Home / Browse projects / Bengaluru Urban, Karnataka / Signature 4
Signature 4
RG-KA-00682 · RERA PRM/KA/RERA/1251/310/PR/210825/008017 · Last updated on RERA Karnataka portal: 10 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Signature 4 is a Residential/Group Housing project by Nazeema Aslam in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/210825/008017 on 21 Aug 2025. Possession is promised by 31 Dec 2028. 5 of the 12 units on this registration are recorded sold or booked, and 6 of 17 construction stages are filed complete.
At a glance
Project
- NameSignature 4
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/210825/008017
- ReraGenie IDRG-KA-00682
Builder
- NameNazeema Aslam
- Entity typeProprietorship
- GSTIN29AFVPN3244B1Z9
- Authorized SignatoryNazeema Aslam
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on21 Aug 2025
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed94 files
Current status
Figures as on 10 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Aydin Infra Signature Phase IV | - | - | - | 12 | 0 | 12 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 10 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 17 construction stages are filed complete. The stage furthest along is Masonry Construction, at 80%.
Building: 58% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 80% |
| Plastering inside , outside & Ceiling | 70% |
| Joinery: Doors, Windows, Ventilators etc | 30% |
| Basic work of Water supply, Sanitary and Electrification | 40% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 25% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 10% |
| Painting | 25% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 40% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 50% |
| Internal and External work including landscapes as per sanctioned drawings | 15% |
Progress on shared amenities40
As on 10 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 5% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 10% |
| Storm water drains | Yes | 10% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 15% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 20% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 10% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 40% |
| Lifts | Yes | 40% |
| Corridor/Lobbies | Yes | 40% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 28% |
| Basement | Yes | 100% |
| Terrace | Yes | 60% |
| Outer Wall | Yes | 60% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 20% |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Nazeema Aslam | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 7.50 cr | Rs 65.19 lakh |
| On-site expenditure-Salaries of workers | Rs 1.00 cr | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 20.00 lakh | - |
| Consultation fees | Rs 20.00 lakh | - |
| On-site expenditure-Site Overhead | Rs 10.00 lakh | Rs 10.05 lakh |
| Payment of charges | - | Rs 611 |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ani Sambyal |
| Engineer | Ramesh Muthu Dasappa |
| Chartered Accountant | Sai Rakshith M S |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed94
As listed on the registration, under the names the promoter filed them with; the newest 80 of 94 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/210825/008017 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate.pdf | 10 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Signature 4.pdf | 10 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Signature 4.pdf | 10 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 10 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - CA Certificate June 26.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate June 26.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate June 26.pdf | 13 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 13 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - Signature 4-QU Mar 26.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5_Architect Certificate_Signature-4.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6_Engineer Certificate_Signature-4.pdf | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - Signature 4- Dec 25.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architects Signature.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Signature 4 (QU Dec 25).pdf | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| BWSSB Noc DeclarationFile: 1 BWSSB Noc Declaration.pdf | 14 Aug 2025 |
| Query Answer Document 14-08-2025File: Query Answer Document 14-08-2025.pdf | 14 Aug 2025 |
| Form-1 CA CertificateFile: 1 Form-1 CA Certificate.pdf | 16 Jul 2025 |
| Bank Account DetailsFile: 2 Bank Account Details.pdf | 16 Jul 2025 |
| Bank AffidivateFile: 3 Bank Affidivate.pdf | 16 Jul 2025 |
| EC 2-11-2023 to till dateFile: 4 EC 2-11-2023 to till date.pdf | 16 Jul 2025 |
| Form BFile: 5 Form B.pdf | 16 Jul 2025 |
| AGREEMENT FOR SALEFile: 6 AGREEMENT FOR SALE.pdf | 16 Jul 2025 |
| BESCOM NOCFile: 7 BESCOM NOC.pdf | 16 Jul 2025 |
| BWSSB Noc DeclarationFile: 7 BWSSB Noc Declaration.pdf | 16 Jul 2025 |
| Source of water supply 1File: 8 Source of water supply 1.jpeg | 16 Jul 2025 |
| Source of water supply 2File: 8 Source of water supply 2.jpeg | 16 Jul 2025 |
| Query Answer Document 16-07-2025File: Query Answer Document 16-07-2025.pdf | 16 Jul 2025 |
| Source of Fund with supporting documentFile: 1 Source of Fund with supporting document.pdf | 27 May 2025 |
| Nazeema 1-A BDA KhataFile: 8 Nazeema 1-A BDA Khata.pdf | 27 May 2025 |
| Declaration for Single plot LayoutFile: 10 Declaration for Single plot Layout.pdf | 27 May 2025 |
| Declaration for Single plot OrderFile: 11 Declaration for Single plot Order.pdf | 27 May 2025 |
| BBMP Building PlanFile: 12 BBMP Building Plan.PDF | 27 May 2025 |
| BBMP Building licenseFile: 13 BBMP Building license.pdf | 27 May 2025 |
| CDP MapFile: 14 CDP Map.pdf | 27 May 2025 |
| Village mapFile: 14 Village map.pdf | 27 May 2025 |
| Zonal RegulationsFile: 16 Zonal Regulations.pdf | 27 May 2025 |
| Sectional DrawingFile: 18 Sectional Drawing.pdf | 27 May 2025 |
| Declaration on KSPCB NOCFile: 19 Declaration on KSPCB NOC.pdf | 27 May 2025 |
| Declaration on SEIAA NOCFile: 20 Declaration on SEIAA NOC.pdf | 27 May 2025 |
| Reson for delayFile: 25 Reson for delay.pdf | 27 May 2025 |
| Sold and unsold detailsFile: 25 Sold and unsold details.pdf | 27 May 2025 |
| Query Answer documentFile: Query Answer document.pdf | 27 May 2025 |
| Registration CertificateFile: GST Certificate Nazeema Aslam.pdf | - |
| GST CertificateFile: GST Certificate Nazeema Aslam.pdf | - |
| Certificate issued by CA Form 1File: 1 Form-1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form 5 Architects Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 6 - Engineers Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: No Litigation Affidavit.pdf | - |
| Balance Sheet 2023 - 2024File: Balance Sheet 2023-24.pdf | - |
| Balance Sheet 2022 - 2023File: Balance Sheet 2022-23.pdf | - |
| Balance Sheet 2021 - 2022File: Balance Sheet 21-22.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Profit and Loss 2023-24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Profit and Loss 2022-23.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: Profit and Loss 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: ITR 2023-24.pdf | - |
| BBMP Building license | - |
| BBMP Building Plan | - |
| Sectional Drawing | - |
| Structural Stability Certificate | - |
| Project Specfication Sig 4 | - |
| Proforma of Allotment Letter | - |
| Sec 3(1) No Violation Affidavit | - |
| Legal Opinion | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Nazeema 1-A BDA Khata | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Signature 4 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Nazeema Aslam
Nazeema Aslam has 1 registration on RERA Karnataka, including Signature 4. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Signature 4 is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Signature 4?
The registered promoter entity is Nazeema Aslam, a proprietorship as per the filing. Its GSTIN 29AFVPN3244B1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Signature 4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Signature 4?
The professionals named in the filing: Architect: Ani Sambyal; Engineer: Ramesh Muthu Dasappa; Chartered Accountant: Sai Rakshith M S. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Signature 4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback