Home / Browse projects / Bengaluru Urban, Karnataka / SIERRA GREENS
SIERRA GREENS
RG-KA-15646 · RERA PRM/KA/RERA/1251/308/PR/200526/003414 · Last updated on RERA Karnataka portal: 10 Sep 2026
Source: official RERA Karnataka filing
Red flags
- Completion date moved by 63 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
Saved.
SIERRA GREENS is a Residential/Group Housing project by SIERRA CONSTRUCTIONS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/200526/003414 on 26 May 2020. Possession is promised by 31 Mar 2028. The completion date has moved by 63 months from the original filing. 56 of the 152 units on this registration are recorded sold or booked, and 3 of 15 construction stages are filed complete.
At a glance
Project
- NameSIERRA GREENS
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/200526/003414
- ReraGenie IDRG-KA-15646
Builder
- NameSIERRA CONSTRUCTIONS
- Entity typePartnership Firm
- Authorized SignatorySuraj Menon
- OthersSuraj Menon
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on26 May 2020
- Promised completion31 Mar 2028
- Revised completionRevised to 31 Mar 2028 (originally 16 Dec 2022)
- Buildings3 building records
- Documents filed106 files
Current status
Figures as on 10 Sep 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sierra Greens - Block 1 | - | - | - | 56 | 0 | 56 |
| Sierra Greens - Block 2 | - | - | - | 48 | 0 | 48 |
| Sierra Greens - Block 3 | - | - | - | 48 | 0 | 48 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 10 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 15 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 95%.
Building: 93% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Retaining wall (All types) | Not applicable |
| Plinth level Beam | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | Not applicable |
| RCC or MS Framed structure | 95% |
| Masonry construction: Bricks, Concrete blocks etc | 90% |
| Plastering inside , outside & Ceiling | 90% |
| Joinery: Doors, Windows, Ventilators etc | 90% |
| Basic work of Water supply, Sanitary and Electrification | 90% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 90% |
| Railing and Grill fixing | 90% |
| Electrification, Water supply and Sanitary Finishing | 95% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 90% |
| Painting | 90% |
| Elevation work | 90% |
| Internal and External work including landscapes as per santioned drawings | 90% |
Progress on shared amenities41
As on 10 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 55% |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | Yes | 50% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | 50% |
| Solid waste management and disposal | Yes | 50% |
| Water conservation | Yes | 50% |
| Energy management | Yes | 50% |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | 50% |
| Emergency Evacuation services | Yes | 50% |
| Storm water drains | Yes | 50% |
| Use of renewable energy | Yes | 50% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 50% |
| Electricity | Yes | 55% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 50% |
| Club House | Yes | 50% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 50% |
| Indoor Sports facility | Yes | 50% |
| Swimming Pool | Yes | 50% |
| Gym | Yes | 50% |
| Parks | Yes | 50% |
| Power Backup | Yes | 50% |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | 50% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 95% |
| Lifts | Yes | 95% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 90% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 90% |
| Basement | No | Not applicable |
| Terrace | Yes | 90% |
| Outer Wall | Yes | 90% |
| Open parking areas and common storage spaces | Yes | 90% |
| Provision for lodging of management staff and security staff | Yes | 90% |
| Water conservation and renewable energy | Yes | 90% |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 29.00 cr | Rs 26.67 cr |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ravi and Minu |
| Engineer | M.S.R Consultants |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterothers
No reason recorded in the filing
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed106
As listed on the registration, under the names the promoter filed them with; the newest 80 of 106 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/200526/003414 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| STRUCTURAL STABILITY CERTIFICATEFile: STRUCTURAL STABILITY CERTIFICATE UDAY.pdf | 10 Sep 2026 |
| STRUCTURAL Eng Licence with self atttestedFile: STRUCTURALEng Licence with self atttested.pdf | 10 Sep 2026 |
| Consent LetterFile: Consent letter.pdf | 10 Sep 2026 |
| Consent LetterFile: Consent letter reamaining.pdf | 10 Sep 2026 |
| Consent LetterFile: Consent 1.pdf | 10 Sep 2026 |
| AFFIDAVIT SIERRAFile: AFFIDAVIT SIERRA.pdf | 12 Jun 2026 |
| BESCOM NOCFile: BESCOM NOC.pdf | 12 Jun 2026 |
| Clarification of consent letter TDR as for CDP 2015File: Clarification of consent letter TDR as for CDP 2015.pdf | 12 Jun 2026 |
| Clarification on Deposit of Loan Amount into RERA Designated Project AccountFile: Clarification on Deposit of Loan Amount into RERA Designated Project Account.pdf | 12 Jun 2026 |
| Consent letterFile: Consent letter_compressed.pdf | 12 Jun 2026 |
| Commencement certificateFile: Commencement certificate_compressed.pdf | 12 Jun 2026 |
| Eng member certificateFile: Eng member certificate.pdf | 12 Jun 2026 |
| Form-6 Eng CertFile: Form-6 Eng Cert.pdf | 12 Jun 2026 |
| Ground FLoor PlanFile: Ground FLoor Plan.pdf | 12 Jun 2026 |
| KSPCB NOCFile: KSPCB NOC.pdf | 12 Jun 2026 |
| Land detailsFile: Land details.pdf | 12 Jun 2026 |
| Modification AffidavitFile: Modification Affidavit.pdf | 12 Jun 2026 |
| Modification for FARFile: Modification for FAR.pdf | 12 Jun 2026 |
| Modified building license_compressedFile: Modified building license_compressed.pdf | 12 Jun 2026 |
| Modified Plan-1File: Modified Plan-1_compressed.pdf | 12 Jun 2026 |
| Water NOCFile: Water NOC.pdf | 12 Jun 2026 |
| THIRD FLOOR PLANFile: THIRD FLOOR PLAN.pdf | 12 Jun 2026 |
| STILT FLOOR PLANFile: STILT FLOOR PLAN.pdf | 12 Jun 2026 |
| Source of Fund detailsFile: Source of Fund details.pdf | 12 Jun 2026 |
| SITE AND ELEVATION PLANFile: SITE AND ELEVATION PLAN.pdf | 12 Jun 2026 |
| SEIAA NOCFile: SEIAA NOC.pdf | 12 Jun 2026 |
| Renewed NOCs AffidavitFile: Renewed NOCs Affidavit.pdf | 12 Jun 2026 |
| covering letter for modification plan sanctionFile: Reason for modification plan sanction .pdf | 12 Jun 2026 |
| Modified Plan-2File: Modified Plan-2_compressed.pdf | 12 Jun 2026 |
| Form-4 CA CertFile: Form-4 CA Cert.pdf | 12 Jun 2026 |
| Modified Plan-3File: Modified Plan-3_compressed.pdf | 12 Jun 2026 |
| Modified Plan-4File: Modified Plan-4_compressed.pdf | 12 Jun 2026 |
| Modified Plan-5File: Modified Plan-5_compressed.pdf | 12 Jun 2026 |
| sold and unsold detailsFile: sold and unsold details.pdf | 12 Jun 2026 |
| Modified Plan-6File: Modified Plan-6_compressed.pdf | 12 Jun 2026 |
| Modified Plan-7File: Modified Plan-7_compressed.pdf | 12 Jun 2026 |
| sold and unsold units details and list of allottees with project name and addressFile: sold and unsold units details and list of allottees with project name and address.pdf | 12 Jun 2026 |
| STRUCTURAL STABILITY CERTIFICATEFile: STRUCTURAL STABILITY CERTIFICATE.pdf | 12 Jun 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA REPORT.pdf | 31 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Report.pdf | 31 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Report.pdf | 31 Mar 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 31 Mar 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 31 Mar 2026 |
| Reconstitution of Partnership DeedFile: Reconstitution of Partnership Deed.pdf | 20 May 2020 |
| Form - D - Registered Certificate.File: Form-D Partnership Registration Certificate.pdf | 20 May 2020 |
| Registered Partnership CertificateFile: Form-D Partnership Registration Certificate.pdf | 11 May 2020 |
| Partnership Reconstitution DeedFile: Partnership - Reconstitution Deed.pdf | 11 May 2020 |
| ECFile: EC up to date.pdf | 11 May 2020 |
| Commencement CertificateFile: Commencement Certificate.pdf | 11 May 2020 |
| KSPCB - NOCFile: KSPCB - NOC.pdf | 11 May 2020 |
| BESCOM DepositFile: Bescom Deposits.jpeg | 11 May 2020 |
| Complete Site PlanFile: Complete Site Plan.pdf | 11 May 2020 |
| Stilt Floor PlanFile: Stilt Floor Plan.pdf | 11 May 2020 |
| Ground Floor PlanFile: Ground Floor Plan.pdf | 11 May 2020 |
| Second Floor PlanFile: Second Floor Plan.pdf | 11 May 2020 |
| First and Third Floor PlanFile: First and Third Floor Plan.pdf | 11 May 2020 |
| CertificateFile: Partnership Deed and Certificate.pdf | - |
| Project Details | - |
| Already registered project ongoing detailsFile: SITE AND ELEVATION PLAN.pdf | - |
| Modified plan details site plan, floor plans, Plan Licence LetterFile: Ground FLoor Plan.pdf | - |
| Elevation, Sections, Specifications ( If changes are there )File: SITE AND ELEVATION PLAN.pdf | - |
| List Of AllotteesFile: Form Ex-5 Engineer - Status of work as on date.pdf | - |
| Consent LetterFile: Form Ex-5 Engineer - Status of work as on date.pdf | - |
| Chartered Accountant CertificateFile: Form Ex-5 Engineer - Status of work as on date.pdf | - |
| Notarized AffidavitFile: Architect - Pending work report.pdf | - |
| Engineer CertificateFile: Form Ex-5 Engineer - Status of work as on date.pdf | - |
| Architect CertificateFile: Architect - Pending work report.pdf | - |
| Structural Engineer Certificate for stability of structureFile: Form Ex-5 Engineer - Status of work as on date.pdf | - |
| Modification of Plan DetailsFile: Approved Plan.jpg | - |
| Modification of Plan DetailsFile: Ground FLoor Plan.pdf | - |
| Modification of Plan DetailsFile: SITE AND ELEVATION PLAN.pdf | - |
| Modification of Plan DetailsFile: STILT FLOOR PLAN.pdf | - |
| Modification of Plan DetailsFile: SITE AND ELEVATION PLAN.pdf | - |
| Modification of Plan DetailsFile: STILT FLOOR PLAN.pdf | - |
| Document 1File: State level environment - SEIAA NOC.pdf | - |
| Architect Certificate for Work Completion Schedule till DateFile: RERA EXTENSION FORM -EX1- ARCHITECT.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: RERA ENGINEER EX-5.pdf | - |
| CA Certificate for Funds UtilizationFile: RERA EXTENSION FORM -EX1- ARCHITECT.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: RERA EXTENSION FORM -EX2 - ARCHITECT.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: RERA ENGINEER EX-5.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SIERRA GREENS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 22 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: SIERRA CONSTRUCTIONS
SIERRA CONSTRUCTIONS has 1 registration on RERA Karnataka, including SIERRA GREENS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SIERRA GREENS is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SIERRA GREENS?
The registered promoter entity is SIERRA CONSTRUCTIONS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SIERRA GREENS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SIERRA GREENS?
The professionals named in the filing: Architect: Ravi and Minu; Engineer: M.S.R Consultants. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIERRA GREENS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback