Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
May 2031Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 70%
175 of 207Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 137 documents Report an error

SOBHA ALTAIR is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/070126/008388 on 7 Jan 2026. Possession is promised by 31 May 2031. 32 of the 207 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameSOBHA ALTAIR
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560035
  • Pincode560035
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/070126/008388
  • ReraGenie IDRG-KA-48245

Builder

  • NameSOBHA LIMITED
  • Entity typeCompany
  • CINL45201KA1995PLC018475
  • GSTIN29AABCS7723E1ZB
  • Authorized SignatoryPAVITHRA G KALMAT
  • Managing DirectorMr Jagadish Nangineni
  • DirectorMr Jagadish Nangineni
  • Project HeadMr.Ravikumar
  • Other registrations119 more →
  • No longer live8 withdrawn or revoked
  • Declared earlier projects196 →

Key dates

this monthRegisteredJan 2026PromisedMay 2031

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on7 Jan 2026
  • Promised completion31 May 2031
  • Revised completionNone
  • Buildings3 building records
  • Documents filed137 files

Current status

15%32 of 207 units booked
4.7%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 01---75075
Wing 02---75075
Wing 04---57057

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 70%.

Building: 5% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work70%
Foundation footing work25%
Upto Plinth Level0%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)0%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksNoNot applicable
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,658 sq m
Named landowners1
LandownerVillageDistrict
Kumudha Kumar Babu--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 332.10 cr
Cost incurredRs 15.58 cr
Spent of the estimate4.69%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 253.22 crRs 12.87 cr
Payment of taxesRs 40.18 crRs 24.48 lakh
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 25.00 cr-
On-site expenditure-Consultants FeesRs 13.70 cr-
On-site expenditure-Site Overhead-Rs 67.43 lakh
Principal sum and interest payable to financial institutions-Scheduled Banks-Rs 1.79 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGeetha K Nair
EngineerMr. Srinivas Sathyanarayan
Chartered AccountantBalaji D

Litigation declared1

CaseCourtStatus
27293/2025/2025WP No27293/2025 filed by Smt Kumudha Kumara Babu against State of Karnataka & others inst Respondents not to disturb the possession of the Petitioner vide Order-

