Home / Browse projects / Palghar, Maharashtra / SHREE GANESH HERITAGE
SHREE GANESH HERITAGE
RG-MH-57769 · RERA P99000032281 · Last updated on MahaRERA portal: 22 Jun 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE GANESH HERITAGE is a Others project by HIMANSHU SHYAM TENDULKAR in Palghar, Maharashtra, registered with MahaRERA as P99000032281 on 22 Dec 2021. The registration is recorded completed; possession was promised by 31 Oct 2024.
At a glance
Project
- NameSHREE GANESH HERITAGE
- TypeOthers
- Location
- BHASKAR GANESH LANE
- JAWHAR
- Jawhar (M Cl)
- Palghar
- 401603
- Pincode401603
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000032281
- ReraGenie IDRG-MH-57769
Builder
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Dec 2021
- Promised completion31 Oct 2024
- Revised completionNone
- Buildings1 building record
- Documents filed63 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE GANESH HERITAGE | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SHREE GANESH HERITAGE: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 22 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
| CCTV SECURITY | Yes | 100% |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ANIL BHASKAR MULE | Jawhar (M Cl) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AMOL KULKARNI |
| Engineer | RAGENDRA GOKULNATH BIRLA |
| Chartered Accountant | MS KARVE |
| Partner | Role in project |
|---|---|
| HIMANSHU SHAM TENDULKAR | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Nov 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Jun 2024
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf | 22 Jun 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 completion.pdf | 22 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2023-2024_compressed.pdf | 30 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 2023-2024_compressed.pdf | 8 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 31-03-2024.pdf | 2 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 30-03-2024_compressed.pdf | 30 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 95 UPLOAD_compressed.pdf | 20 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 95 _compressed.pdf | 20 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 30-06-2022.pdf | 9 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 90_compressed.pdf | 8 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 31-12-2023_compressed (1).pdf | 2 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 30-12-2023.pdf | 30 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 30-09-2023_compressed.pdf | 2 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 30-09-2023_compressed.pdf | 30 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 90_compressed.pdf | 22 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 22 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FOR UPLOAD 2022-23 SGH.pdf | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 10 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 30-06-2023-compressed (1).pdf | 1 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: 31-05-2023.pdf | 31 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FOR UPLOAD 2022-23 SGH.pdf | 6 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 14 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1_compressed.pdf | 14 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 31-3-2023_compressed.pdf | 4 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: 27-02-2023.pdf | 27 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 22-12-21 TO 31-3-22.pdf | 24 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 12-11-22.pdf | 21 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 14-11-22.pdf | 21 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 17-11-22.pdf | 21 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 31-12-2022.pdf | 2 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: 24-11-22 sold inventory.pdf | 24 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 30-09-22.pdf | 3 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: 1.pdf | 8 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: sold inventory.pdf | 8 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 1-converted-compressed.pdf | 4 Apr 2022 |
| Copy of the legal title reportFile: SEARCH REPORT.pdf | 16 Dec 2021 |
| Copy of the legal title reportFile: PROPERTY CARD.pdf | 16 Dec 2021 |
| Proforma of Allotment letterFile: Muley Residency Sampal Agreement to sale Final (2).pdf | 2 Dec 2021 |
| CERSAI detailsFile: CERSAI_Search_Report_200225715012_For_Asset_Based_Search_11_12_2021_12_09_52_538.pdf | 27 Nov 2021 |
| Layout approvalFile: PLAN 1.pdf | 26 Nov 2021 |
| Layout approvalFile: PLAN 2.pdf | 26 Nov 2021 |
| Layout approvalFile: PLAN 3.pdf | 26 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: PLAN 1.pdf | 26 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: PLAN 2.pdf | 26 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: PLAN 3.pdf | 26 Nov 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 26 Nov 2021 |
| Declaration about Commencement CertificateFile: 001-converted.pdf | 17 Nov 2021 |
| Declaration in FORM BFile: Affidavit cum Declaration ARYA DEV.pdf | 16 Nov 2021 |
| Building plan approvalFile: PLAN 1.pdf | 18 Oct 2021 |
| Building plan approvalFile: PLAN 2.pdf | 18 Oct 2021 |
| Building plan approvalFile: PLAN 3.pdf | 18 Oct 2021 |
| PAN CardFile: pan card.pdf | 18 Oct 2021 |
| Copy of the legal title reportFile: Legal report-converted.pdf | 18 Oct 2021 |
| Details of encumbrancesFile: Emcumbrances.pdf | 18 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf | 18 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf | 18 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 3.pdf | 18 Oct 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certificate-min_compressed (1).pdf | 18 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate-min.pdf | 18 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 18 Oct 2021 |
| Proforma of Allotment letterFile: alloutment letter.pdf | 18 Oct 2021 |
| OtherFile: SHREE GANESH HERITAGE.pdf | 18 Oct 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHIV ARYA | JAWHAR | 4 | Completed | Sep 2013 | Sep 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
Keep SHREE GANESH HERITAGE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near JAWHAR3,200+ in Palghar
Filed coordinates, straight-line distance. 316 registered projects within 2 km.
THE EMPIRE
SHAHJI INFRA
Ahmad Residency
Kadar Gaffar Kargathra
DURVANKUR HEIGHTS
HIMANSHU SHYAM TENDULKAR
GULMOHAR AVENUE
HIMANSHU SHYAM TENDULKAR
MANNAT REGENCY
HIMANSHU SHYAM TENDULKAR
Noor Residency
New Creative Construction
See every Palghar project, with the district possession charts
Builder: HIMANSHU SHYAM TENDULKAR
HIMANSHU SHYAM TENDULKAR has 8 registrations on MahaRERA, including RENUKA RESIDENCY and SHIV PARADISE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if SHREE GANESH HERITAGE is delayed beyond 31 Oct 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE GANESH HERITAGE?
The registered promoter entity is HIMANSHU SHYAM TENDULKAR, an individual as per the filing. Its GSTIN 27ACSPT4313K1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE GANESH HERITAGE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE GANESH HERITAGE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE GANESH HERITAGE?
The professionals named in the filing: Architect: AMOL KULKARNI; Engineer: RAGENDRA GOKULNATH BIRLA; Chartered Accountant: MS KARVE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE GANESH HERITAGE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback