ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / SLV SIRI PARADISE

Registration approved No litigation declared Residential/Group Housing project

SLV SIRI PARADISE

By S L V BUILDERS

RG-KA-13752 · RERA PRM/KA/RERA/1251/308/PR/180326/008538 · Last updated on RERA Karnataka portal: 16 Mar 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 69 documents Report an error

SLV SIRI PARADISE is a Residential/Group Housing project by S L V BUILDERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180326/008538 on 18 Mar 2026. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameSLV SIRI PARADISE
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/308/PR/180326/008538
  • ReraGenie IDRG-KA-13752

Builder

  • NameS L V BUILDERS
  • Entity typePartnership Firm
  • GSTIN29AFCFS4729R1Z3
  • Authorized SignatoryC. HARIBABU

Key dates

this monthRegisteredMar 2026PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Mar 2026
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK - A---64064
BLOCK - B---64064

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 16 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities41

As on 16 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable
Stilt FloorYes-

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
T. Y. Sathish Prem Kumar--
T. Y. Mahesh Kumar--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 52.50 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 45.13 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 2.50 cr-
Payment of taxesRs 1.85 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 1.45 cr-
On-site expenditure-Site OverheadRs 50.00 lakh-
Payment of cessRs 45.00 lakh-
On-site expenditure-Salaries of workersRs 37.74 lakh-
On-site expenditure-Consultants FeesRs 25.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhamumathy G
EngineerArun Kumar S R
Chartered AccountantM. Prasad

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed69

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180326/008538 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2File: Form 2 ARC REG.pdf16 Mar 2026
Form 3File: Form 3 ENG REG.pdf16 Mar 2026
Gift DeedFile: Gift Deed.pdf16 Mar 2026
Building LicenseFile: Building License.pdf16 Mar 2026
Original Approved PlanFile: Original Approved Plan.pdf16 Mar 2026
Commencement CertificateFile: Commencement Certificate.pdf16 Mar 2026
KSPCB NOCFile: CFE KSPCB.pdf16 Mar 2026
Change of Land UseFile: Change of Land.pdf16 Mar 2026
Land Calc sheet_Guidance ValueFile: Land Calc Sheet.pdf16 Mar 2026
Project Amenities DetailsFile: Amenities Details.pdf16 Mar 2026
Form 6 - Eng CertificateFile: Form 6 Eng Certificate.pdf16 Mar 2026
Construction Estimation SheetFile: Contruction Estimation Signed by Eng.pdf16 Mar 2026
Structural Stability CertificateFile: Structural Stability Certificate.pdf16 Mar 2026
Reason for Delay in RegistrationFile: Reason for Delay in REG.pdf16 Mar 2026
RTC, survey 116/1-
Mutation, survey 116/1-
Encumbrance Certificate, survey 116/1-
Conversion/Alienation Order, survey 116/1-
JDA, survey 116/1-
Khatha, survey 116/1-
Registration CertificateFile: Form C.pdf-
GST CertificateFile: GST CERTIFICATE.pdf-
Partnership DeedFile: Partnership Deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 Reg - CA.pdf-
Certificate issued by Architect Form 2File: Form 2 ARC REG.pdf-
Certificate issued by Engineer Form 3File: Form 3 ENG REG.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit for Non Litigation.pdf-
Balance Sheet 2024 - 2025File: Balance Sheet.pdf-
Audited Profit and Loss Statement 2024 - 2025File: P&L.pdf-
Commencement Certificate-
Approved Sanction Plan-
Approved Sanction Plan-
Structural Stability Certificate-
Project Specs-
Proforma Agreement for Sale-
Proforma Allotment Letter-
FORM B-
Affidavit for Violation-
Advocate Search Report-
BESCOM NOC-
Water NOC-
KSPCB NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
CDP Plan-
ADLR Certified Survey Sketch-
Construction Estimated Sheet-
Single Plot-
Single Plot Order-
Building Construction License-
STP Drawing-
Village MAP-
Gift Deed-
Sharing Agreement-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SLV SIRI PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: S L V BUILDERS

S L V BUILDERS has 1 registration on RERA Karnataka, including SLV SIRI PARADISE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SLV SIRI PARADISE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SLV SIRI PARADISE?

The registered promoter entity is S L V BUILDERS, a partnership firm as per the filing. Its GSTIN 29AFCFS4729R1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SLV SIRI PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SLV SIRI PARADISE?

The professionals named in the filing: Architect: Bhamumathy G; Engineer: Arun Kumar S R; Chartered Accountant: M. Prasad. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SLV SIRI PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SLV SIRI PARADISE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SLV SIRI PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.