Registration approved Residential/Group Housing project

SHRAVANEE VISTA GARDENIA

By SHRAVANEE SHELTERS

RG-KA-37766 · RERA PRM/KA/RERA/1251/310/PR/171102/001888

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Aug 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 42 documents Report an error

SHRAVANEE VISTA GARDENIA is a Residential/Group Housing project by SHRAVANEE SHELTERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171102/001888 on 2 Nov 2017. Possession is promised by 8 Aug 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameSHRAVANEE VISTA GARDENIA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/171102/001888
  • ReraGenie IDRG-KA-37766

Builder

  • NameSHRAVANEE SHELTERS
  • Entity typePartnership Firm
  • Authorized SignatorySmt.SHAILAJA HANUMESH

Key dates

this monthRegisteredNov 2017First promiseAug 2019Revised toAug 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on2 Nov 2017
  • Promised completion8 Aug 2020
  • Revised completionRevised to 8 Aug 2020 (originally 8 Aug 2019)
  • Buildings1 building record
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shravanee Vista Gardenia---13013

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing workNot applicable
Retaining wall (All types)Not applicable
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,323 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 20.00 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionAug 2019 → May 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/200226/001888May 2021 → Aug 2020

Reason as filed by the promoterCustomers want modification in interiors

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed42

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171102/001888 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Form C.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Arch Certificate Status.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg Work Status on Date.pdf-
CA Certificate for Funds UtilizationFile: CA Fund Utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arch Pending Certificate.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg Pending Works.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Funds Req Certificate.pdf-
AffidavitFile: Form B Declaration- Proj Extension.pdf-
Latest Encumbrance CertificateFile: EC Latest.pdf-
Consent letter from 2/3rd of AllotteesFile: Consent.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Consent Letter - Allotees - RERA - to upload.pdf-
Document 2File: 510101000023603 01042018 to 31072019.pdf-
Document 3File: Fund Utilization - to upload.pdf-
Document 4File: Affidavit PE.pdf-
CC- Shravanee Shelters-
Shravanee Shelters Sanction Plan-
Format Sale Deed-
Agreement for Sale-
Sale Deed-
Shravanee Shelters Sanction Plan-
Agreement for Sale-
Shravanee Vista Gardenia Brouchure-
ALL Noc-
Project Specifications-
EC-
Khatha Certificate & Extract-
JDA Shravanee Shelters-
Balance Sheet 2015 - 2016File: B S.pdf-
Balance Sheet 2014 - 2015File: B S.pdf-
Balance Sheet 2013 - 2014File: B S.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P & L.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow 2015-16.pdf-
Cash Flow Statement 2014 - 2015File: Cash Flow 2014-15.pdf-
Auditor's Report 2015 - 2016File: Audit Report to submit.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR 2014-15.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: ITR.pdf-
Form B-
Prospectus/BrochureFile: Shravanee Vista Gardenia Brouchure.pdf-
Advertisement Copy 1File: NOT GIVEN.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_171102_001888.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SHRAVANEE VISTA GARDENIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SHRAVANEE SHELTERS

SHRAVANEE SHELTERS has 1 registration on RERA Karnataka, including SHRAVANEE VISTA GARDENIA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SHRAVANEE VISTA GARDENIA is delayed beyond 8 Aug 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHRAVANEE VISTA GARDENIA?

The registered promoter entity is SHRAVANEE SHELTERS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHRAVANEE VISTA GARDENIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in SHRAVANEE VISTA GARDENIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRAVANEE VISTA GARDENIA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRAVANEE VISTA GARDENIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.