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed137

As listed on the registration, under the names the promoter filed them with; the newest 80 of 137 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/070126/008388 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Altair C.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Altair.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Altair.pdf14 Oct 2026
Q2 2026-27 Water supply and sewage board14 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Oct 2026
Q2 2026-27 KPTCL- BESCOM14 Oct 2026
Q2 2026-27 Fire and Safety14 Oct 2026
Q2 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: WP No27293 2025.pdf14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Altair.pdf13 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Altair.pdf13 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Altair.pdf13 Jul 2026
Q1 2026-27 Water supply and sewage board13 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)13 Jul 2026
Q1 2026-27 KPTCL- BESCOM13 Jul 2026
Q1 2026-27 Fire and Safety13 Jul 2026
Q1 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: WP No27293 2025.pdf13 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Altair.pdf13 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Altair.pdf13 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Altair.pdf13 Apr 2026
Q4 2025-26 Water supply and sewage board13 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)13 Apr 2026
Q4 2025-26 KPTCL- BESCOM13 Apr 2026
Q4 2025-26 Fire and Safety13 Apr 2026
Sobha Altair BP Page 1File: Sobha Altair BP Page 1.pdf7 Jan 2026
Sobha Altair BP Page 2File: Sobha Altair BP Page 2.pdf7 Jan 2026
Sobha Altair BP Page 3File: Sobha Altair BP Page 3.pdf7 Jan 2026
Sobha Altair BP Page 4File: Sobha Altair BP Page 4.pdf7 Jan 2026
Sobha Altair BP Page 5File: Sobha Altair BP Page 5.pdf7 Jan 2026
Sobha Altair BP Page 6File: Sobha Altair BP Page 6.pdf7 Jan 2026
Sobha Altair BP Page 7File: Sobha Altair BP Page 7.pdf7 Jan 2026
Sobha Altair BP Page 8File: Sobha Altair BP Page 8.pdf7 Jan 2026
Sobha Altair BP Page 9File: Sobha Altair BP Page 9.pdf7 Jan 2026
Sobha Altair BP Page 10File: Sobha Altair BP Page 10.pdf7 Jan 2026
Sobha Altair BP Page 11File: Sobha Altair BP Page 11.pdf7 Jan 2026
Sobha Altair BP Page 12File: Sobha Altair BP Page 12.pdf7 Jan 2026
Sobha Altair BP Page 13File: Sobha Altair BP Page 13.pdf7 Jan 2026
Sobha Altair BP Page 14File: Sobha Altair BP Page 14.pdf7 Jan 2026
Sobha Altair BP Page 15File: Sobha Altair BP Page 15.pdf7 Jan 2026
Sobha Altair BP Page 16File: Sobha Altair BP Page 16.pdf7 Jan 2026
Building LicenseFile: Building License.pdf7 Jan 2026
Clarification on Commencement CertificateFile: 1 Clarification on Commencement Certificate.pdf7 Jan 2026
Engineer License-BalakrishnanFile: 2 Engineer License-Balakrishnan.pdf7 Jan 2026
Stability Certificate SignedFile: 4 Stability Certificate Signed.pdf7 Jan 2026
STP & SUTP Layout planFile: 5 STP & SUTP Layout plan.pdf7 Jan 2026
Project construction cost breakupFile: 7 Project construction cost breakup.pdf7 Jan 2026
SOBHA Altair Brochure UpdatedFile: 6 SOBHA Altair Brochure Updated.pdf7 Jan 2026
Land cost calculation sheetFile: 8 Land cost calculation sheet.pdf7 Jan 2026
Form-B AffidavitFile: 9 Form-B Affidavit.pdf7 Jan 2026
Declaration AffidavitFile: 10 Declaration Affidavit.pdf7 Jan 2026
Litigation AffidavitFile: 11 Litigation Affidavit.pdf7 Jan 2026
Proforma of ATS Draft Sobha Altair UpdatedFile: 12 Proforma of ATS Draft Sobha Altair Updated.pdf7 Jan 2026
STP Technical ReportsFile: 13 STP Technical Reports.pdf7 Jan 2026
Form-2 Arc Cert-AltairFile: 14 Form-2 Arc Cert-Altair.pdf7 Jan 2026
Form-3 Eng Cert-AltairFile: 15 Form-3 Eng Cert-Altair.pdf7 Jan 2026
RTC, survey 56-
Mutation, survey 56-
Encumbrance Certificate, survey 56-
Conversion/Alienation Order, survey 56-
Sale/Title/Gift Deed, survey 56-
JDA, survey 56-
Khatha, survey 56-
Registration CertificateFile: Registration Certificate of SL.pdf-
Memorandum of AssociationFile: MOA SL.pdf-
Article of AssociationFile: AOA SL c.pdf-
GST CertificateFile: GST Certificate self attested.pdf-
Organization StructureFile: Organisation Structure.pdf-
Certificate issued by CA Form 1File: Form 1 CA Altair.pdf-
Certificate issued by Architect Form 2File: 14 Form-2 Arc Cert-Altair R1.pdf-
Certificate issued by Engineer Form 3File: 15 Form-3 Eng Cert-Altair.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
Land Litigation Details-
Land Litigation Details-
Balance Sheet 2024 - 2025File: Financials FY 2024-25.pdf-
Balance Sheet 2023 - 2024File: Balance Sheet Mar 2024.pdf-
Balance Sheet 2022 - 2023File: Balance sheet Mar 2023.pdf-
Audited Profit and Loss Statement 2024 - 2025File: Financials FY 2024-25.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Profit Loss Statement Mar 2024.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Profit Loss Statement Mar 2023.pdf-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 not delivered by the promised date40 under way, not due yet
ProjectLocationStatusPromisedDelivered
SOBHA Crystal Meadows Phase 5 Wing 16 to 22SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingDec 2035Not due yet
SOBHA Crystal Meadows Phase 4 Wing 23 to 28SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingDec 2033Not due yet
Sobha Hamptons -Townpark Phase 2 W1 to 3PROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKAOngoingJun 2033Not due yet
Sobha Madison Heights-Townpark Phase 2 W1 to 4PROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKAOngoingDec 2032Not due yet
SOBHA Crystal Meadows Phase 3 Wing 9 to 15SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingDec 2032Not due yet
Sobha Neopolis Phase 5 - W 5, 6 & 7"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2031Not due yet
Sobha Neopolis Phase 4 - 3, 4, 8 & 9"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2031Not due yet
SOBHA Ayana at Dream Acres Wing 60 to 71Sy No 50/2, 50/4, 50/5, 50/6, 51/1,51/2B1, 51/2B2, 51/3,51/4, 51/2C1,51/2C2, 53/1 and 53/2 of BalagereVillage , Ward No 149 , Varthur Hobli ,Bengaluru East , Bengaluru Urban,Karnataka - 560087OngoingDec 2031Not due yet
Sobha Hamptons -Townpark Phase 1 W4 to 6PROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKAOngoingJun 2031Not due yet
SOBHA Crystal Meadows Phase 2 Wing 7 and 8SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingJun 2031Not due yet
Sobha Neopolis Phase 2 - W 12 & 13"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2030Not due yet
Sobha Madison Heights-Townpark Phase 1 W5 to 7PROPOSED APARTMENT BUILDING ON SURVEY NO:- 52/5,56/3,56/4,56/5(P),56/6 56/7, 58/1(P), 59/1,59/2, 60/1,73/1(P),73/2(P),73/3(P),74/6(P),74/7(P),74/8(P),74/11(P) AT YADAVANAHALLI VILLAGE, ATTIBELE HOBLI, ANEKALTALUK,BANGALORE, KARNATAKAOngoingDec 2030Not due yet
Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2Survey nos 10,55, 7/2, 8/2, 9/10, 9/11,9/12, 9/13, 9/14, 9/15, 9/16 , NEARAYAPPASWAMY TEMPLE, AGARAVILLAGE , BENGALURU , Bengaluru East, Bengaluru Urban, Karnataka - 560034OngoingDec 2030Not due yet
Sobha Infinia Phase 2A Block 5 Wing 5Survey nos 10,55, 7/2, 8/2, 9/10, 9/11,9/12, 9/13, 9/14, 9/15, 9/16 , NEARAYAPPASWAMY TEMPLE, AGARAVILLAGE , BENGALURU , Bengaluru East, Bengaluru Urban, Karnataka - 560034OngoingJun 2030Not due yet
Sobha Magnus"E-KATHA NO.7863600645, SY.NO. 87/2, 87/3 SITUATED AT KOTHANUR VILLAGE , UTTARAHALLI HOBLI , Bengaluru South , Bengaluru Urban, Karnataka "OngoingMay 2030Not due yet
Sobha Neopolis Phase 3 - W 1, 2, 10 & 11"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2029Not due yet
SOBHA Crystal Meadows Phase 1 Wing 1 to 6SURVEY NOS 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) SITUATED AT MULLUR VILLAGE, BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 571442OngoingDec 2029Not due yet
Sobha Brooklyn Towers - Town Park Phase 4, W4Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2029Not due yet
Sobha Brooklyn Towers - Town Park Phase 3, W5Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2029Not due yet
Sobha Royal crest"PROPOSED RESIENTIAL APARMENT @ BBMP Katha no. 989/38/2, 38/4, 80/3, 37/1, 38/3, 80/2, 38/1, 35/3, 35/4, 37/2 , 38/5, 79, 80/1 @ HOSAKARAHALLI VILLAGE, UTTARAHALLI HOBLI, NEAR P.E.S COLLEGE,BANGALORE SOUTH TALUK., WARD NO 160, RAJARAJESHWARINAGAR ZONE"OngoingDec 2028Not due yet
Sobha Neopolis Phase 1 - W 14, 15, 16, 17, 18&19"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2028Not due yet
Sobha Dream Gardens Phase 5 - Wing 10Survey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2028Not due yet
Sobha Dream Gardens Phase 4 - Wing 1 and 2Survey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2028Not due yet
Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingSep 2028Not due yet
Sobha Brooklyn Towers - Town Park Phase 5, W3Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2028Not due yet
Sobha Windsor Phase 4 Wing 9, 10 and 11Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingMar 2028Not due yet
Sobha Victoria park phase 2"PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE "OngoingDec 2027Not due yet
Sobha Victoria park phase 1"PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE "OngoingDec 2027Not due yet
Sobha Sentosa Phase 4 Wing 1 and 2"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingDec 2027Not due yet
Sobha Oakshire Phase 3 Wing 5,6,11 and 12Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110OngoingDec 2027Not due yet
Sobha Dream Gardens Phase 3 - Wing 3 and 4Survey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2027Not due yet
Sobha Brooklyn Towers - Town Park Phase 2, W2Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingDec 2027Not due yet
Sobha Brooklyn Towers - Town Park Phase 1, W1Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingDec 2027Not due yet
Sobha Windsor Phase 3 Wing 6, 7 and 8Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingSep 2027Not due yet
Sobha City AthenaProperty No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, BengaluruOngoingSep 2027Not due yet
Sobha Sentosa Phase 3 Wing 3 and 4"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingJun 2027Not due yet
Sobha Oakshire Phase 2 Wing 3,4,9 and 10Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110OngoingJun 2027Not due yet
Sobha Oakshire Phase 1 Wing 1,2,7 and 8Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110OngoingDec 2026Not due yet
Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingDec 2026Not due yet
Sobha Galera"SOBHA GALERA, SURVEY NO 45/4 OF HUSKUR VILLAGE, BIDARAHALLI HOBLI, BANGLAORE EAST TALUK SURVEY NO.116 OF AMANIDODDAKERE VILLAGE, KASABA HOBLI, HOSAKOTE TALUK, BANGALORE , BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 560049"OngoingDec 2026Not due yet

How this compares with Bengaluru Urban

15%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SOBHA ALTAIR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSOBHA ALTAIROther 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: SOBHA LIMITED

SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SOBHA ALTAIR is delayed beyond 31 May 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SOBHA ALTAIR?

The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SOBHA ALTAIR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SOBHA ALTAIR?

The professionals named in the filing: Architect: Geetha K Nair; Engineer: Mr. Srinivas Sathyanarayan; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOBHA ALTAIR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOBHA ALTAIR. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOBHA ALTAIR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.