SKY GATEWAY
RG-GJ-41755 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA10731/EX1/021126/301227 · Last updated on GujRERA portal: 6 Aug 2026
Source: official GujRERA filing
Red flags
- Completion date moved by 16 months
- 1 extension taken
- Loan reported on the project, Rs 7.76 crore still to repay, in favour of Unsecured loan as per list, Secured loan from SBI, 117 units mortgaged
Clear
- Nothing verified clear yet
3 conditions are on this record. The buyer report sets each one beside the rest of this filing and the projects around it.
See what the report covers Free either way: .Saved.
SKY GATEWAY is a Mixed Development project by SKY DEVELOPERS in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA10731/EX1/021126/301227 on 4 Oct 2022. Possession is promised by 30 Dec 2027. The completion date has moved by 16 months from the original filing. 108 of the 117 units on this registration are recorded sold or booked, and 3 of 9 construction stages are filed complete.
At a glance
Project
- NameSKY GATEWAY
- TypeMixed Development
- Location
- Survey No.: 1188/2/1
- T.P. No.: 3
- F.P. No.: 864
- Kaladarshan Char Rasta
- Waghodia Road
- Danteshwar
- Vadodara
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA10731/EX1/021126/301227
- ReraGenie IDRG-GJ-41755
Builder
- NameSKY DEVELOPERS
- Entity typePARTNERSHIP FIRM
- Other registrations11 more →
Key dates
Key facts
Registration and timeline
- StatusValid until 30 Dec 2027
- Registered on4 Oct 2022
- Promised completion30 Dec 2027
- Revised completionRevised to 30 Dec 2027 (originally 31 Aug 2026)
- Buildings1 building record
- Documents filed48 files
Current status
Figures as on 6 Aug 2026, this project's latest GujRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AB | - | - | - | 99 | 18 | 117 |
The full filing
Everything below is from the project's own GujRERA filing, free to read.
Construction progress by building1
As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 9 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.
AB: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 90% |
| Sanitary fittings within the flats | 80% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 85% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 80% |
Progress on shared amenities19
As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal roads and footpaths | Yes | 80% |
| Water supply | Yes | 90% |
| Sewerage (chamber, lines, septic tank, STP) | Yes | 85% |
| Storm water drains | No | Not applicable |
| Landscaping and tree planting | No | Not applicable |
| Street lighting | Yes | 85% |
| Community buildings | Yes | 80% |
| Treatment and disposal of sewage and sullage water | Yes | 80% |
| Solid waste management and disposal | No | Not applicable |
| Water conservation, rain water harvesting | Yes | 80% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 85% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Fire fighting | Yes | 80% |
| Drinking water facilities | Yes | 80% |
| Emergency evacuation | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Security | Yes | 85% |
| Letter box | No | Not applicable |
Land and ownership
A loan secured on the project is a charge your unit may carry until it is released. Ask the promoter for the lender's no-objection certificate for your unit before you pay any amount. This is the accountant's Form 3, not a title search.
| Lender, as filed | Loan taken | Repaid | Balance | Units mortgaged |
|---|---|---|---|---|
| Unsecured loan as per list | Rs 17.52 cr | Rs 9.76 cr | Rs 7.76 cr | None |
| Secured loan from SBI | Rs 10.10 cr | Rs 10.10 cr | Nil | 117 |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| AB | NA | Rs 27.50 cr | Rs 26.09 cr |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RUCHIR SHETH |
| Engineer | BHUPENDRA R PATEL |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Documents filed48
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA10731/EX1/021126/301227 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Accountant's certificate (Form 3) | 6 Aug 2026 |
| Architect's certificate (Form 1) | 20 Jul 2026 |
| Engineer's certificate (Form 2) | 20 Jul 2026 |
| Engineer's certificate annexure | 20 Jul 2026 |
| Site photograph, AB | 18 Jul 2026 |
| Site photograph, AB | 18 Jul 2026 |
| Site photograph, AB | 18 Jul 2026 |
| Site photograph, AB | 18 Jul 2026 |
| Site photograph, AB | 18 Jul 2026 |
| Site photograph, AB | 18 Jul 2026 |
| Site photograph, AB | 18 Jul 2026 |
| Site photograph, AB | 18 Jul 2026 |
| Site photograph, AB | 18 Jul 2026 |
| Site photograph, AB | 18 Jul 2026 |
| RERA registration certificate | 4 Oct 2022 |
| Auditor's report (1 of 3) | - |
| Auditor's report (2 of 3) | - |
| Auditor's report (3 of 3) | - |
| Income tax return (1 of 3) | - |
| Income tax return (2 of 3) | - |
| Income tax return (3 of 3) | - |
| Project specific document | - |
| Directors' report (1 of 3) | - |
| Directors' report (2 of 3) | - |
| Directors' report (3 of 3) | - |
| Commencement certificate | - |
| Approved sanctioned plan | - |
| Approved layout plan | - |
| Agreement | - |
| Land location | - |
| Encumbrance certificate | - |
| Area development document | - |
| Brochure | - |
| Project related document | - |
| Declaration in Form B | - |
| Title clearance certificate | - |
| Title report | - |
| Property card | - |
| Project photograph | - |
| Audited balance sheet (1 of 3) | - |
| Audited balance sheet (2 of 3) | - |
| Audited balance sheet (3 of 3) | - |
| Audited profit and loss statement (1 of 3) | - |
| Audited profit and loss statement (2 of 3) | - |
| Audited profit and loss statement (3 of 3) | - |
| Cash flow statement (1 of 3) | - |
| Cash flow statement (2 of 3) | - |
| Cash flow statement (3 of 3) | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Vadodara
Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's GujRERA filing, in plain language.
- 3 conditions on this project's record set out, with the clear checks alongside
- Bookings building by building: units sold and booked against units sanctioned, placed against the projects around it
- Construction as filed: the stage checklist and the engineer's cost figures, building by building
- The accountant's Form 3 read beside the rest of the filing, with what to ask about any loan on it
- The parking the promoter filed, covered and open
- Who certified it: the architect and the engineer named on the filing
- Joined against the promoter's other registrations on GujRERA and every project registered within 2 km, which the register never shows together
- What to check before you book, drawn from this filing
Not included: the filed documents themselves (the report lists which are on file and does not read them) and a project watch.
Keep SKY GATEWAY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vadodara2,900+ in Vadodara
Filed coordinates, straight-line distance. 126 registered projects within 2 km.
PMAY, EWS, TP 28, FP 152/1+152/2, R.S.no.585/1
VADODARA MUNICIPAL CORPORATION
AGORA CITY CENTER
MANAV INFRASTRUCTURE PRIVATE LIMITED
49 shops + 1560 EWS - II at Gorwa, Phase 5
GUJARAT HOUSING BOARD
PMAY-KHATAMBA
VADODARA URBAN DEVELOPMENT AUTHORITY
Akshar Pavilion
AKSHAR PHC REALCON
NAZARBAUG PALACE PHASE-1
ONS BUILDTECH LLP
See every Vadodara project, with the district possession charts
Builder: SKY DEVELOPERS
SKY DEVELOPERS has 12 registrations on GujRERA, including SKY WALK and SKYLINE APPARTMENT. Read the full track record. See more projects on the Vadodara district page.
Frequently asked questions
What are my rights if SKY GATEWAY is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.
How do I verify and contact the developer of SKY GATEWAY?
The registered promoter entity is SKY DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.
Is my payment protected in SKY GATEWAY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SKY GATEWAY?
The professionals named in the filing: Architect: RUCHIR SHETH; Engineer: BHUPENDRA R PATEL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SKY GATEWAY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.
Report an error Share feedback