Registration approved No litigation declared Residential/Group Housing project

SKYLINE HAVEN-2

By SV INFRA HOMES

RG-KA-01875 · RERA PRM/KA/RERA/1251/308/PR/061026/008994 · Last updated on RERA Karnataka portal: 24 Sep 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Aug 2029Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 143 documents Report an error

SKYLINE HAVEN-2 is a Residential/Group Housing project by SV INFRA HOMES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/061026/008994 on 6 Oct 2026. Possession is promised by 30 Aug 2029.

At a glance

Project

  • NameSKYLINE HAVEN-2
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 560105
  • Pincode560105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/061026/008994
  • ReraGenie IDRG-KA-01875

Builder

  • NameSV INFRA HOMES
  • Entity typePartnership Firm
  • GSTIN29AFAFS8549F1ZK
  • Authorized SignatoryGuduguntla Kotaiah
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2026PromisedAug 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Oct 2026
  • Promised completion30 Aug 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed143 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SKYLINE HAVEN-2---1000100

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 24 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 24 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,058 sq m
Named landowners3
LandownerVillageDistrict
K. MANJULA--
ASHOK KUMAR. L--
T. JAGADISH--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 18.00 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 18.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTata Vittala Srinivas
EngineerSUNIL KUMAR B
Chartered AccountantNikhil N

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed143

As listed on the registration, under the names the promoter filed them with; the newest 80 of 143 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/061026/008994 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
EC- 488-2 till dateFile: EC- 488-2.pdf24 Sep 2026
EC- 491-3 till dateFile: EC- 491-3.pdf24 Sep 2026
Project Address Clarification with planFile: Project Address Clarification.pdf24 Sep 2026
Plan 1File: Plan 1.pdf24 Sep 2026
Plan 2File: Plan 2.pdf24 Sep 2026
Plan 3File: Plan 3.pdf24 Sep 2026
STRUCTURAL Eng Licence with self atttestedFile: STRUCTURALEng Licence with self atttested.pdf24 Sep 2026
STRUCTURAL STABILITY CERTIFICATEFile: STRUCTURAL STABILITY CERTIFICATE.pdf24 Sep 2026
Water NOC AffidavitFile: Water NOC Affidavit.pdf24 Sep 2026
Land cost area Clarification with planFile: Land cost area Clarification.pdf24 Sep 2026
Land cost details and guidance valueFile: Land cost details and guidance value.pdf24 Sep 2026
PlanFile: Plan 1.pdf24 Sep 2026
Eng Licence certificateFile: Eng member certificate.pdf24 Sep 2026
STPFile: STP.pdf24 Sep 2026
RTC, survey 488/2-
Mutation, survey 488/2-
Encumbrance Certificate, survey 488/2-
Conversion/Alienation Order, survey 488/2-
Sale/Title/Gift Deed, survey 488/2-
JDA, survey 488/2-
Khatha, survey 488/2-
RTC, survey 491/3-
Mutation, survey 491/3-
Encumbrance Certificate, survey 491/3-
Conversion/Alienation Order, survey 491/3-
Sale/Title/Gift Deed, survey 491/3-
JDA, survey 491/3-
Khatha, survey 491/3-
GST CertificateFile: GST CERTIFICATE.pdf-
Partnership DeedFile: Partnership Deed_compressed.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form-Reg - 1 CA Cert.pdf-
Certificate issued by Architect Form 2File: FORM-2 Architects Cert.pdf-
Certificate issued by Engineer Form 3File: FORM - 3 CERTIFICATE BY ENGINEER.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non-Litigation Affidavit.pdf-
Balance Sheet 2024 - 2025File: Balance sheet 2024-25.pdf-
Balance Sheet 2023 - 2024File: Balance sheet 2023-24.pdf-
Balance Sheet 2022 - 2023File: Attested PAN SV infra.pdf-
Audited Profit and Loss Statement 2024 - 2025File: Profit and Loss Account 2024-25.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Profit and Loss Account 2023-24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Attested PAN SV infra.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: Firm ITR 2024-25.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: Firm ITR 2023-24.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: Attested PAN SV infra.pdf-
Plan Sanction Order-
Floor plan new-
Plan 1-
STRUCTURAL STABILITY CERTIFICATE-
SPECIFICATIONS-
Clarification About Non Production of brochures-
Relinquishment Deed clarification letter-
Agreement of Sale Proforma as per RERA (10) (7)-
Allotment Letter-
Form-B affidavit-
Section 3-1 affidavit-
JDA Affidavit-
Legal Opinion-
BESCOM NOC (5)-
WATER NOC (3)-
KSPCB NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Conversion Order 488-2-
EC - 488 - 2--2004 to 25-
EC 488 - 2 Latest-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SKYLINE HAVEN-2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSKYLINE HAVEN-2Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: SV INFRA HOMES

SV INFRA HOMES has 2 registrations on RERA Karnataka, including SKYLINE HAVEN-2 and SKYLINE HAVEN. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SKYLINE HAVEN-2 is delayed beyond 30 Aug 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SKYLINE HAVEN-2?

The registered promoter entity is SV INFRA HOMES, a partnership firm as per the filing. Its GSTIN 29AFAFS8549F1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SKYLINE HAVEN-2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SKYLINE HAVEN-2?

The professionals named in the filing: Architect: Tata Vittala Srinivas; Engineer: SUNIL KUMAR B; Chartered Accountant: Nikhil N. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SKYLINE HAVEN-2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SKYLINE HAVEN-2. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SKYLINE HAVEN-2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.