Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2020Possession promisedmoved 6 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 52 documents Report an error

SNR Wind Mill is a Residential/Group Housing project by SNR Square Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/180420/001530 on 20 Apr 2018. Possession is promised by 1 Mar 2020. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameSNR Wind Mill
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/180420/001530
  • ReraGenie IDRG-KA-56829

Builder

  • NameSNR Square Pvt Ltd
  • Entity typeCompany
  • CINU45201KA2014PTC074103
  • Authorized SignatoryRajdeep Dey
  • Other registrations4 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2018First promiseSep 2019Revised toMar 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Apr 2018
  • Promised completion1 Mar 2020
  • Revised completionRevised to 1 Mar 2020 (originally 6 Sep 2019)
  • Buildings1 building record
  • Documents filed52 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
snr windmill---50050

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 7 Oct 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 7 Oct 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,417 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 7.50 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/201021/001530Sep 2019 → Mar 2020

Reason as filed by the promoterCompany in Loss

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed52

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/180420/001530 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CONSENT LETTERFile: CONSENT LETTER .pdf7 Oct 2020
AFFIDAVIT CUM DECLARATIONFile: form b new oct 2020.pdf7 Oct 2020
CA CERTIFICATEFile: CA certificate - fund utilized udin.pdf7 Oct 2020
CA CERTIFICATEFile: CA certificate - funds required udin.pdf7 Oct 2020
BANK STATEMENTFile: 089610520.pdf7 Oct 2020
CertificateFile: Certificate of incorporation.jpg-
Architect Certificate for Work Completion Schedule till DateFile: Arc certificate - work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg certificate - work completed.pdf-
CA Certificate for Funds UtilizationFile: CA certificate - fund utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arc certificate - work pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg certificate - work pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA certificate - funds required.pdf-
AffidavitFile: Affidavit for extension .pdf-
Latest Encumbrance CertificateFile: ec windmill april 17 to 30-05-2018 (1).pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: CONSENT LETTER .pdf-
CC-
SNR Wind mill plan-Uploaded-
Sale Deed-
SNR Wind mill plan-Uploaded-
SNR Wind mill plan-Uploaded-
SNR Wind mill brouchure-Uploaded-
SNR Wind mill specification- Uploaded-
EC - SNR Wind Mill-
Khatha (Wind Mill)(1)-
JDA (Wind Mill)-
Conversion certificate (Wind Mill)(1)-
SNR Wind mill plan-
Balance Sheet 2016 - 2017File: Balance Sheet.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet.jpg-
Audited Profit and Loss Statement 2016 - 2017File: P and L.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P and L.jpg-
Director's Report 2016 - 2017File: Director's Report.pdf-
Director's Report 2015 - 2016File: Director Report.jpg-
Cash Flow Statement 2016 - 2017File: Cash Flow.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow.jpg-
Auditor's Report 2016 - 2017File: Auditor Report.pdf-
Auditor's Report 2015 - 2016File: Auditor Report.jpg-
Income Tax Return Acknowledgement 2016 - 2017File: IT Ack.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: IT Ack.jpg-
Form B-
Prospectus/BrochureFile: SNR-WINDMILL BROCHURE (1) (2).pdf-
Advertisement Copy 1File: SNR-WINDMILL BROCHURE (1) (2).pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_180420_001530.xlsx-
NOC issued by the Fire Force department after completion of workFile: WM Fire & Emergency services.pdf-
Consent for operation issued by KSPCBFile: CFO - KSPCB - SNR WINDMILL.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM.jpeg-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: STP Completation Certificate & Flow Chart-SNR-Windmills40KLD.pdf-
Architect certificate for having completed the work(in format no 5)File: S0T1000055_2211101827003 cCC 6.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: S0T1000055_2211101827001 CC 4.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: SNR WM AFFIDAVIT.pdf-
ENGG CCFile: S0T1000055_2211101827002.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 6 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SNR Wind Mill on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SNR Square Pvt Ltd

SNR SQUARE PVT LTD has 5 registrations on RERA Karnataka, including SNR SAFA and SNR Verity. Its filings declare 3 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SNR Wind Mill is delayed beyond 1 Mar 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SNR Wind Mill?

The registered promoter entity is SNR Square Pvt Ltd, a company as per the filing. Its CIN U45201KA2014PTC074103 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SNR Wind Mill?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in SNR Wind Mill?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SNR Wind Mill. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SNR Wind Mill to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.