Red flags

  • 3 complaints at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Jan 2023Possession promisedmoved 9 months from the original
3Complaints at RERA Karnatakaon this registration
Jump to the 68 documents Report an error

Sobha Arena - Pebble Court (Block 1) is a Residential/Group Housing project by Sobha Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/180507/001622 on 7 May 2018. Possession is promised by 30 Jan 2023. The completion date has moved by 9 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameSobha Arena - Pebble Court (Block 1)
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/180507/001622
  • ReraGenie IDRG-KA-88121

Builder

  • NameSobha Limited
  • Entity typeCompany
  • CINL45201KA1995PLC018475
  • Authorized SignatoryLt. Gen. Mathew Mammen
  • Other registrations119 more →
  • No longer live8 withdrawn or revoked
  • Declared earlier projects196 →

Key dates

this monthRegisteredMay 2018First promiseApr 2022Revised toJan 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on7 May 2018
  • Promised completion30 Jan 2023
  • Revised completionRevised to 30 Jan 2023 (originally 30 Apr 2022)
  • Buildings2 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 1---68068
Wing 2---68068

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,795 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 135.48 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGeetha K. Nair
EngineerAnilkumar S Hokrani

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionApr 2022 → Jan 2023

No reason recorded in the filing

Complaints filed with RERA Karnataka3

Case no.ComplainantRespondentFiled
CMP/190308/0002322-Sobha Limited (SL)08/03/2019
CMP/191126/0004810-Sobha Limited26/11/2019
CMP/191221/0004974-Sobha Limited21/12/2019

Documents filed68

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/180507/001622 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registration Certificate.pdf-
BDA Approval Letter - Arena-
BDA Approved Plan - Arena-
Layout Plan - Non applicability-
Proforma Sale Deed - Pebble Court-
Proforma ATS - Pebble Court-
Sale Deed and RTC - Sobha Arena-
Blk 1 - Section-min-
BDA Approved Plan - Arena-
Intimation Letter-
PEBBLE COURT - A4 - RERA - FINAL-
Sobha Arena Specifications PEBBLE COURT-
EC Compiled - Sobha Arena-
Khatha and RTC-
JD Agreement-
Sale Deed and RTC-
Conversion Orders All Survey No's-
Arena Reliquishment Deed-
Fire NOC-
HAL NOC-
BESCOM NOC-
BWSSB NOC-
KSPCB NOC-
SEIAA - Compressed-
Telecom NOC-
Unnamed document-
Not Appl - Inspector of Factories-
Engineer Certificate-
Section and Floor Plans-
Layout Plan - Non applicability-
Section and Specs-
Advocate Search Report - Compressed 1-
Balance Sheet 2016 - 2017File: Balance Sheet - Mar 2015.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet - Mar 2016.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet - Mar 2017.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Profit Loss Statement - Mar 2015.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit Loss Statement - Mar 2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit Loss Statement - Mar 2017.pdf-
Director's Report 2016 - 2017File: DR_2014-15.pdf-
Director's Report 2015 - 2016File: DR_2015-16.pdf-
Director's Report 2014 - 2015File: DR_2016-17.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow - Mar 2015.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow - Mar 2016.pdf-
Auditor's Report 2016 - 2017File: Auditors Report - Mar 2015.pdf-
Auditor's Report 2015 - 2016File: Auditors Report - Mar 2016.pdf-
Auditor's Report 2014 - 2015File: Auditors Report - Mar 2017.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 2014-15.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 2015-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR 2016-17.pdf-
Arena - Pebble Court - Form B-
Prospectus/BrochureFile: PEBBLE COURT - A4 - RERA - FINAL-min.pdf-
Advertisement Copy 1File: NA - Advertisements.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_180507_001622.xlsx-
Loan raised documentFile: NOC Arena.pdf-
Stability CertificateFile: SSC Arena PC.pdf-
Road cutting permission letter issued by the planning Authority for laying Water supply line, sanitary line, UFile: Arena BBMP Road cutting.pdf-
NOC issued by the Fire Force department after completion of workFile: Fire NOC Arena 010122020 c.pdf-
Occupancy CertificateFile: Pebble Court OC.pdf-
Consent for operation issued by KSPCBFile: KSPCB CFO Blk 1 and 4.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Lift Licence Arena Block 1 3 and 4.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM NOC Arena.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB NOC Arena.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: Architect certificate Arena PC.pdf-
Common Area and other amenities facilities are completed or not and details of handling over of the same to asFile: Arena DOD Final.pdf-
Details of undivided share of land handed over to the association of allotteesFile: UDS Arena pebble court.pdf-
Architect certificate for having completed the work(in format no 5)File: Architect certificate Arena PC.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: FORM 4 CC Arena Pebble Court c.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit Arena Pebble Court.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Sobha Arena - Pebble Court (Block 1) on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSobha Arena - Pebble CouOther 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 40 registered projects within 2 km.

Builder: Sobha Limited

SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Sobha Arena - Pebble Court (Block 1) is delayed beyond 30 Jan 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sobha Arena - Pebble Court (Block 1)?

The registered promoter entity is Sobha Limited, a company as per the filing. Its CIN L45201KA1995PLC018475 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sobha Arena - Pebble Court (Block 1)?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sobha Arena - Pebble Court (Block 1)?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Sobha Arena - Pebble Court (Block 1)?

The professionals named in the filing: Architect: Geetha K. Nair; Engineer: Anilkumar S Hokrani. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sobha Arena - Pebble Court (Block 1)?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sobha Arena - Pebble Court (Block 1). Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sobha Arena - Pebble Court (Block 1) to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.