RG-KA-92578 · RERA PRM/KA/RERA/1251/310/PR/170918/000681 · Last updated on RERA Karnataka portal: 11 Apr 2023

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 45 months
  • 3 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2025Possession promisedmoved 45 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 136 documents Report an error

SNN Raj Grandeur is a Residential/Group Housing project by SNN Builders Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/170918/000681 on 18 Sep 2017. Possession is promised by 30 Sep 2025. The completion date has moved by 45 months from the original filing.

At a glance

Project

  • NameSNN Raj Grandeur
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/170918/000681
  • ReraGenie IDRG-KA-92578

Builder

  • NameSNN Builders Pvt Ltd
  • Entity typeCompany
  • Authorized SignatoryShivashankar Bhat P
  • Declared earlier projects7 →

Key dates

this monthRegisteredSep 2017First promiseDec 2021Revised toSep 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Sep 2017
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 31 Dec 2021)
  • Buildings7 building records
  • Documents filed136 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---42042
B---56056
C---55055
D---55055
E---56056
F---56056
G---52052

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 11 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 11 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area18,210 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 159.00 cr

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2021 → not stated

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/230112/000681not stated → Sep 2023

Reason as filed by the promoterAwaiting OC

ExtensionSep 2023 → Sep 2025

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed136

As listed on the registration, under the names the promoter filed them with; the newest 80 of 136 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/170918/000681 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Consent LettersFile: Consent Letters.pdf11 Apr 2023
RERA Consent Letter ClarificationFile: RERA Consent Letter.pdf11 Apr 2023
Request Letter to BBMP to Issue OCFile: Request Letter to BBMP to Issue OC.pdf11 Apr 2023
Request Letter to Town Planning to Issue OCFile: Request Letter to Town Planning to Issue OC.pdf11 Apr 2023
BESCOM NOCFile: BWSSB NOC.pdf11 Apr 2023
BWSSB NOCFile: BWSSB NOC.pdf11 Apr 2023
Airport Authority NOCFile: Airport Authority NOC.pdf11 Apr 2023
CertificateFile: Grandeur 1.pdf-
Project Details-
Modified plan details site plan, floor plans, Plan Licence LetterFile: MODIFIED BUILDING LICENSE.pdf-
Elevation, Sections, Specifications ( If changes are there )File: ELEVATION SECTION PLAN.PDF-
List Of AllotteesFile: SoldUnsoldDetails.xlsx-
Consent LetterFile: CONSENT FORM.pdf-
Chartered Accountant CertificateFile: Form-4 RERA SNN Granduer Modification report FY 2021-22.pdf-
Notarized AffidavitFile: Modification Affidavit.pdf-
Engineer CertificateFile: form-6 Engineer certificate.pdf-
Architect CertificateFile: form-5 for SNN Raj Grandeur project for Modified plan.pdf-
Structural Engineer Certificate for stability of structureFile: Structural certificate 15 Dec 2022.pdf-
Modification of Plan DetailsFile: Grandeur 24.pdf-
Modification of Plan DetailsFile: MODIFIED PLAN ALL PAGES.pdf-
Modification of Plan DetailsFile: Commencement certficate of Raj Granduer.pdf-
Modification of Plan DetailsFile: Commencement certficate of Raj Granduer.pdf-
Modification of Plan DetailsFile: SoldUnsoldDetails.xlsx-
Modification of Plan DetailsFile: SoldUnsoldDetails.xlsx-
Document 1File: KSPCB NOC Fee paid receipt.pdf-
Document 2File: FIRE NOC.pdf-
Document 3File: BESCOM NOC.pdf-
Document 4File: BWSSB NOC.pdf-
Document 5File: Airport Authority NOC.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect Completed Work.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate Completed As on date.pdf-
CA Certificate for Funds UtilizationFile: CA Certificate Funds Utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Pending work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer Certificate work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate Funds Required.pdf-
AffidavitFile: Affidavit Ex7.pdf-
Latest Encumbrance CertificateFile: EC APR 2018-JUN 2020.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails - Revised.xlsx-
NOC DetailsFile: KSPCB NOC.pdf-
Document 1File: FIRE NOC.pdf-
Document 2File: BESCOM NOC.pdf-
Document 3File: BWSSB NOC.pdf-
Document 4File: Airport Authority NOC.pdf-
Document 5File: SLEIAA NOC.pdf-
Document 6File: OC ACK.pdf-
Document 7File: Form B Affidavit.pdf-
Document 8File: Extension Hearing Response - Revised.xlsx-
Document 9File: Request Letter to BBMP to Issue OC.pdf-
Document 10File: Request Letter to Town Planning to Issue OC.pdf-
Grandeur 23-
Grandeur 25-
GRANDEUR-37-PROFORMA-SALE DEED DRAFT-
GRANDEUR-26-PROFORMA-AGREEMENT FOR SALE-
Grandeur 29-
Grandeur 28-
Grandeur 31-
Grandeur 32-
Grandeur 33-
Grandeur 34-
Grandeur 35-
Grandeur 22-
KAHATHA-
JDA-
CONVERSION ORDER-
FIRE NOC-
AIRPORT AUTHORITY-
BESCOM-
BWSSB NOC-
KSPCB-CFE-
SEIAA NOC-
Unnamed document-
STR STABILITY CERTIFICATE - GRANDEUR-
SECTION & ELEVETION PLAN-
Balance Sheet 2015 - 2016File: Grandeur 3.pdf-
Balance Sheet 2014 - 2015File: Grandeur 4.pdf-
Balance Sheet 2013 - 2014File: Grandeur 5.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Grandeur 6.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Grandeur 7.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Grandeur 8.pdf-
Director's Report 2015 - 2016File: Grandeur 9.pdf-

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 not delivered by the promised date3 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
SNN Clermont-OngoingOct 2020Not delivered
SNN Raj Etternia-OngoingOct 2019Not delivered
SNN Raj Greenbay-OngoingSep 2019Not delivered
SNN Raj Spiritua-OngoingJul 2018Not delivered
SNN Raj Serenity-Completed-No date filed
SNN Raj Neeladri-Completed-No date filed
SNN Raj Lakeview - Phase 2-Completed-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 45 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SNN Raj Grandeur on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSNN Raj GrandeurOther 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: SNN Builders Pvt Ltd

SNN Builders Pvt Ltd has 1 registration on RERA Karnataka, including SNN Raj Grandeur. Its filings declare 7 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SNN Raj Grandeur is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SNN Raj Grandeur?

The registered promoter entity is SNN Builders Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SNN Raj Grandeur?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in SNN Raj Grandeur?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SNN Raj Grandeur. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SNN Raj Grandeur to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.