Home / Browse projects / Bengaluru Urban, Karnataka / SHRIRAM BLUE
SHRIRAM BLUE
By MAARS INFRA DEVELOPERS PRIVATE LIMITED
RG-KA-67168 · RERA PRM/KA/RERA/1251/446/PR/180728/001966 · Last updated on RERA Karnataka portal: 7 May 2022
Source: official RERA Karnataka filing
Red flags
- 32 complaints at RERA Karnataka
- Completion date moved by 28 months
- 3 extensions taken
Clear
- Separate project account declared
Saved.
SHRIRAM BLUE is a Residential/Group Housing project by MAARS INFRA DEVELOPERS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/180728/001966 on 28 Jul 2018. Possession is promised by 30 Nov 2023. The completion date has moved by 28 months from the original filing. 32 complaints are on record with the regulator.
At a glance
Project
- NameSHRIRAM BLUE
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/180728/001966
- ReraGenie IDRG-KA-67168
Builder
- NameMAARS INFRA DEVELOPERS PRIVATE LIMITED
- Entity typeCompany
- CINU70102KA2010PTC052472
- Authorized SignatoryVENKATASUBRAMANI MUTHUKALI CHETTIAR KALISANKARAN MUTHUKALI
- OthersVenugopal U
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on28 Jul 2018
- Promised completion30 Nov 2023
- Revised completionRevised to 30 Nov 2023 (originally 16 Jul 2021)
- Buildings11 building records
- Documents filed107 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 42 | 0 | 42 |
| B | - | - | - | 42 | 0 | 42 |
| C | - | - | - | 42 | 0 | 42 |
| D | - | - | - | 42 | 0 | 42 |
| E | - | - | - | 42 | 0 | 42 |
| F | - | - | - | 48 | 0 | 48 |
| G | - | - | - | 42 | 0 | 42 |
| H | - | - | - | 42 | 0 | 42 |
| J | - | - | - | 45 | 0 | 45 |
| K | - | - | - | 42 | 0 | 42 |
| L | - | - | - | 42 | 0 | 42 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 7 May 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 7 May 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Khan Global Engineering Consultants Pvt. Ltd |
| Engineer | Khan Global Engineering Consultants Pvt. Ltd |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterForce Majeure
No reason recorded in the filing
Complaints filed with RERA Karnataka32
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/190328/0002479 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 28/03/2019 |
| CMP/190328/0002531 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 28/03/2019 |
| CMP/191203/0004863 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 03/12/2019 |
| CMP/210322/0007808 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 22/03/2021 |
| 00145/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 31/01/2023 |
| 00173/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 07/02/2023 |
| 00184/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 09/02/2023 |
| 00225/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 22/02/2023 |
| 00227/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 22/02/2023 |
| 00238/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 23/02/2023 |
| 00247/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 24/02/2023 |
| 00248/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 24/02/2023 |
| 00252/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 27/02/2023 |
| 00327/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 14/03/2023 |
| 00338/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 16/03/2023 |
| 00421/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 03/04/2023 |
| 00491/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 15/04/2023 |
| 00513/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 18/04/2023 |
| 00530/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 20/04/2023 |
| 00555/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 25/04/2023 |
| 00714/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 08/05/2023 |
| 00719/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 09/05/2023 |
| 00767/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 18/05/2023 |
| 00851/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 30/05/2023 |
| 00910/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 07/06/2023 |
| 01092/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 13/07/2023 |
| 01465/2023 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 21/09/2023 |
| 00052/2024 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 11/01/2024 |
| 00254/2024 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 07/03/2024 |
| 00899/2024 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 17/09/2024 |
| 01191/2024 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 19/11/2024 |
| 00876/2025 | - | MAARS INFRA DEVELOPERS PRIVATE LIMITED | 30/06/2025 |
Documents filed107
As listed on the registration, under the names the promoter filed them with; the newest 80 of 107 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/180728/001966 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Clarifications for BWSSB NOCFile: clause no-42 of sanction plan.pdf | 7 May 2022 |
| Sanction Plan - Clause highlightedFile: BLUE-Sanction Plan-Higlighted with condition no-42.pdf | 7 May 2022 |
| Afidavit - BWSSB NOCFile: Affadvit for NOC -BWSSB-BLUE-Rera Extension.pdf | 7 May 2022 |
| Renewed KSPCB NOCFile: 1 Affedevit for KSPCB NOC extension with Old NOC.pdf | 4 Apr 2022 |
| brief abstract of Sold and unsold details listFile: 2 Brief abstract for Sold and Unsold details list.pdf | 4 Apr 2022 |
| Affidavit abiding to pay compensation event due to delay as per Section of RERA ActFile: 3 Affidavit for extension as asked by RERA under section 18-1 act.pdf | 4 Apr 2022 |
| main contractor detailsFile: 4 Contractor details.pdf | 4 Apr 2022 |
| cost details enclosed CA certificateFile: 5 CA certficate for Cost details of Project.pdf | 4 Apr 2022 |
| the Area detailsFile: 6 Area Details As per sanction Plan.pdf | 4 Apr 2022 |
| NOC issued by BESCOMFile: 7 Affidavit for BESCOM NOC extension with Old NOC.pdf | 4 Apr 2022 |
| acknowledgment for BWSSB NOC applicationFile: 7 acknowledgement for BWSSB NOC application.pdf | 4 Apr 2022 |
| Legible copy of Fire force NOCFile: 8 Fire NOC.pdf | 4 Apr 2022 |
| Legible copy of Airport NOCFile: 8 AAI NOC.pdf | 4 Apr 2022 |
| Certificate from Registered Engineer indicating the structural safety of the buildingFile: 9 Structural stability certificate.pdf | 4 Apr 2022 |
| STP design drawingsFile: 10 STP design drawings.pdf | 4 Apr 2022 |
| Request letter for NOCs extensionFile: 11Request letter for NOC extension.pdf | 4 Apr 2022 |
| CertificateFile: 001 COI.pdf | - |
| Project Details | - |
| Architect Certificate for Work Completion Schedule till DateFile: Arc certificate - status of work as on date.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate for work completion schedule as on date.pdf | - |
| CA Certificate for Funds UtilizationFile: Form EX3 - Maars Infra Developers Private Limited.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Arc certificate - work pending.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Engineer Certificate for pending work completion schedule as on date.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: Form Ex4 - Maars Infra Developers Private Limited.pdf | - |
| AffidavitFile: Blue - Affidavit for extension.pdf | - |
| Latest Encumbrance CertificateFile: EC From 01-12-2021 TO 31-01-2022 (1).pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SOLD UNSOLD SUMMARY.xlsx | - |
| Document 1File: Blue - Form B.pdf | - |
| Document 2File: BLUE-Site plan with STP demarcation.pdf | - |
| Document 3File: Rera Extension Certificate due to Covid.pdf | - |
| Document 4File: Proforma Sale deed.pdf | - |
| Document 5File: Proforma allotment Letter.pdf | - |
| Document 6File: LATITTUDE AND LONGITUDE DETAILS OF PROJECT SHRIRAM BLUE.pdf | - |
| SWARSZAWA18071712060 | - |
| Site Plan | - |
| 014 VSP BDA DP | - |
| New Sale Deed Maars Infra - Seegehalli | - |
| PDF Draft AGREEMENT FOR SALE Seegehalli dtd 16-07-2018 1111 (2) | - |
| 017 Sale deed & RTC | - |
| Section S1 -2 Blg 2 fghj | - |
| 015 VSP BDA DP | - |
| PDF Draft Proforma-Letter of Allotment Shriram Blue 16-07-2018 | - |
| 021 Brocher | - |
| 023 Specifications for Shriram Blue | - |
| EC 12 YRS 2004 TO TILL DATE | - |
| 026 Katha | - |
| 024 Development Agreement | - |
| 030 Conversion Orders, MR and RTC of Seegehalli Village | - |
| Conversion Order | - |
| NOT APPLICABPLE | - |
| 030 Conversion Orders, MR and RTC of Seegehalli Village | - |
| NOT APPLICABPLE | - |
| 054 Relinquishment Deed V S S Property dated 27 March 2018 | - |
| 032 NOC Fire Force for Seegeehalli Project - VS Property | - |
| 033 NOC Airport Authority of India VSS Property Project Seegehalli K R Puram | - |
| 034 NOC BESCOM VSS Property Project Seegehalli K R Puram | - |
| APPLIED YET TO RECEIVE | - |
| 036 KSPCB VSS Property Seegehalli K R Puram dated 18 June 2018 | - |
| 037 NOC SEIAA Karnataka MOEF NOC VSS Project Seegehalli K R Puram | - |
| 038 NOC BSNL VSS Property Project Seegehalli K R Puram | - |
| NOT APPLICABPLE | - |
| Unnamed document | - |
| NOT APPLICABPLE | - |
| NOT APPLICABPLE | - |
| NOT APPLICABPLE | - |
| NOT APPLICABPLE | - |
| NOT APPLICABPLE | - |
| NOT APPLICABPLE | - |
| NOT APPLICABPLE | - |
| 045 SECTION - S1 S2-A13 SECTIONS - S1 & S2 | - |
| 040 VSP BDA DP | - |
| 041 SECTION - S1 S2-A13 SECTIONS - S1 & S2 | - |
| 030 Conversion Orders, MR and RTC of Seegehalli Village | - |
| Title Report - Kusma | - |
| Balance Sheet 2016 - 2017File: Balance sheet 2017.pdf | - |
| Balance Sheet 2015 - 2016File: Balance Sheet 2016.pdf | - |
| Balance Sheet 2014 - 2015File: Balance sheet 2015.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: P&L 2017.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: 20180712_124155.jpg | - |
| Audited Profit and Loss Statement 2014 - 2015File: 20180712_124155.jpg | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SHRIRAM BLUE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 52 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: MAARS INFRA DEVELOPERS PRIVATE LIMITED
MAARS INFRA DEVELOPERS PRIVATE LIMITED has 1 registration on RERA Karnataka, including SHRIRAM BLUE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SHRIRAM BLUE is delayed beyond 30 Nov 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SHRIRAM BLUE?
The registered promoter entity is MAARS INFRA DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U70102KA2010PTC052472 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SHRIRAM BLUE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SHRIRAM BLUE?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at SHRIRAM BLUE?
The professionals named in the filing: Architect: Khan Global Engineering Consultants Pvt. Ltd; Engineer: Khan Global Engineering Consultants Pvt. Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHRIRAM BLUE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.