Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SLV ELANZA is a Residential/Group Housing project by SLV INFRATECH in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/151222/005524 on 15 Dec 2022. Possession is promised by 31 Dec 2025.
At a glance
Project
- NameSLV ELANZA
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/309/PR/151222/005524
- ReraGenie IDRG-KA-16839
Builder
- NameSLV INFRATECH
- Entity typePartnership Firm
- GSTIN29AEDFS1321R1ZM
- Authorized SignatoryPRAVEEN.S
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on15 Dec 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed131 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SLV ELANZA | - | - | - | 68 | 0 | 68 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 24 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 24 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAMESH CHAND | - | - |
| Manjunath V | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 17.44 cr | - |
| On-site expenditure-Site Overhead | Rs 36.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 20.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Pramod C |
| Engineer | A. Ramachandran |
| Chartered Accountant | Hemadri Kolla |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed131
As listed on the registration, under the names the promoter filed them with; the newest 80 of 131 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/151222/005524 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| AGREEMENT OF SALEFile: AGREEMENT OF SALE.pdf | 24 Nov 2022 |
| AmenitiesFile: Amenities.pdf | 24 Nov 2022 |
| Building licencesFile: Building licences.pdf | 24 Nov 2022 |
| CDP PlanFile: CDP Plan.pdf | 24 Nov 2022 |
| Common area to association & common area to AlloteeFile: Common area to association & common area to Allotee.pdf | 24 Nov 2022 |
| Financial DocumentsFile: Financial Documents.pdf | 24 Nov 2022 |
| Financial Documents2File: Financial Documents2.pdf | 24 Nov 2022 |
| KSPCB AcknowledgmentFile: KSPCB Acknowledgment.pdf | 24 Nov 2022 |
| KSPCB CFEFile: KSPCB CFE.pdf | 24 Nov 2022 |
| StatementFile: Statement.pdf | 24 Nov 2022 |
| Structural Safety CertificateFile: Structural Safety Certificate.pdf | 24 Nov 2022 |
| Aakarband and survey sketchFile: Aakarband and survey sketch.pdf | 3 Nov 2022 |
| Advocate Search ReportFile: Advocate Search Report.pdf | 3 Nov 2022 |
| Affidavit 3(1)File: Affidavit 3(1).pdf | 3 Nov 2022 |
| Agreement of SaleFile: Agreement of Sale.pdf | 3 Nov 2022 |
| AkharbhandFile: Akharbhand.pdf | 3 Nov 2022 |
| ALLOTMENT LETTERFile: ALLOTMENT LETTER.pdf | 3 Nov 2022 |
| Architect Certificate Form_2File: Architect Certificate Form_2.pdf | 3 Nov 2022 |
| BESCOM NOC AND RECEIPTFile: BESCOM NOC AND RECEIPT.pdf | 3 Nov 2022 |
| Building LicenceFile: Building Licence.pdf | 3 Nov 2022 |
| BWSSB NOC AND RECEIPTFile: BWSSB NOC AND RECEIPT.pdf | 3 Nov 2022 |
| COA PramodFile: COA Pramod.pdf | 3 Nov 2022 |
| Engineer Certificate Form_3File: Engineer Certificate Form_3.pdf | 3 Nov 2022 |
| Floor PlansFile: Floor Plans.PDF | 3 Nov 2022 |
| Form BFile: Form B.pdf | 3 Nov 2022 |
| Hissa phody slvFile: Hissa phody slv.pdf | 3 Nov 2022 |
| Joint Affidavit Cum DeclarationFile: Joint Affidavit Cum Declaration.pdf | 3 Nov 2022 |
| Krishnamurthy title deedFile: Krishnamurthy title deed.pdf | 3 Nov 2022 |
| manjunath sale deedFile: manjunath sale deed.pdf | 3 Nov 2022 |
| Manjunath Title DeedFile: Manjunath Title Deed.pdf | 3 Nov 2022 |
