homes | - | - |
| Sree Senior Homes | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 4.80 cr | - |
| Administrative Costs | Rs 3.50 cr | - |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 34.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 6.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Trupti N Shah |
| Engineer | Chethan PV |
| Chartered Accountant | M N Sunil Kumar |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed141
As listed on the registration, under the names the promoter filed them with; the newest 80 of 141 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1267/375/PR/071126/009087 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| TCP 1 MATER PLAN WITH ALL THE STAGES CERTIFIED BY ARCHITECTFile: Master plan with stage wise mapping (1).pdf | 3 Nov 2026 |
| TCP 2 CLARIFICATION OVER THE KSPCB CFO RELATING THAT TO EXISTING USAGE ETC.,File: Clarification KSPCB NOC Letter 03 11 2026.pdf | 3 Nov 2026 |
| TCP MATER PLAN WILL ALL THE STAGE CERTIFIED BY ARCHITECT MORE VISIBLEFile: Master plan with stage wise mapping (1).jpg | 3 Nov 2026 |
| PIC 1 OF COMPLETED STAGESFile: 1 Aerial View Block P & Block L.jpeg | 3 Nov 2026 |
| PIC 2 OF COMPLETED STAGESFile: 2 Aerial Views Apartment.jpeg | 3 Nov 2026 |
| PIC 3 OF AERIEL VIEW OF COMPLETED STAGESFile: 3 Aerial_View.jpeg | 3 Nov 2026 |
| PIC 4 OF APARTMENTS OC COMPLETED STAGESFile: 4 Apartment Views.jpeg | 3 Nov 2026 |
| PIC 5 CENTRAL GARDEN OF ALL STAGESFile: 5 Central_garden.jpeg | 3 Nov 2026 |
| PIC 6 CLUB HOUSE OF ALL STAGESFile: 6 Club_House.jpeg | 3 Nov 2026 |
| PIC 7 WATER TREATMENT PURIUFIERFile: 6 Water Treatment Purifier.jpeg | 3 Nov 2026 |
| PIC 8 SEWAGE TREATMENT PLANTFile: 8 Sewage treatment plant.jpeg | 3 Nov 2026 |
| PIC 9 OF OVERALL VIEW OF TOTAL PROJECTFile: 9 Sharadindu Project Aerial View.jpeg | 3 Nov 2026 |
| AEE 1, 2 & 3 We have entered the details in the respective areasFile: AEE 1, 2 and 3 Clarification of the points.pdf | 22 Oct 2026 |
| AEE 4 Land Cost Calculation with certificate of guidelines valueFile: Er 4 Land Cost calculation with Certificate of GV.pdf | 22 Oct 2026 |
| TCP 1 Visible Sanctioned PlanFile: TCP 1 Visible SANCTIONED PLAN BLOCK G & H.pdf | 22 Oct 2026 |
| TCP 2 DTCP Order and PlanFile: TCP 2 DTCP Order & Plan.pdf | 22 Oct 2026 |
| TCP 3 Construction or Building License of all BlocksFile: TCP 3 Construction or Building Licenses of all blocks.pdf | 22 Oct 2026 |
| TCP 4 Stage Wise Development Plans duly sanctioned by DTCPFile: TCP 4 Clarification of phase wise development phase demarcation drawings certified by the | 22 Oct 2026 |
| TCP 5 All Drawings A to Z as available with usFile: TCP 5 All drawings, floor plan, sectional drawings and elevations.pdf | 22 Oct 2026 |
| TCP 6 Clarification over KSPCB NOC not matching with the sanctioned planFile: TCP 6 Clarification mismatch in numbers KSPCB.pdf | 22 Oct 2026 |
| TCP 7 Village Map certified by the concerned AuthorityFile: TCP 7 Village Map certified by the concerned official.pdf | 22 Oct 2026 |
| TCP 9 Clarification over 193 Nos of KSPCBFile: TCP 9 Clarification over 193 numbers of KSPCB.pdf | 22 Oct 2026 |
| TCP 1 Sanctioned Drawings, Floor Plan, Sectional Drawings etc.,File: TCP 1 SANCTIONED PLAN BLOCK G & H.pdf | 1 Oct 2026 |
