Home / Browse projects / Bengaluru Urban, Karnataka / SLV ROYAL TRANQUIL

Registration approved Residential/Group Housing project

SLV ROYAL TRANQUIL

By A D MANJHUNATH

RG-KA-19534 · RERA PRM/KA/RERA/1251/310/PR/200811/003530 · Last updated on RERA Karnataka portal: 8 Aug 2020

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2023Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 78 documents Report an error

SLV ROYAL TRANQUIL is a Residential/Group Housing project by A D MANJHUNATH in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/200811/003530 on 11 Aug 2020. Possession is promised by 30 Sep 2023. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameSLV ROYAL TRANQUIL
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/200811/003530
  • ReraGenie IDRG-KA-19534

Builder

  • NameA D MANJHUNATH
  • Entity typeProprietorship Firm
  • Authorized SignatoryA D MANJHUNATH

Key dates

this monthRegisteredAug 2020First promiseDec 2022Revised toSep 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 Aug 2020
  • Promised completion30 Sep 2023
  • Revised completionRevised to 30 Sep 2023 (originally 31 Dec 2022)
  • Buildings1 building record
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SLV ROYAL TRANQUIL---40040

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 8 Aug 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 8 Aug 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area751 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.20 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHINNA MOHAN
EngineerAITHA VISHWESHWAR

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/230419/003530Dec 2022 → Sep 2023

Reason as filed by the promoterForce Majeure

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed78

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/200811/003530 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Sanction planFile: SCANNED SANCTION PLAN.pdf8 Aug 2020
Bank Account reflecting project nameFile: RERA BANK ACCOUNT.pdf27 Jul 2020
Sanction planFile: SANCTION PLAN.pdf27 Jul 2020
BWSSB NOCFile: BWSSB-NOC.pdf13 Jul 2020
BESCOM NOCFile: BESCOM-NOC.pdf13 Jul 2020
AUDITED STATEMENT OF ACCOUNT 2017-18File: Statement of Income 2017-18.pdf13 Jul 2020
AUDITED STATEMENT OF ACCOUNT 2018-19File: Statement of Income 2018-19.pdf13 Jul 2020
AUDITED STATEMENT OF ACCOUNT 2019-20File: Statement of Income 2019-20.pdf13 Jul 2020
Plan License LetterFile: SANCTION LETTER.pdf1 Jul 2020
EncumbranceFile: LATEST EC.pdf1 Jul 2020
JDA AffidavitFile: JDA AFFIDAVIT.pdf1 Jul 2020
CertificateFile: GST REGISTRATION CERTIFICATE.pdf-
Architect Certificate for Work Completion Schedule till DateFile: ARCHITECT WORK COMPLETED.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: ENGINEER WORK COMPLETED.pdf-
CA Certificate for Funds UtilizationFile: AUDITOR FUND UTILIZED.pdf-
Architect Certificate for Pending Work Completion Schedule.File: ARCHITECT WORK PENDING.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: ENGINEER WORK PENDING.pdf-
CA Certificate for Funds required for Project CompletionFile: AUDITOR FUND REQUIRED.pdf-
AffidavitFile: EXTENSION AFFIDAVIT.pdf-
Latest Encumbrance CertificateFile: LATEST EC.pdf-
Consent letter from 2/3rd of AllotteesFile: Noc.jpg-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (1).xlsx-
Document 1File: BESCOM-NOC.pdf-
Document 2File: BWSSB-NOC.pdf-
SANCTION PLAN-
SALE DEED-
SALE AGREEMENT-
JUDGEMENT COPY-
ALLOTMENT LETTER-
SPECIFICATION-
ENCUMBRANCE-
AFFIDAVIT-
JD AFFIDAVIT-
KHATHA-
JDA-
Unnamed document-
CONVERSION_compressed (2)-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Balance Sheet 2018 - 2019File: BALANCE SHEET.pdf-
Balance Sheet 2017 - 2018File: BALANCE SHEET.pdf-
Balance Sheet 2016 - 2017File: BALANCE SHEET.pdf-
Audited Profit and Loss Statement 2018 - 2019File: PLD.pdf-
Audited Profit and Loss Statement 2017 - 2018File: PLD.pdf-
Audited Profit and Loss Statement 2016 - 2017File: PLD.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ACKNOWLEDEMENT.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ACKNOWLEDGMENT.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ACKNOWLEDGEMENT IT 2017-18.pdf-
FORM-B-
Prospectus/BrochureFile: SP Brochure Finalised.pdf-
Advertisement Copy 1File: SP Brochure Finalised.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_200811_003530.xlsx-
Occupancy CertificateFile: OC BBMP (1).pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB-NOC.pdf-
Architect certificate for having completed the work(in format no 5)File: ARCHITECT.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: AUDITOR.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: ENGINEER.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SLV ROYAL TRANQUIL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSLV ROYAL TRANQUILOther 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: A D MANJHUNATH

A D MANJHUNATH has 1 registration on RERA Karnataka, including SLV ROYAL TRANQUIL. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SLV ROYAL TRANQUIL is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SLV ROYAL TRANQUIL?

The registered promoter entity is A D MANJHUNATH, a proprietorship firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SLV ROYAL TRANQUIL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SLV ROYAL TRANQUIL?

The professionals named in the filing: Architect: CHINNA MOHAN; Engineer: AITHA VISHWESHWAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SLV ROYAL TRANQUIL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SLV ROYAL TRANQUIL. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SLV ROYAL TRANQUIL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.