| MR copyFile: MR copy.pdf | 3 Nov 2022 |
| Non Litigation AffidavitFile: Non Litigation Affidavit.pdf | 3 Nov 2022 |
| poojavenkatamma title deedFile: poojavenkatamma title deed.pdf | 3 Nov 2022 |
| Relinquishment DDFile: Relinquishment DD.pdf | 3 Nov 2022 |
| Relinquishment DeedFile: Relinquishment Deed.pdf | 3 Nov 2022 |
| Section Elevation PlanFile: Section Elevation Plan.PDF | 3 Nov 2022 |
| Single Layout PlanFile: Single Layout Plan.pdf | 3 Nov 2022 |
| STP DemarcationFile: STP Demarcation.pdf | 3 Nov 2022 |
| STILT FLOOR PLANFile: STILT FLOOR PLAN.pdf | 3 Nov 2022 |
| Village map proposed siteFile: Village map proposed site.pdf | 3 Nov 2022 |
| Village mapFile: Village map.pdf | 3 Nov 2022 |
| Firm Registered CertificateFile: Firm Registered Certificate.pdf | 5 Oct 2022 |
| Partnership DeedFile: Partnership Deed.pdf | 5 Oct 2022 |
| Sub Registrar Guidance ValueFile: SUB REGISTRAR GUIDANCE VALUE.pdf | 5 Oct 2022 |
| Sale Deed - ManjunathFile: manjunath sale deed.pdf | 5 Oct 2022 |
| Sale deed - Ramesh ChandFile: Ramesh Chand Sale Deed.pdf | 5 Oct 2022 |
| RTC, survey 50/1 | - |
| Mutation, survey 50/1 | - |
| Encumbrance Certificate, survey 50/1 | - |
| Conversion/Alienation Order, survey 50/1 | - |
| JDA, survey 50/1 | - |
| Khatha, survey 50/1 | - |
| RTC, survey 50/1 | - |
| Mutation, survey 50/1 | - |
| Encumbrance Certificate, survey 50/1 | - |
| Conversion/Alienation Order, survey 50/1 | - |
| JDA, survey 50/1 | - |
| Khatha, survey 50/1 | - |
| Registration CertificateFile: Firm Registered Certificate.pdf | - |
| Partnership DeedFile: Partnership Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: SLV Infratech CA RERA Certificate Form 1.pdf | - |
| Certificate issued by Architect Form 2File: Form -2-Architects certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form -3-Engineers certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: No Litigation Affidavit.pdf | - |
| Certificate from Chartered AccountFile: SLV Infratech CA RERA Certificate Form 1.pdf | - |
| Balance Sheet 2020 - 2021File: Financial FY 2021-22.pdf | - |
| Balance Sheet 2019 - 2020File: Financial FY 2021-22.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Financial FY 2021-22.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: Financial FY 2021-22.pdf | - |
| Director's Report 2020 - 2021File: Financial FY 2021-22.pdf | - |
| Director's Report 2019 - 2020File: Financial FY 2021-22.pdf | - |
| Cash Flow Statement 2020 - 2021File: Financial FY 2021-22.pdf | - |
| Cash Flow Statement 2019 - 2020File: Financial FY 2021-22.pdf | - |
| Auditor's Report 2020 - 2021File: Financial FY 2021-22.pdf | - |
| Auditor's Report 2019 - 2020File: Financial FY 2021-22.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SLV ELANZA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: SLV INFRATECH
SLV INFRATECH has 1 registration on RERA Karnataka, including SLV ELANZA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SLV ELANZA is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SLV ELANZA?
The registered promoter entity is SLV INFRATECH, a partnership firm as per the filing. Its GSTIN 29AEDFS1321R1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SLV ELANZA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SLV ELANZA?
The professionals named in the filing: Architect: Pramod C; Engineer: A. Ramachandran; Chartered Accountant: Hemadri Kolla. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SLV ELANZA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback