Registration approved No litigation declared Residential/Group Housing project

Signature 4

By Nazeema Aslam

RG-KA-00682 · RERA PRM/KA/RERA/1251/310/PR/210825/008017 · Last updated on RERA Karnataka portal: 10 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2028Possession promisedno revision filed
6 of 17Construction stages donefurthest along: Masonry Construction, 80%
7 of 12Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 94 documents Report an error

Signature 4 is a Residential/Group Housing project by Nazeema Aslam in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/210825/008017 on 21 Aug 2025. Possession is promised by 31 Dec 2028. 5 of the 12 units on this registration are recorded sold or booked, and 6 of 17 construction stages are filed complete.

At a glance

Project

  • NameSignature 4
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/210825/008017
  • ReraGenie IDRG-KA-00682

Builder

  • NameNazeema Aslam
  • Entity typeProprietorship
  • GSTIN29AFVPN3244B1Z9
  • Authorized SignatoryNazeema Aslam

Key dates

this monthRegisteredAug 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on21 Aug 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Current status

42%5 of 12 units booked
8.4%Of the estimated cost spent so far

Figures as on 10 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Aydin Infra Signature Phase IV---12012

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 10 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 17 construction stages are filed complete. The stage furthest along is Masonry Construction, at 80%.

Building: 58% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction80%
Plastering inside , outside & Ceiling70%
Joinery: Doors, Windows, Ventilators etc30%
Basic work of Water supply, Sanitary and Electrification40%
Dadoing, Skirting, Flooring, Tiles work (All types)25%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing10%
Painting25%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)40%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work50%
Internal and External work including landscapes as per sanctioned drawings15%

Progress on shared amenities40

As on 10 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes5%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes10%
Storm water drainsYes10%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingYes0%
ElectricityYes15%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes20%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes10%
Air ConditioningNoNot applicable
StaircasesYes40%
LiftsYes40%
Corridor/LobbiesYes40%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes28%
BasementYes100%
TerraceYes60%
Outer WallYes60%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesYes20%

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Nazeema Aslam--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 9.00 cr
Cost incurredRs 75.24 lakh
Spent of the estimate8.36%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 7.50 crRs 65.19 lakh
On-site expenditure-Salaries of workersRs 1.00 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 20.00 lakh-
Consultation feesRs 20.00 lakh-
On-site expenditure-Site OverheadRs 10.00 lakhRs 10.05 lakh
Payment of charges-Rs 611

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAni Sambyal
EngineerRamesh Muthu Dasappa
Chartered AccountantSai Rakshith M S

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed94

As listed on the registration, under the names the promoter filed them with; the newest 80 of 94 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/210825/008017 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate.pdf10 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Signature 4.pdf10 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Signature 4.pdf10 Oct 2026
Q2 2026-27 KPTCL- BESCOM10 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - CA Certificate June 26.pdf13 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate June 26.pdf13 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate June 26.pdf13 Jul 2026
Q1 2026-27 Water supply and sewage board13 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - Signature 4-QU Mar 26.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5_Architect Certificate_Signature-4.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6_Engineer Certificate_Signature-4.pdf15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - Signature 4- Dec 25.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architects Signature.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Signature 4 (QU Dec 25).pdf14 Jan 2026
Q3 2025-26 KPTCL- BESCOM14 Jan 2026
BWSSB Noc DeclarationFile: 1 BWSSB Noc Declaration.pdf14 Aug 2025
Query Answer Document 14-08-2025File: Query Answer Document 14-08-2025.pdf14 Aug 2025
Form-1 CA CertificateFile: 1 Form-1 CA Certificate.pdf16 Jul 2025
Bank Account DetailsFile: 2 Bank Account Details.pdf16 Jul 2025
Bank AffidivateFile: 3 Bank Affidivate.pdf16 Jul 2025
EC 2-11-2023 to till dateFile: 4 EC 2-11-2023 to till date.pdf16 Jul 2025
Form BFile: 5 Form B.pdf16 Jul 2025
AGREEMENT FOR SALEFile: 6 AGREEMENT FOR SALE.pdf16 Jul 2025
BESCOM NOCFile: 7 BESCOM NOC.pdf16 Jul 2025
BWSSB Noc DeclarationFile: 7 BWSSB Noc Declaration.pdf16 Jul 2025
Source of water supply 1File: 8 Source of water supply 1.jpeg16 Jul 2025
Source of water supply 2File: 8 Source of water supply 2.jpeg16 Jul 2025
Query Answer Document 16-07-2025File: Query Answer Document 16-07-2025.pdf16 Jul 2025
Source of Fund with supporting documentFile: 1 Source of Fund with supporting document.pdf27 May 2025
Nazeema 1-A BDA KhataFile: 8 Nazeema 1-A BDA Khata.pdf27 May 2025
Declaration for Single plot LayoutFile: 10 Declaration for Single plot Layout.pdf27 May 2025
Declaration for Single plot OrderFile: 11 Declaration for Single plot Order.pdf27 May 2025
BBMP Building PlanFile: 12 BBMP Building Plan.PDF27 May 2025
BBMP Building licenseFile: 13 BBMP Building license.pdf27 May 2025
CDP MapFile: 14 CDP Map.pdf27 May 2025
Village mapFile: 14 Village map.pdf27 May 2025
Zonal RegulationsFile: 16 Zonal Regulations.pdf27 May 2025
Sectional DrawingFile: 18 Sectional Drawing.pdf27 May 2025
Declaration on KSPCB NOCFile: 19 Declaration on KSPCB NOC.pdf27 May 2025
Declaration on SEIAA NOCFile: 20 Declaration on SEIAA NOC.pdf27 May 2025
Reson for delayFile: 25 Reson for delay.pdf27 May 2025
Sold and unsold detailsFile: 25 Sold and unsold details.pdf27 May 2025
Query Answer documentFile: Query Answer document.pdf27 May 2025
Registration CertificateFile: GST Certificate Nazeema Aslam.pdf-
GST CertificateFile: GST Certificate Nazeema Aslam.pdf-
Certificate issued by CA Form 1File: 1 Form-1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: Form 5 Architects Certificate.pdf-
Certificate issued by Engineer Form 3File: Form 6 - Engineers Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: No Litigation Affidavit.pdf-
Balance Sheet 2023 - 2024File: Balance Sheet 2023-24.pdf-
Balance Sheet 2022 - 2023File: Balance Sheet 2022-23.pdf-
Balance Sheet 2021 - 2022File: Balance Sheet 21-22.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Profit and Loss 2023-24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Profit and Loss 2022-23.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Profit and Loss 2021-22.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR 2023-24.pdf-
BBMP Building license-
BBMP Building Plan-
Sectional Drawing-
Structural Stability Certificate-
Project Specfication Sig 4-
Proforma of Allotment Letter-
Sec 3(1) No Violation Affidavit-
Legal Opinion-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Nazeema 1-A BDA Khata-

How this compares with Bengaluru Urban

42%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Signature 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Nazeema Aslam

Nazeema Aslam has 1 registration on RERA Karnataka, including Signature 4. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Signature 4 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Signature 4?

The registered promoter entity is Nazeema Aslam, a proprietorship as per the filing. Its GSTIN 29AFVPN3244B1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Signature 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Signature 4?

The professionals named in the filing: Architect: Ani Sambyal; Engineer: Ramesh Muthu Dasappa; Chartered Accountant: Sai Rakshith M S. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Signature 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Signature 4. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Signature 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.