Home / Browse projects / Bengaluru Urban, Karnataka / SIDVIN SYMMETRA
SIDVIN SYMMETRA
RG-KA-68476 · RERA PRM/KA/RERA/1251/308/PR/071026/009001 · Last updated on RERA Karnataka portal: 5 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SIDVIN SYMMETRA is a Residential/Group Housing project by SIDVIN PROPERTIES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/071026/009001 on 7 Oct 2026. Possession is promised by 31 Aug 2031.
At a glance
Project
- NameSIDVIN SYMMETRA
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- 560105
- Pincode560105
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/308/PR/071026/009001
- ReraGenie IDRG-KA-68476
Builder
- NameSIDVIN PROPERTIES
- Entity typePartnership Firm
- GSTIN29AFLFS5542M1Z7
- Authorized SignatoryKANTHA KUMAR R M
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on7 Oct 2026
- Promised completion31 Aug 2031
- Revised completionNone
- Buildings2 building records
- Documents filed81 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 250 | 0 | 250 |
| Tower B | - | - | - | 78 | 0 | 78 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 5 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 5 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | - |
| Gym | No | Not applicable |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership17
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Subhashinamma | - | - |
| H K PRABHAKAR REDDY | - | - |
| PRANITHA M | - | - |
| ANIL P | - | - |
| P LIKITHA | - | - |
| PRATHAP H K | - | - |
| SHASHI KALA K R | - | - |
| VINAY P | - | - |
| RASHMI H P | - | - |
| UDAY H K | - | - |
| RENUKA K | - | - |
| HARSHITH H U | - | - |
| VARSHA H U | - | - |
| RAMACHANDRA REDDY H K | - | - |
| LAVANYA K | - | - |
| YUKTHA R REDDY | - | - |
| AKSHITHA R REDDY | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 241.77 cr | - |
| Administrative Costs | Rs 15.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 4.66 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | INDRANEEL DUTTA |
| Engineer | RAJESH M H |
| Chartered Accountant | CA Raghu Nadha Mandadi G |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed81
As listed on the registration, under the names the promoter filed them with; the newest 80 of 81 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/071026/009001 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Loan Amount ClarificationFile: 1 Loan Amount Clarification.pdf | 5 Oct 2026 |
| Clarification on FinancialsFile: 2 Clarification on Financials.pdf | 5 Oct 2026 |
| Proforma Allotment LetterFile: 1 Proforma Allotment Letter.pdf | 5 Oct 2026 |
| Water Supply Declaration AffidavitFile: 2 Water Supply Declaration Affidavit.pdf | 5 Oct 2026 |
| Estimation Breakup SignedFile: 3 Estimation Breakup Signed.pdf | 5 Oct 2026 |
| STP DrawingFile: 4 STP Drawing.pdf | 5 Oct 2026 |
| RTC, survey 340/1 (Old Sy no 154/8) | - |
| Mutation, survey 340/1 (Old Sy no 154/8) | - |
| Encumbrance Certificate, survey 340/1 (Old Sy no 154/8) | - |
| Conversion/Alienation Order, survey 340/1 (Old Sy no 154/8) | - |
| Sale/Title/Gift Deed, survey 340/1 (Old Sy no 154/8) | - |
| JDA, survey 340/1 (Old Sy no 154/8) | - |
| Khatha, survey 340/1 (Old Sy no 154/8) | - |
| Registration CertificateFile: 2 Firm Registration Certificate Form-C.pdf | - |
| GST CertificateFile: 3 GST Registration Certificate.pdf | - |
| Partnership DeedFile: 4 Amendment of Partnership deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Signed Sidvin Properties Form 1.PDF | - |
| Certificate issued by Architect Form 2File: Form 2 Architect certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non litigation affidavit.pdf | - |
| Balance Sheet 2024 - 2025File: Balance Sheet-2024-25.pdf | - |
| Balance Sheet 2023 - 2024File: Clarification on Financials.pdf | - |
| Balance Sheet 2022 - 2023File: Clarification on Financials.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: Balance Sheet-2024-25.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Clarification on Financials.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Clarification on Financials.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: Balance Sheet-2024-25.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: Clarification on Financials.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: Clarification on Financials.pdf | - |
| BDA Approval Letter | - |
| Plan 1 of 6 | - |
| Plan 2 of 6 | - |
| PRE STABILITY CERTIFICATE - SIDVIN SYMMETRA | - |
| Project Specifications new | - |
| Agreement for sale Sidvin Symmetra | - |
| Proforma Allotment Letter | - |
| form B affidivit | - |
| Sec 3(1) Affidavit | - |
| JD Affidavit | - |
| Legal opinion | - |
| 2-BESCOM NOC | - |
| Water NOC form Grama panchayath | - |
| 7-CFE NOC | - |
| 6-MOEF NOC | - |
| 5-FIRE NOC-SIDVIN HULIMANGALA | - |
| 1-AAI NOC | - |
| 4-BSNL NOC_WITH CHALLAN | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| 1 Sigle Plot Order | - |
| 1 Sigle Plot Site Plan | - |
| Sales Clarification | - |
| Land Calculation Sheet | - |
| 1 Mother Deed 2 | - |
| 3 Mother Deed 1 | - |
| ADLR Sketch | - |
| Village Map Sidvin | - |
| CDP Map Demarcation | - |
| Plan 1 of 6 | - |
| Plan 2 of 6 | - |
| Plan 3 of 6 | - |
| Plan 4 of 6 | - |
| Plan 5 of 6 | - |
| Plan 6 of 6 | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SIDVIN SYMMETRA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 15 registered projects within 2 km.
DS MAX SKY SANMAN
DS Max Properties Private Limited
M5 ECHELON
Mahendra Homes Private Limited
BREN PARK CITY
BREN CORPORATION PRIVATE LIMITED
DS MAX SKY STANZA
DS MAX PROPERTIES PRIVATE LIMITED
SATTVA AMRITYA
Sattva Resi Private Limited
HABULUS TRANQUIL
HABULUS BUILDERS AND DEVELOPERS PRIVATE LI
See every Bengaluru Urban project, with the district possession charts
Builder: SIDVIN PROPERTIES
SIDVIN PROPERTIES has 2 registrations on RERA Karnataka, including SIDVIN SYMMETRA and SIDVIN CELESTE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SIDVIN SYMMETRA is delayed beyond 31 Aug 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SIDVIN SYMMETRA?
The registered promoter entity is SIDVIN PROPERTIES, a partnership firm as per the filing. Its GSTIN 29AFLFS5542M1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SIDVIN SYMMETRA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SIDVIN SYMMETRA?
The professionals named in the filing: Architect: INDRANEEL DUTTA; Engineer: RAJESH M H; Chartered Accountant: CA Raghu Nadha Mandadi G. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SIDVIN SYMMETRA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback