Home / Browse projects / Bengaluru Urban, Karnataka / SLV MILLENNIAL

Registration approved No litigation declared Residential/Group Housing project

SLV MILLENNIAL

By SLV BUILDERS AND DEVELOPERS

RG-KA-51504 · RERA PRM/KA/RERA/1251/310/PR/110823/006160 · Last updated on RERA Karnataka portal: 10 Aug 2023

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Dec 2024Possession promisedno revision filed
1Complaints at RERA Karnatakaon this registration
Jump to the 80 documents Report an error

SLV MILLENNIAL is a Residential/Group Housing project by SLV BUILDERS AND DEVELOPERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/110823/006160 on 11 Aug 2023. Possession is promised by 31 Dec 2024. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSLV MILLENNIAL
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/110823/006160
  • ReraGenie IDRG-KA-51504

Builder

  • NameSLV BUILDERS AND DEVELOPERS
  • Entity typePartnership Firm
  • GSTIN29ACAFS4219H1Z3
  • Authorized SignatoryC HARI BABU
  • Other registrations2 more →

Key dates

this monthRegisteredAug 2023PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 Aug 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SLV MILLENNIAL---64064

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 10 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 10 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
K. S. SUNA MIANDAD--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 23.70 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 19.65 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 1.18 cr-
Payment of taxesRs 1.00 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 70.00 lakh-
On-site expenditure-Site OverheadRs 63.14 lakh-
Payment of cessRs 28.96 lakh-
On-site expenditure-Salaries of workersRs 15.00 lakh-
On-site expenditure-Consultants FeesRs 9.50 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectG Bhanumathy
EngineerSrinivasa Rao Bollimunta
Chartered AccountantM Prasad

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01260/2024-SLV BUILDERS AND DEVELOPERS28/11/2024

Documents filed80

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/110823/006160 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
ARCHTECT CERTIFICATEFile: arch.pdf10 Aug 2023
CDPFile: Bengaluru-BDA-RMP-2015-PLU_PD_318-Begur.pdf10 Aug 2023
BUILDING LICENCEFile: bulding licence.jpeg10 Aug 2023
COAFile: COA Certificate-1.pdf10 Aug 2023
ITR FY 19-20File: 19-20.pdf8 Aug 2023
ITR FY 20-21File: 20-21.pdf8 Aug 2023
ITR FY 21-22File: 21-22.pdf8 Aug 2023
Source of FundsFile: Source of Funds.jpg8 Aug 2023
Conversion OrderFile: Mutation and Conversion.pdf8 Aug 2023
Between Brother and SisterFile: Between Brother and Sister.pdf8 Aug 2023
Gift Deed 2005File: Gift Deed 05.pdf8 Aug 2023
Gift Deed 2005File: Gift Deed 2005.pdf8 Aug 2023
GPA 1995File: GPA 1995.pdf8 Aug 2023
ECFile: EC.pdf8 Aug 2023
Estimation CopyFile: Estimation Copy.pdf8 Aug 2023
BWSSB ReceiptFile: BWSSB Receipt.pdf8 Aug 2023
STPFile: STP.pdf8 Aug 2023
Guidance Value SheetFile: Guidance.pdf8 Aug 2023
CDP MAPFile: CDP.pdf8 Aug 2023
Village MAPFile: Begur 338 RC (1).pdf8 Aug 2023
Single Layout PlanFile: VIP Layout, Phase 01.pdf8 Aug 2023
Registration CertificateFile: Reg Copy.pdf-
Partnership DeedFile: SLV Deed.pdf-
Partner Details-
Certificate issued by CA Form 1File: CA Reg 1.pdf-
Certificate issued by Architect Form 2File: Form -2, Architect (PR).pdf-
Certificate issued by Engineer Form 3File: Form - 3, Engineer (PR).pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation.pdf-
Certificate from Chartered AccountFile: CA AC.pdf-
Balance Sheet 2021 - 2022File: Yet To.pdf-
Balance Sheet 2020 - 2021File: BS SLV 2122.pdf-
Balance Sheet 2019 - 2020File: BS SLV 2021.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Yet To.pdf-
Audited Profit and Loss Statement 2020 - 2021File: PL SLV 2122.pdf-
Audited Profit and Loss Statement 2019 - 2020File: PL SLV 2021.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Yet To.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR SLV 2122.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR SLV 2021.pdf-
Commencement Certificate-
BESCOM NOC-
BWSSB NOC-
BBMP Plan-
BBMP Plan-
BBMP Plan-
SLV Millennial Specifications-
BBMP Plan-
PLAN SLV-
Structural Certificate-
Adv Search Report SLV-
GPA-
Conversion Ordercompressed-
Gift Deeds-
Proforma Sale Agreement-
SLV Millennial Allotment LetteR-
Form B-
Afidavit for 3 Violiation-
JD-
BESCOM NOC-
BWSSB NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
CFE-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
STP Drawing-
Prospectus/BrochureFile: Brochure.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SLV MILLENNIAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SLV BUILDERS AND DEVELOPERS

SLV BUILDERS AND DEVELOPERS has 3 registrations on RERA Karnataka, including SLV BRINDHAVAN and SLV MILLENNIAL. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SLV MILLENNIAL is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SLV MILLENNIAL?

The registered promoter entity is SLV BUILDERS AND DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29ACAFS4219H1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SLV MILLENNIAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SLV MILLENNIAL?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at SLV MILLENNIAL?

The professionals named in the filing: Architect: G Bhanumathy; Engineer: Srinivasa Rao Bollimunta; Chartered Accountant: M Prasad. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SLV MILLENNIAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SLV MILLENNIAL. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SLV MILLENNIAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.