Red flags

  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Feb 2021Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 70 documents Report an error

SHREE SAI ANUGRAHA APARTMENTS is a Residential/Group Housing project by GK ENGINEERS & CONTRACTORS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190220/002439 on 20 Feb 2019. Possession is promised by 27 Feb 2021. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameSHREE SAI ANUGRAHA APARTMENTS
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/190220/002439
  • ReraGenie IDRG-KA-07801

Builder

  • NameGK ENGINEERS & CONTRACTORS
  • Entity typePartnership Firm
  • Authorized SignatoryGIRISH M.K
  • Board MembersS VENKATESH, SURA KRISHNAMURTHY, T.S BADREESH, P.S SARATHI PRASAD

Key dates

this monthRegisteredFeb 2019First promiseFeb 2020Revised toFeb 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Feb 2019
  • Promised completion27 Feb 2021
  • Revised completionRevised to 27 Feb 2021 (originally 28 Feb 2020)
  • Buildings1 building record
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sree Sai Anugraha Apartment---10010

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area611 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.50 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionFeb 2020 → Aug 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/200908/002439Aug 2021 → Feb 2021

Reason as filed by the promoterFinancial crunch

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed70

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190220/002439 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: GK Engineers_Partnership Deed & Certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architects certificate for status of work.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Cerficate for Status of Work.pdf-
CA Certificate for Funds UtilizationFile: CA Fund Utilization certificate.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architects Certifcate for Pending work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer Cerficate For Pending Work.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate for Funds Required.pdf-
AffidavitFile: RERA Affidavit.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold and unsold units detials.xlsx-
Document 1File: Commencement Certificate.pdf-
Document 2File: Bank Statement.pdf-
Document 3File: Applied for bank acc change.pdf-
Document 4File: RERA Account Statement.pdf-
Document 5File: Old Bank Statment.pdf-
Commencement Certificate-
Approved Building Plan-
Approved Building Plan-
Performa of Sale deed-
Performa Agreement for Sale-
Sale Deed & RTC-
Existing Section Plan_Declearation-
Area Development Plan of project area-
Proforma of Allotment Letter-
Brouchure_Declearation-
Details of the structure_project specification_GK ENGINEERS-
EC_GK Engineers-
Section3(1) Notorized_GK Engineers-
Khatha-
Sale Deed & RTC-
Any other document_Title Documents-
Sectional Drawing_ Building Specification_Declearation-
Existing Layout Plan_Declearation-
Existing Section Plan_Declearation-
Change of land use_Declearation-
Balance Sheet 2017 - 2018File: Balance sheet _2018.pdf-
Balance Sheet 2016 - 2017File: Balance sheet _2017.pdf-
Balance Sheet 2015 - 2016File: Balance sheet _2016.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Audited Profit loss statement _2018.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Audited Profit loss statement _2017.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Audited Profit loss statement_2016.pdf-
Director's Report 2017 - 2018File: Director's Report_NA.pdf-
Director's Report 2016 - 2017File: Director's Report_NA.pdf-
Director's Report 2015 - 2016File: Director's Report_NA.pdf-
Cash Flow Statement 2017 - 2018File: Cash Flow Statement _2018.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow Statement _2017.pdf-
Auditor's Report 2017 - 2018File: Auditor Report_2018-ilovepdf-compressed.pdf-
Auditor's Report 2016 - 2017File: Auditor Report_2018-ilovepdf-compressed.pdf-
Auditor's Report 2015 - 2016File: Auditor Report_2018-ilovepdf-compressed.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: Income Tax Return Acknowledgement_2018.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Income Tax Return Acknowledgement_2017.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Income Tax Return Acknowledgement_2016.pdf-
Form-B_GK Engineers-
Prospectus/BrochureFile: Brochure.pdf-
Advertisement Copy 1File: Brochure.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_190220_002439.xlsx-
Stability CertificateFile: Structural stability Certificate.pdf-
Road cutting permission letter issued by the planning Authority for laying Water supply line, sanitary line, UFile: Road Cutting Permission Letter.pdf-
Occupancy CertificateFile: Occupancy Certificate.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Lift Inspectorate.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM TRANFORMER DG.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB Sanction Letter.pdf-
Architect certificate for having completed the work(in format no 5)File: F5 Architect and F6 Engineer for COMPLETION.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: F4 CC CA for COMPLETION.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit for Completion of the Project.pdf-
BESCOM ApprovalFile: BESCOM Approval.pdf-
DG InspectorateFile: DG Inspectorate.pdf-
Transformer InspectorateFile: Transformer Inspectorate.pdf-
F5 Architect for COMPLETIONFile: F5 Architect for COMPLETION.pdf-
F6 Engineer for COMPLETIONFile: F6 Engineer for COMPLETION.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SHREE SAI ANUGRAHA APARTMENTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSHREE SAI ANUGRAHA APARTOther 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: GK ENGINEERS & CONTRACTORS

GK ENGINEERS & CONTRACTORS has 1 registration on RERA Karnataka, including SHREE SAI ANUGRAHA APARTMENTS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SHREE SAI ANUGRAHA APARTMENTS is delayed beyond 27 Feb 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHREE SAI ANUGRAHA APARTMENTS?

The registered promoter entity is GK ENGINEERS & CONTRACTORS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHREE SAI ANUGRAHA APARTMENTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in SHREE SAI ANUGRAHA APARTMENTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SAI ANUGRAHA APARTMENTS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SAI ANUGRAHA APARTMENTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.