Home / Browse projects / Bengaluru Urban, Karnataka / SIMHADRI
SIMHADRI
By M/s.SIGNIFA SIMHADRI PROJECTS
RG-KA-44304 · RERA PRM/KA/RERA/1251/308/PR/170226/008469 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SIMHADRI is a Residential/Group Housing project by M/s.SIGNIFA SIMHADRI PROJECTS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/170226/008469 on 17 Feb 2026. Possession is promised by 30 Sep 2029. 6 of the 190 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameSIMHADRI
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 560105
- Pincode560105
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/170226/008469
- ReraGenie IDRG-KA-44304
Builder
- NameM/s.SIGNIFA SIMHADRI PROJECTS
- Entity typePartnership Firm
- GSTIN29AFGFS2647G1ZP
- Authorized SignatoryPAILLA SHASHIDHAR REDDY
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on17 Feb 2026
- Promised completion30 Sep 2029
- Revised completionNone
- Buildings3 building records
- Documents filed186 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLOCK-1 | - | - | - | 70 | 0 | 70 |
| BLOCK-2 | - | - | - | 60 | 0 | 60 |
| BLOCK-3 | - | - | - | 60 | 0 | 60 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 70%.
Building: 14% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 70% |
| Foundation footing work | 70% |
| Upto Plinth Level | 60% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 50% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 4% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | Yes | 0% |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 60% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership7
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shruthi M | - | - |
| Gayathri Devi | - | - |
| M Muralidhar | - | - |
| M Lokesh | - | - |
| Krishna Murthy M | - | - |
| Renuka M | - | - |
| M Prema Sudhakara | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 50.00 cr | Rs 3.88 cr |
| Payment of taxes | Rs 5.17 cr | Rs 54.14 lakh |
| On-site expenditure-Site Overhead | Rs 4.00 cr | Rs 37.80 lakh |
| Marketing Charges | Rs 3.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 50.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Hanumesh G |
| Engineer | KOMIRI RAMESH |
| Chartered Accountant | M Balaji |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed186
As listed on the registration, under the names the promoter filed them with; the newest 80 of 186 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/170226/008469 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU March 2026.pdf | 15 Oct 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU March 2026.pdf | 15 Oct 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU March 2026.pdf | 15 Oct 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Oct 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Oct 2026 |
| Q4 2025-26 Fire and Safety | 15 Oct 2026 |
| Q4 2025-26 Airport Authority of India | 15 Oct 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU June 2026.pdf | 15 Oct 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU June 2026.pdf | 15 Oct 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU June 2026.pdf | 15 Oct 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q1 2026-27 Fire and Safety | 15 Oct 2026 |
| Q1 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU Sep 2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU Sep 2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU Sep 2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| 61_4 MRFile: 61_4 MR.pdf | 3 Feb 2026 |
| eKhataFile: 611 eKhata.pdf | 3 Feb 2026 |
| EC All Sy NoFile: EC All Sy No.pdf | 3 Feb 2026 |
| EC UPTODATEFile: EC UPTODATE.pdf | 3 Feb 2026 |
| JDA convertedFile: JDA converted.pdf | 3 Feb 2026 |
| MR 61_1File: MR 61_1.pdf | 3 Feb 2026 |
| MR T12 All OwnersFile: MR T12 All Owners.pdf | 3 Feb 2026 |
| RTC MR all Sy NosFile: RTC MR all Sy Nos.pdf | 3 Feb 2026 |
| of 1 DEED OF RELEASEFile: 1 of 1 DEED OF RELEASE.pdf | 22 Jan 2026 |
| of 1 T18 MR GayathrideviFile: 1 of 1 T18 MR Gayathridevi.pdf | 22 Jan 2026 |
| of 1 Land Onwer Declaration Mr JagadishFile: Land Onwer Declaration Mr Jagadish.pdf | 22 Jan 2026 |
| of 1 Single Plot Approval Letter 20012026File: 2 of 1 Single Plot Approval and Order Letter 20012026.pdf | 22 Jan 2026 |
| of 2 Single Plot Approval Letter 20012026File: 2 of 2 Single Plot Approval and Order Letter 20012026 - Copy.pdf | 22 Jan 2026 |
| of 1 & 2 Letter for Exclusive balcony verandah & exclusive balcony verandah DetailsFile: 3 of 1 & 2 Letter for Exclusive balcony verandah & exclusive balcony verandah Details.pdf | 22 Jan 2026 |
| of 3 Certificate of Structural Stability Certificate Simhadi 13012026File: 3 of 3 Certificate of Structural Stability Certificate Simhadi 13012026.pdf | 22 Jan 2026 |
| of 3 Structural Reg Certiicate with self attestedFile: 3 of 3 Structural Reg Certiicate with self attested.pdf | 22 Jan 2026 |