| TCP 2 PCB not matching with the sanctioned planFile: TCP 2 Clarification mismatch in numbers KSPCB 1.pdf | 1 Oct 2026 |
| TCP 3 Rasons for delay and other issuesFile: TCP 3 Clarification regarding non-involvement - marketing.pdf | 1 Oct 2026 |
| TCP 4 Fire fighting, drinking water etc.,File: TCP 4 Facilities provided for fire fighting.pdf | 1 Oct 2026 |
| TCP 4 Approval Letter for some of the facilities providedFile: TCP 4 APPROVAL LETTER - BLOCK G & BLOCK H.pdf | 1 Oct 2026 |
| TCP 5 Brouchure ClarificationFile: TCP 5 Clarification brochure.pdf | 1 Oct 2026 |
| Er Clear visible approved planFile: Er SANCTIONED PLAN BLOCK G & H.pdf | 1 Oct 2026 |
| Er Structural Stability Certificate with all the necessary particularsFile: Er 5 Structural Stability Certificatr with Er's License.pdf | 1 Oct 2026 |
| Er Form 3 certified by the Engineer along with his licenseFile: Er 6 Form 3 with Engineer's License.pdf | 1 Oct 2026 |
| Er Watere Affidavit with clear commitmentFile: Er 7 Water AFFIDAVIT - STAGE VI.pdf | 1 Oct 2026 |
| Er Land Cost Calculation along with the guidlines value cetrificateFile: Er 8 Land Cost calculation.pdf | 1 Oct 2026 |
| Er Water Source to the project with clear commitmentFile: Er 9 Water Source to the project STAGE VI.pdf | 1 Oct 2026 |
| R 1 ECFile: R 1 EC - Sharadindu - 04 09 026.pdf | 16 Sep 2026 |
| Form 1 CA certificate with all three bank accountsFile: F 1 Form 1 CA - CERTIFICATE.pdf | 16 Sep 2026 |
| Er 1File: Er 1 Clear visible approved plan.pdf | 16 Sep 2026 |
| Er 2File: Er 2 Clarification over the area details as per approved plan.pdf | 16 Sep 2026 |
| Er 3File: Er 3 Clarification over the flat dimension wise details in development details section.pdf | 16 Sep 2026 |
| Er 4File: Er 4 Clarification over the period of 9 years required for completion of the project.pdf | 16 Sep 2026 |
| Er 5File: Er 5 License of Engineer.pdf | 16 Sep 2026 |
| ER 6File: Er 6 Estimation of Construction Cost.pdf | 16 Sep 2026 |
| Er 7File: Er 7 Stability Certificate.pdf | 16 Sep 2026 |
| Er 8File: Er 8 Allotment Letter with clear possesion date.pdf | 16 Sep 2026 |
| Er 9File: Er 9 CHESCOM NOC.pdf | 16 Sep 2026 |
| Er 10File: Er 10 Clarification over water supply NOC pertaining to water supply assurance.pdf | 16 Sep 2026 |
| 1File: 1 Block G - Column & Footing details - II.pdf | 16 Sep 2026 |
| 2File: 2 Block G - Excavation Drawing.pdf | 16 Sep 2026 |
| 3File: 3 Block G - Column & Footing details - I.pdf | 16 Sep 2026 |
| 4File: 4 Block G - Centerline Drawing.pdf | 16 Sep 2026 |
| 5File: 5 Block G - Column & Footing scheduling.pdf | 16 Sep 2026 |
| 6File: 6 Block G - Head room roof beam details.pdf | 16 Sep 2026 |
| 7File: 7 Block G - Typical floor roof beam layout.pdf | 16 Sep 2026 |
| 8File: 8 Block G - Head room roof slab details.pdf | 16 Sep 2026 |
| 9File: 9 Block G - Stairs details.pdf | 16 Sep 2026 |
| 10File: 10 Block G - Plinth details.pdf | 16 Sep 2026 |
| 11File: 11 Block G - Typical floor roof beam details.pdf | 16 Sep 2026 |
| 12File: 12 Block G - Typical floor roof beam layout (1).pdf | 16 Sep 2026 |
| 13File: 13 Block G - Typical lintel details (1).pdf | 16 Sep 2026 |
| 14File: 14 Block G - Typical floor roof slab details.pdf | 16 Sep 2026 |
| TCP 1File: TCP 1 Single Plot Layout - DTCP Letter & Plan.pdf | 16 Sep 2026 |
| TCP 2File: TCP 2 Single Plot Layout - DTCP Letter & Plan.pdf | 16 Sep 2026 |
| TCP 3File: TCP 3 ADLR Sketch.pdf | 16 Sep 2026 |
| TCP 4File: TCP 4 Original sanctioned drawings, floor plan, sectional drawings and elevation.pdf | 16 Sep 2026 |
| TCP 5File: TCP 5 COMMENCEMENT CERTIFICATE - BLOCK G & H.pdf | 16 Sep 2026 |
| TCP 6File: TCP 6 Clarification on Area No of units of KSPCB noc is not matching with sanction plan.pd | 16 Sep 2026 |
| TCP 7File: TCP 7 Demarcation of proposed land in Approved Master plan Certified by the competent auth | 16 Sep 2026 |
| TCP 8File: TCP 8 Village Map.pdf | 16 Sep 2026 |
| TCP 9File: Er 9 CHESCOM NOC.pdf | 16 Sep 2026 |
| TCP 11File: TCP 11 clarification over the reason for delay in registration.pdf | 16 Sep 2026 |
| TCP 12File: TCP 12 clarification over the details of facilities provided.pdf | 16 Sep 2026 |
| TCP 13File: TCP 13 Clarification over the Brochure of the project with amenities details.pdf | 16 Sep 2026 |
| Er 10File: Er 10 WATER APPROVAL LETTER.pdf | 16 Sep 2026 |
| Er 11File: Er 11 STP Drawings.pdf | 16 Sep 2026 |
| Er 12File: Er 12 The Land cost calculation sheet as per the guidance value.pdf | 16 Sep 2026 |
| RTC, survey 45/1 | - |
| Mutation, survey 45/1 | - |
| Encumbrance Certificate, survey 45/1 | - |
| Conversion/Alienation Order, survey 45/1 | - |
| Sale/Title/Gift Deed, survey 45/1 | - |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Sharadindu Stage V | 45/1, 45/3 & 49/3, Ranganakoppalu Village, Kasaba Hobli, Pandavapura Taluk, Mandya District | Ongoing | Jan 2030 | Not due yet |
| Sharadindu Stage IV | 45/1, 45/3 & 49/3, Ranganakoppalu Village, Kasaba Hobli, Pandavapura Taluk, Mandya District | Completed | - | No date filed |
| Sharadindu Stage III | 45/1, 45/3 & 49/3, Ranganakoppalu Village, Kasaba Hobli, Pandavapura Taluk, Mandya District | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mandya
Computed across the 81 Mandya projects on ReraGenie, from their own filings.
Keep Sharadindu Stage VI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mandya81 in Mandya
Sharadindu Stage V
Sree Senior Homes
Zuari Garden city - Kaveri Apartments
ZUARI INFRAWORLD INDIA LIMITED
Zuari Garden City - Brindavan Serenity
ZUARI INFRAWORLD INDIA LIMITED
Construction PKGB 88 DU's
CMC mandya
Sharadindu - State III
Sree Senior Homes
SHARADINDU STAGE IV
SREE SENIOR HOMES
See every Mandya project, with the district possession charts
Builder: Sree Senior Homes
Sree Senior Homes has 4 registrations on RERA Karnataka, including Sharadindu Stage VI and Sharadindu - State III. Its filings declare 4 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Mandya district page.
Frequently asked questions
What are my rights if Sharadindu Stage VI is delayed beyond 31 Dec 2035?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Sharadindu Stage VI?
The registered promoter entity is Sree Senior Homes, a partnership firm as per the filing. Its GSTIN 29ABUFS6817L1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Sharadindu Stage VI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Sharadindu Stage VI?
The professionals named in the filing: Architect: Trupti N Shah; Engineer: Chethan PV; Chartered Accountant: M N Sunil Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sharadindu Stage VI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback