Red flags

  • 2 complaints at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Mar 2022Possession promisedmoved 12 months from the original
2Complaints at RERA Karnatakaon this registration
Jump to the 48 documents Report an error

Skyline Retreat is a Residential/Group Housing project by skyline constructions & Housing pvt ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/201106/003683 on 6 Nov 2020. Possession is promised by 31 Mar 2022. The completion date has moved by 12 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSkyline Retreat
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/201106/003683
  • ReraGenie IDRG-KA-03659

Builder

  • Nameskyline constructions & Housing pvt ltd
  • Entity typeCompany
  • Authorized SignatoryAvinash Prabhu
  • OthersDilip Kumar

Key dates

this monthRegisteredNov 2020First promiseMar 2021Revised toMar 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Nov 2020
  • Promised completion31 Mar 2022
  • Revised completionRevised to 31 Mar 2022 (originally 31 Mar 2021)
  • Buildings1 building record
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Skyline Retreat---58058

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 17 Mar 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 17 Mar 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,615 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 13.27 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/221219/003683Mar 2021 → Mar 2022

Reason as filed by the promoterForce Majeure

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
CMP/210313/0007785-skyline constructions & Housing pvt ltd13/03/2021
CMP/211124/0008630-skyline constructions & Housing pvt ltd24/11/2021

Documents filed48

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/201106/003683 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Reply letterFile: Reply letter.pdf17 Mar 2020
Commencement CertificateFile: Commencement Certificate.pdf17 Mar 2020
Sec 3(1) non-violation AffidavitFile: Sec 3(1) non-violation Affidavit.pdf17 Mar 2020
Copy of building bye-lawFile: building bye-law 2003 sec 5.6(1c).pdf17 Mar 2020
CertificateFile: PAN AP&DP.pdf-
Certificate form Architect,Engineer,CA etc.File: CA Certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect Completed work.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Work Completed.pdf-
CA Certificate for Funds UtilizationFile: CA Funds Utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Pending work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer Work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Funds Required.pdf-
AffidavitFile: Extension Affidavit Sec 4(2)(I)D.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Extension Affidavit Form B.pdf-
Document 2File: Extension Affidavit Sec 4(2)(I)D.pdf-
Document 3File: Extension Affidavit.pdf-
Commencement Certificate-
Site Plan-
Site plan-
SALE DEED Draft Retreat-
SA -Retreat Draft-
Sales Deed & RTC-
Site Plan-
Site Plan-
Project Specification-
EC-
Khatha-
Joint Development Agreement-
Conversion-
NOC-BESOM-
NOC-BWSSB-
NOC-RETREAT BSNL-
Typical floor plan-
Terrace floor plan-
Conversion-
Balance Sheet 2016 - 2017File: Balance sheet 15-16.pdf-
Balance Sheet 2015 - 2016File: SCHPL Balance Sheet14-15.pdf-
Balance Sheet 2014 - 2015File: SCHPL Balance Sheet13-14.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Balance sheet 15-16.pdf-
Audited Profit and Loss Statement 2015 - 2016File: SCHPL Balance Sheet14-15.pdf-
Audited Profit and Loss Statement 2014 - 2015File: SCHPL Balance Sheet13-14.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 2015-16.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 2014-15.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR 2013-14.pdf-
Form-B-
Appeal 1 Order CopyFile: 2195.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_201106_003683.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Skyline Retreat on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: skyline constructions & Housing pvt ltd

skyline constructions & Housing pvt ltd has 1 registration on RERA Karnataka, including Skyline Retreat. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Skyline Retreat is delayed beyond 31 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Skyline Retreat?

The registered promoter entity is skyline constructions & Housing pvt ltd, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Skyline Retreat?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Skyline Retreat?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in Skyline Retreat?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Skyline Retreat. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Skyline Retreat to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.