| Form-1 CA Cerificate SimhadriFile: 1 of 2 Form-1 CA Cerificate Simhadri.pdf | 4 Jan 2026 |
| Affidavit Bank AccFile: 1 of 3 Affidavit Bank Acc.pdf | 4 Jan 2026 |
| Bank Statements from sing & seal from BankFile: 1 of 4 Bank Statements from sing & seal from Bank.pdf | 4 Jan 2026 |
| Source Of FundFile: 1 of 5 Source Of Fund.pdf | 4 Jan 2026 |
| Financial documents of 3yearsFile: 1 of 6 Financial documents of 3years.pdf | 4 Jan 2026 |
| Single Plot Approval Order LetterFile: 2 of 1 Single Plot Approval Order Letter.pdf | 4 Jan 2026 |
| Single plot Plans SimhadriFile: 2 of 2 Single Plot Approval Plan Letter.pdf | 4 Jan 2026 |
| Building LicenseFile: 2 of 3 Building License.pdf | 4 Jan 2026 |
| ADLR SketchFile: 2 of 4 ADLR Sketch.pdf | 4 Jan 2026 |
| SITE boundaries including latitude and longitude of the end points of the prFile: 2 of 5 SITE boundaries including latitude and longitude of the end points of the project.p | 4 Jan 2026 |
| Commencement CertificateFile: 2 of 6 Commencement Certificate.pdf | 4 Jan 2026 |
| Demarked Site Location in CDP MapFile: 2 of 7 Demarked Site Location in CDP Map.jpeg | 4 Jan 2026 |
| Demarked Site Location in Village MapFile: 2 of 7 Demarked Site Location in Google Map.pdf | 4 Jan 2026 |
| of 9 NOC CFE Ack & LetterFile: 2 of 9 NOC CFE Ack & Letter.pdf | 4 Jan 2026 |
| of 10 NOC under section 14 of the KTCP ActFile: 2 of 10 NOC under section 14 of the KTCP Act.pdf | 4 Jan 2026 |
| of 4 Aminites and common Area certified by Engineer SIMHADRIFile: 3 of 4 Aminites and common Area certified by Engineer SIMHADRI.pdf | 4 Jan 2026 |
| of 5 Engineer License with self attestedFile: 3 of 5 Engineer License with self attested.pdf | 4 Jan 2026 |
| of 6 Brief Estimated Cost of Cons certified by Engineer SimhadriFile: 3 of 6 Brief Estimated Cost of Cons certified by Engineer Simhadri.pdf | 4 Jan 2026 |
| of 7 Form-3 Engineer Certificate SimhadriFile: 3 of 7 Form-3 Engineer Certificate Simhadri.pdf | 4 Jan 2026 |
| of 8 CERTIFICATE OF STRUCTURAL SAFETY FOR BUILDING-SimhadriFile: 3 of 8 CERTIFICATE OF STRUCTURAL SAFETY FOR BUILDING-Simhadri.pdf | 4 Jan 2026 |
| of 9 Proforma Of Agreement Of Sale SimgadriFile: 3 of 9 Proforma Of Agreement Of Sale Simgadri.pdf | 4 Jan 2026 |
| of 10 Proforma Allotment Letter SimhadriFile: 3 of 10 Proforma Allotment Letter Simhadri.pdf | 4 Jan 2026 |
| of 12 Land cost calculation sheet as per the guidance value - SimhadriFile: 3 of 12 Land cost calculation sheet as per the guidance value - Simhadri.pdf | 4 Jan 2026 |
| of 13 STP drawing as per KSPCB Norms certified by Engineer SIMHADRIFile: 3 of 13 STP drawing as per KSPCB Norms certified by Engineer SIMHADRI.pdf | 4 Jan 2026 |
| Sale Deed for all the survey numbersFile: Sale Deed.pdf | 4 Jan 2026 |
| Court Order favour of Land OwnersFile: Mother Deed.pdf | 4 Jan 2026 |
| of 2 CA Cerificate SimhadriFile: 1 of 2 CA Cerificate Simhadri.pdf | 30 Dec 2025 |
| of 3 Affidavit Bank AccFile: 1 of 3 Affidavit Bank Acc.pdf | 30 Dec 2025 |
| of 4 Bank Statements from sing & seal from BankFile: 1 of 4 Bank Statements from sing & seal from Bank.pdf | 30 Dec 2025 |
| of 5 Source Of FundFile: 1 of 5 Source Of Fund.pdf | 30 Dec 2025 |
| of 6 Financial documents of 3yearsFile: 1 of 6 Financial documents of 3years.pdf | 30 Dec 2025 |
| of 1 Layout Work OrderFile: 2 of 1 Layout Work Order.pdf | 30 Dec 2025 |
| of 2 Layout Approved Plans SimhadriFile: 2 of 2 Layout Approved Plans Simhadri.pdf | 30 Dec 2025 |
| of 3 Building LicenseFile: 2 of 3 Building License.pdf | 30 Dec 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SIMHADRI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 11 registered projects within 2 km.
DS MAX SKY SANMAN
DS Max Properties Private Limited
M5 ECHELON
Mahendra Homes Private Limited
BREN PARK CITY
BREN CORPORATION PRIVATE LIMITED
DS MAX SKY STANZA
DS MAX PROPERTIES PRIVATE LIMITED
SATTVA AMRITYA
Sattva Resi Private Limited
HABULUS TRANQUIL
HABULUS BUILDERS AND DEVELOPERS PRIVATE LI
See every Bengaluru Urban project, with the district possession charts
Builder: M/s.SIGNIFA SIMHADRI PROJECTS
M/s.SIGNIFA SIMHADRI PROJECTS has 1 registration on RERA Karnataka, including SIMHADRI. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SIMHADRI is delayed beyond 30 Sep 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SIMHADRI?
The registered promoter entity is M/s.SIGNIFA SIMHADRI PROJECTS, a partnership firm as per the filing. Its GSTIN 29AFGFS2647G1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SIMHADRI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SIMHADRI?
The professionals named in the filing: Architect: Hanumesh G; Engineer: KOMIRI RAMESH; Chartered Accountant: M Balaji. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIMHADRI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback