Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
Saved.
SKR GARDENS is a Residential/Group Housing project by SKR GARDENS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/210324/006708 on 21 Mar 2024. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 17 of the 84 units on this registration are recorded sold or booked, and 4 of 18 construction stages are filed complete.
At a glance
Project
- NameSKR GARDENS
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 560105
- Pincode560105
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/210324/006708
- ReraGenie IDRG-KA-86187
Builder
- NameSKR GARDENS
- Entity typePartnership Firm
- Authorized SignatoryB M SUDHA REDDY
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on21 Mar 2024
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed230 files
Current status
Figures as on 12 Aug 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SKR GARDEN | - | - | - | 84 | 0 | 84 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 18 construction stages are filed complete. The stage furthest along is Masonry Construction, at 95%.
Building: 88% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 90% |
| Masonry Construction | 95% |
| Plastering inside , outside & Ceiling | 90% |
| Joinery: Doors, Windows, Ventilators etc | 85% |
| Basic work of Water supply, Sanitary and Electrification | 70% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 80% |
| Railing and Grill fixing | 85% |
| Electrification, Water supply and Sanitary Finishing | 80% |
| Painting | 85% |
| Fire prevention and fire fighting fitting and fixture with network | 80% |
| Weather Proof work(tile,concrete) | 80% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 85% |
| Elevation work | 90% |
| Internal and External work including landscapes as per sanctioned drawings | 90% |
Progress on shared amenities40
As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 90% |
| Sewage and Drainage System | Yes | 80% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 80% |
| Energy management | Yes | 80% |
| Fire protection and fire safety requirements | Yes | 90% |
| Solid waste management and disposal | Yes | 80% |
| Emergency Evacuation services | Yes | 85% |
| Internal Roads & Footpaths | Yes | 90% |
| Electricity supply transformer and substation | Yes | 90% |
| Storm water drains | Yes | 80% |
| Use of renewable energy | Yes | 80% |
| Sewage Treatment Plant (STP) | Yes | 80% |
| Parks & Tree planting | Yes | 90% |
| Street Lighting | Yes | 90% |
| Electricity | Yes | 90% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 80% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | 80% |
| Gym | Yes | 80% |
| Parks | Yes | 80% |
| Power Backup | Yes | 80% |
| Piped Gas | Yes | 80% |
| Water and Sanitation | Yes | 80% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 90% |
| Corridor/Lobbies | Yes | 90% |
| Fire escapes | Yes | 90% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 90% |
| Basement | Yes | 100% |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas | Yes | 90% |
| Provision for lodging of management staff and security staff | Yes | 90% |
| Water conservation and renewable energy | Yes | 90% |
| Common storage spaces | Yes | 90% |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| C Muniramaiah | - | - |
| Sri. C.Narayanappa | - | - |
| Sri. C.Narayanappa | - | - |
| Sri. C.Narayanappa | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 60.53 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | T V Srinivas |
| Engineer | Mandhadi Venkataramana Reddy |
| Chartered Accountant | P Venkobi |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterShortage of Labour
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed230
As listed on the registration, under the names the promoter filed them with; the newest 80 of 230 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/210324/006708 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Affidavit for Renewed Approved Building PlanFile: 1 Affidavit for Renewed Approved Building Plan.pdf | 12 Aug 2026 |
| Affidavit for Renewed Approved Building OrderFile: 2 Affidavit for Renewed Approved Building Order.pdf | 12 Aug 2026 |
| Form 5 Architect Certificate Q1 June 26File: Form 5 Architect Certificate Q1 June 26.pdf | 12 Aug 2026 |
| Query Answer document 12-08-2026File: Query Answer document 12-08-2026.pdf | 12 Aug 2026 |
| EC all Sy NosFile: 1 EC all Sy Nos.pdf | 4 Aug 2026 |
| Affidavit for Renewed Approved Building PlanFile: 2 Affidavit for Renewed Approved Building Plan.pdf | 4 Aug 2026 |
| Affidavit for Renewed Approved Building OrderFile: 3 Affidavit for Renewed Approved Building Order.pdf | 4 Aug 2026 |
| Query Answer document 04-08-2026File: Query Answer document 04-08-2026.pdf | 4 Aug 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 CA Certificate (Q1 2026-27).pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate Q1.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineers_Certificate_Q1.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 CA Certificate (Q4 2025-26).pdf | 4 Jul 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 March 26.pdf | 4 Jul 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 March 26.pdf | 4 Jul 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 CA Certificate (Q3 2025-26).pdf | 3 Jul 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Dec 25.pdf | 3 Jul 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Dec 25.pdf | 3 Jul 2026 |
| Clarification LetterFile: Clarification Letter.pdf | 18 Mar 2024 |
| Engineer certificateFile: Engineer Certificate.jpg | 6 Mar 2024 |
| Reply LetterFile: Reply.jpg | 6 Mar 2024 |
| Net worth CertificateFile: SKR GARDEN .pdf | 6 Mar 2024 |
| Rely LetterFile: Reply.jpg | 26 Feb 2024 |
| Engineer CertificateFile: Engineer Certificate.jpg | 26 Feb 2024 |
| Block 1 section elevation planFile: Block 1 section elevation plan.pdf | 1 Feb 2024 |
| Block 2 section elevation planFile: Block 2 section elevation plan.pdf | 1 Feb 2024 |
| Block 2 section elevation plan (2)File: Block 2 section elevation plan (2).pdf | 1 Feb 2024 |
| SKR garden kspcb ackFile: SKR garden kspcb ack.pdf | 1 Feb 2024 |
| Commencement certiFile: Commencement certi.pdf | 1 Feb 2024 |
| Rera AccountFile: Rera Account.pdf | 28 Aug 2023 |
| M O F with supporting documentFile: M O F with supporting document.pdf | 28 Aug 2023 |
| KhathaFile: Khatha.pdf | 28 Aug 2023 |
| C O of 60/2 and 61/3File: C O 60 2 61 3.pdf | 28 Aug 2023 |
| C O of 61/2File: C O 61 2.pdf | 28 Aug 2023 |
| M R 86 the land in the name AbbhaiaFile: MR 86.pdf | 28 Aug 2023 |
| Reconstitution of Partnership deedFile: Reco partner deed.pdf | 28 Aug 2023 |
| Name change of Firm documentFile: Name change of Firm.pdf | 28 Aug 2023 |
| Partition deedFile: Partition deed.pdf | 28 Aug 2023 |
| Levell floor planFile: Levell Floor Plans.pdf | 28 Aug 2023 |
| 2. BS and PL 2022 vit SheduleFile: BS and PL 2022 vit Shedule.pdf | 2 Jun 2023 |
| 2. LETTER FOR SUPPORTING DOCUMENTFile: Letter for Supporting document.pdf | 2 Jun 2023 |
| 3. KhathaFile: Khatha.pdf | 2 Jun 2023 |
| 4. Hissa Podi of sy no 60 61File: Hissa Podi of sy no 60 61.pdf | 2 Jun 2023 |
| 4. Conversion order of 60 2 and 61 3File: C O 60 2 61 3.pdf | 2 Jun 2023 |
| 4. Conversion order of 61 2File: C O 61 2.pdf | 2 Jun 2023 |
| 5. Tittle Deed of AbbiahFile: Tittle Deed of Abbiah.pdf | 2 Jun 2023 |
| 6. 10. Memorundum Reconstitution deedFile: Memorundum Reconstitution deed.pdf | 2 Jun 2023 |
| 7. Partnership deed and fir certFile: Partnership deed and fir cert.pdf | 2 Jun 2023 |
| 7. Declearation for Partnership DeedFile: Declearation for Partnership Deed.pdf | 2 Jun 2023 |
| 7. Memorundum Reconstitution deedFile: Memorundum Reconstitution deed.pdf | 2 Jun 2023 |
| 7. Addendum Partnership DeedFile: Addendum Partnership Deed.pdf | 2 Jun 2023 |
| 8. Single plot layoutFile: Single plot layout.pdf | 2 Jun 2023 |
| 9. Level Floor PlansFile: Levell Floor Plans.pdf | 2 Jun 2023 |
| 10. Sanctioned elevation and Section plansFile: Levell Floor Plans.pdf | 2 Jun 2023 |
| 11. Certified Carpet AreaFile: Certified Carpet Area.pdf | 2 Jun 2023 |
| 16. Commencement certiFile: Commencement certi.pdf | 2 Jun 2023 |
| 17. Layout orderFile: Commencement certi.pdf | 2 Jun 2023 |
| 19. Declaration for BESCOM NOCFile: Declaration for BESCOM NOC.pdf | 2 Jun 2023 |
| 20. New Agreement for SaleFile: New Agreement for Sale.pdf | 2 Jun 2023 |
| 4. HISSA PODI SY NO 60 61File: HISSA PODI SY NO 60 61.pdf | 2 Jun 2023 |
| BS and PL 2020File: BS and PL 2020.pdf | 13 Apr 2023 |
| BS AND PL 2021File: BS AND PL 2021.pdf | 13 Apr 2023 |
| BS and PL 2022 vit SheduleFile: BS and PL 2022 vit Shedule.pdf | 13 Apr 2023 |
| C O 60 2 61 3File: C O 60 2 61 3.pdf | 13 Apr 2023 |
| C O 61 2File: C O 61 2.pdf | 13 Apr 2023 |
| Memorundum Reconstitution deedFile: Memorundum Reconstitution deed.pdf | 13 Apr 2023 |
| JDA ORIGINAL AGREEMENTFile: JDA (2).pdf | 13 Apr 2023 |
| Memorundum Reconstitution deedFile: Memorundum Reconstitution deed.pdf | 13 Apr 2023 |
| Partnership deed and fir certFile: Partnership deed and fir cert.pdf | 13 Apr 2023 |
| single layout planFile: single layout plan.pdf | 13 Apr 2023 |
| Commencement certiFile: Commencement certi.pdf | 13 Apr 2023 |
| Rera AccountFile: Rera Account.pdf | 13 Apr 2023 |
| Form 1 CA certiFile: Form 1 CA certi.pdf | 13 Apr 2023 |
| Rera AccountFile: Rera Account.pdf | 13 Apr 2023 |
| Lokal kathaFile: Lokal katha.pdf | 13 Apr 2023 |
| Abbhayya Title deedFile: Abbhayya Title deed.pdf | 13 Apr 2023 |
| No Litigation AffidavitFile: No Litigation Affidavit.pdf | 13 Apr 2023 |
| Levell Floor PlansFile: Levell Floor Plans.pdf | 13 Apr 2023 |
| Sectional Elevation planFile: Levell Floor Plans.pdf | 13 Apr 2023 |
| Application of KSPCB NOCFile: Application of KSPCB NOC.pdf | 13 Apr 2023 |
| CDP mapsFile: CDP maps.pdf | 13 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SKR GARDENS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 10 registered projects within 2 km.
DS MAX SKY SANMAN
DS Max Properties Private Limited
M5 ECHELON
Mahendra Homes Private Limited
BREN PARK CITY
BREN CORPORATION PRIVATE LIMITED
DS MAX SKY STANZA
DS MAX PROPERTIES PRIVATE LIMITED
SATTVA AMRITYA
Sattva Resi Private Limited
HABULUS TRANQUIL
HABULUS BUILDERS AND DEVELOPERS PRIVATE LI
See every Bengaluru Urban project, with the district possession charts
Builder: SKR GARDENS
SKR GARDENS has 1 registration on RERA Karnataka, including SKR GARDENS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SKR GARDENS is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SKR GARDENS?
The registered promoter entity is SKR GARDENS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SKR GARDENS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SKR GARDENS?
The professionals named in the filing: Architect: T V Srinivas; Engineer: Mandhadi Venkataramana Reddy; Chartered Accountant: P Venkobi. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SKR GARDENS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback