Completed No litigation declared Others project

SIDDHIVINAYAK HEIGHTS

By SIDDHIVINAYAK BUILDTECH

RG-MH-15100 · RERA P51600034123 · Last updated on MahaRERA portal: 16 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Staircases, 95%
28 of 39Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

SIDDHIVINAYAK HEIGHTS is a Others project by SIDDHIVINAYAK BUILDTECH in Nashik, Maharashtra, registered with MahaRERA as P51600034123 on 24 Mar 2022. The registration is recorded completed; possession was promised by 31 Dec 2026. 11 of the 39 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSIDDHIVINAYAK HEIGHTS
  • TypeOthers
  • Location
    • OLD JANORI ROAD
    • NEAR SHIVAJI NAGAR
    • OZAR (MIG)
    • NASHIK
    • Ozar (CT)
    • Niphad
    • Nashik
    • 422206
  • Pincode422206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600034123
  • ReraGenie IDRG-MH-15100

Builder

  • NameSIDDHIVINAYAK BUILDTECH
  • Entity typePartnership
  • PartnersSHAMKANT DADASAHEB JAGTAP, ANANT NARAYAN HIRAY, SACHIN PRABHAKAR ADHAV, EKNATH LAXMAN AHIRE
  • Other registrations5 more →
  • Completed4 of 6
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2022PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Mar 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Current status

28%11 of 39 units booked
66.9%Work done, per cost certificate

Figures as on 16 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIDDHIVINAYAK HEIGHTSNA5530939

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

SIDDHIVINAYAK HEIGHTS: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered7
Open Space1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area880 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2025

Approvals and building plan

Sanctioning authorityNashik Metropolitan Region Development Authority
Permissible FSI1970.21
Proposed, not sanctioned1,970 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOjhar Tambat Mahabank Building Old Agra Road, Ojhar, Teh Niphad Pincode 422206
Estimated costRs 4.00 cr
Cost incurredRs 2.68 cr
Work done66.92%
BuildingWingEstimatedIncurred
SIDDHIVINAYAK HEIGHTSNARs 4.00 crRs 2.68 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMOL BHASKAR KHARDE
EngineerGANESH MOHAN BORSE
EngineerNikhil C Rahane
Chartered AccountantCA PARESH SABADRA
Chartered AccountantRSPH & Associates
Chartered AccountantP N Sabadra & Associates
PartnerRole in project
SIDDHIVINAYAK BUILDTECH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Occupancy Certificate.pdf16 Jan 2026
Form 5 (FY 2024-2025)File: RA - 2024-25-.pdf5 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A_ March 2025.pdf28 Nov 2025
Withdrawal Update Form 1File: Architect Cert sept 25.pdf20 Nov 2025
Withdrawal Update Form 2File: ER - sept 25 final.pdf20 Nov 2025
Withdrawal Update Form 3File: CA - sept 25_final.pdf20 Nov 2025
Form 1File: AR - Dec 24.pdf25 Sep 2025
Form 2File: ER - Dec 24.pdf25 Sep 2025
Form 3File: Final CA - Dec 24.pdf25 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 24.pdf25 Sep 2025
Form 1File: AR - Sep 24.pdf25 Sep 2025
Form 2File: ER - Sep 24.pdf25 Sep 2025
Form 3File: Final CA - Sep 24.pdf25 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Sep 24.pdf25 Sep 2025
Form 1File: AR certificate jun 24.pdf25 Sep 2025
Form 2File: ER certificate jun 24.pdf25 Sep 2025
Form 3File: Final CA Certificate Jun 24.pdf25 Sep 2025
Disclosure of Sold and Booked InventoryFile: Dis - June 24.pdf25 Sep 2025
Form 1File: Architect Certificate March 24.pdf25 Sep 2025
Form 2File: ER Certificate Mar 24.pdf25 Sep 2025
Form 3File: CA Certificate March 2024Final.pdf25 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE March24.pdf25 Sep 2025
Form 1File: Architect Certificate Dec 23.pdf25 Sep 2025
Form 2File: ER Certificate Dec 23.pdf25 Sep 2025
Form 3File: CA Certificate Dec 2023 Final Signed copy.pdf25 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE Dec23.pdf25 Sep 2025
Form 5 (FY 2022-2023)File: RA Audit 22-23 Final Signed Copy.pdf25 Sep 2025
Form 5 (FY 2023-2024)File: FORM 5 Final.pdf25 Sep 2025
Withdrawal Update Form 1File: Architect jun 25 final.pdf18 Sep 2025
Withdrawal Update Form 2File: Engineer jun 25.pdf18 Sep 2025
Withdrawal Update Form 3File: CA jun 25 final.pdf18 Sep 2025
Form 1File: Architech Certificate FORM - 01.pdf17 Jul 2025
Form 2File: Engineer Certificate FORM - 02.pdf17 Jul 2025
Form 3File: CA Certificate FORM - 03.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - March 25.pdf17 Jul 2025
Disclosure of sold/ booked inventoryFile: Dis - June 24.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR - Sep 24.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR - Dec 24.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA - Sep 24.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA - Dec 24.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER - Sep 24.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER - Dec 24.pdf29 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure - Sep 24.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure - Dec 24.pdf28 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR certificate.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3 siddhivinayak_compressed.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER certificate.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ER certificate.pdf20 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Final.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR March 23.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR JUNE 23.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR SEP 23.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Sep 23.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Jun 23.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Mar 23.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER March 23.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER JUNE 23.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Cert 23.pdf28 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE Dec23.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE March24.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 24.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 2024Final.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificate Mar 24.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec 23.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec 2023 Final Signed copy.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificate Dec 23.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RA Audit 22-23 Final Signed Copy.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate _signed.pdf2 Feb 2023
Layout approvalFile: IMG_20220318_144111.pdf18 Mar 2022
Building plan approvalFile: IMG_20220318_144111.pdf18 Mar 2022
Copy of Layout Approval (in case of layout)File: IMG_20220318_144111.pdf18 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: IMG_20220318_144111.pdf18 Mar 2022
Proforma of Allotment letterFile: Allotment Letter_Siddhivinayak Heights.pdf18 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Siddhivinayak CA certificate Signed.pdf16 Mar 2022
PAN CardFile: Firm Pan Card.pdf11 Mar 2022
Copy of the legal title reportFile: Title Report_001.pdf11 Mar 2022
Details of encumbrancesFile: Encumbrance.pdf11 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement .pdf11 Mar 2022
Declaration about Commencement CertificateFile: FORM D.pdf11 Mar 2022

How this compares with Nashik

28%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SIDDHIVINAYAK HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SHIVAJI NAGAR, OZAR (MIG), NASHIK4,100+ in Nashik

2 kmSIDDHIVINAYAK HEIGHTSCompleted 4Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: SIDDHIVINAYAK BUILDTECH

SIDDHIVINAYAK BUILDTECH has 6 registrations on MahaRERA, including ATHARVA SANSKRUTI and ATHARVA VISHWA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SIDDHIVINAYAK HEIGHTS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SIDDHIVINAYAK HEIGHTS?

The registered promoter entity is SIDDHIVINAYAK BUILDTECH, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SIDDHIVINAYAK HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SIDDHIVINAYAK HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SIDDHIVINAYAK HEIGHTS?

The professionals named in the filing: Architect: AMOL BHASKAR KHARDE; Engineer: GANESH MOHAN BORSE; Engineer: Nikhil C Rahane; Chartered Accountant: CA PARESH SABADRA; Chartered Accountant: RSPH & Associates; Chartered Accountant: P N Sabadra & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SIDDHIVINAYAK HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SIDDHIVINAYAK HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SIDDHIVINAYAK HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.