RG-KA-83212 · RERA PRM/KA/RERA/1251/310/PR/090125/007370 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SHRAVANEE ICON is a Residential/Group Housing project by M/S SHRAVANEE HOLDINGSS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/090125/007370 on 9 Jan 2025. Possession is promised by 31 Dec 2026. 17 of the 29 units on this registration are recorded sold or booked, and 6 of 17 construction stages are filed complete.
At a glance
Project
- NameSHRAVANEE ICON
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/090125/007370
- ReraGenie IDRG-KA-83212
Builder
- NameM/S SHRAVANEE HOLDINGSS
- Entity typePartnership Firm
- GSTIN29ACOFS1876L1Z7
- Authorized SignatoryShailaja Hanumesh
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on9 Jan 2025
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed125 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHRAVANEE ICON | - | - | - | 29 | 0 | 29 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 17 construction stages are filed complete. The stage furthest along is Masonry Construction, at 95%.
Building: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 95% |
| Plastering inside , outside & Ceiling | 95% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 75% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 85% |
| Railing and Grill fixing | 70% |
| Electrification, Water supply and Sanitary Finishing | 85% |
| Painting | 75% |
| Fire prevention and fire fighting fitting and fixture with network | 85% |
| Weather Proof work(tile,concrete) | 75% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 60% |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities37
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 50% |
| Sewage and Drainage System | Yes | 50% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 85% |
| Solid waste management and disposal | Yes | 85% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 50% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 85% |
| Smart Home Automation | Yes | 0% |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 50% |
| Gym | Yes | 50% |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 50% |
| Air Conditioning | Yes | 0% |
| Staircases | Yes | 100% |
| Lifts | Yes | 90% |
| Corridor/Lobbies | Yes | 90% |
| Fire escapes | Yes | 90% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 90% |
| Basement | Yes | 85% |
| Terrace | Yes | 80% |
| Outer Wall | Yes | 90% |
| Open parking areas | Yes | 80% |
Land and ownership10
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s. SHRAVANEE HOLDINGSS | - | - |
| SHUBHA PRASAD | - | - |
| TANAY N. BYSANI | - | - |
| SHASHANK B. GUPTA | - | - |
| G SUBHA DEVI | - | - |
| G. SAMBASHIVA RAO | - | - |
| G. LEELA PRASAD | - | - |
| G. DEVI PRASAD | - | - |
| SHAILAJA HANUMESH | - | - |
| S. HANUMESH | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 67.08 cr | Rs 32.39 cr |
| On-site expenditure-Site Overhead | - | Rs 1.11 cr |
| Payment of taxes | - | Rs 5.11 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DHARMJIT V KAK |
| Engineer | Jayakumar V |
| Chartered Accountant | K Chengala Rayudu |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed125
As listed on the registration, under the names the promoter filed them with; the newest 80 of 125 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/090125/007370 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 SHRAVANEE ICON Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-6 SHRAVANEE ICON Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 SHRAVANEE ICON Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Q1 - CA - 2026-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Q1 - ARC - 2026-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Q1 - Engg - 2026-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Q4 - CA - 2025-26.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Q4 - ARC - 2025-26.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Q4 - Engg - 2025-26.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA - Q3.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Arc - Q3.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engg - Q3.pdf | 14 Jan 2026 |
| Form-6 Engineer CertificatedFile: 1 Form-6 Engineer Certificated.pdf | 8 Jan 2025 |
| Stability CertificateFile: 2 Stability Certificate.pdf | 8 Jan 2025 |
| STP Drawing Engineer signedFile: 3 STP Drawing Engineer signed.pdf | 8 Jan 2025 |
| BESCOM NOC with fee paid receiptFile: 5 BESCOM NOC with fee paid receipt.pdf | 8 Jan 2025 |
| Certified Guidance ValueFile: 6 Certified Guidance Value.pdf | 8 Jan 2025 |
| Cost Estimation - Certified by EngineerFile: 7 Cost Estimation - Certified by Engineer.pdf | 8 Jan 2025 |
| CLARIFICATION ABOUT SOLD AND UNSOLD UNIT DETAILSFile: 8 CLARIFICATION ABOUT SOLD AND UNSOLD UNIT DETAILS.pdf | 8 Jan 2025 |
| AAI NOCFile: 9 AAI NOC.pdf | 8 Jan 2025 |
| Certificate of AuthorizationFile: 1 Certificate of Authorization.pdf | 18 Dec 2024 |
| Source of Funds with supporting documentsFile: 2 Source of Funds with supporting documents.pdf | 18 Dec 2024 |
| Sec 3(1) AffidavitFile: 1 Sec 3(1) Affidavit.pdf | 18 Dec 2024 |
| Form B AffidavitFile: 2 Form B Affidavit.pdf | 18 Dec 2024 |
| Non-Litigation affidavitFile: 3 Non-Litigation affidavit.pdf | 18 Dec 2024 |
| Affidavit Cum Declaration - JDAFile: 4 Affidavit Cum Declaration - JDA.pdf | 18 Dec 2024 |
| Khatha Endorsement Dtd 06-11-2023File: 5 Khatha Endorsement Dtd 06-11-2023.pdf | 18 Dec 2024 |
| ECC-from 01-04-2004 to 16-12-2024 - 17-1File: 1 ECC-from 01-04-2004 to 16-12-2024 - 17-1.pdf | 18 Dec 2024 |
| ECC- from 04-01-2010 to 16-12-2024 - 17-2File: 2 ECC- from 04-01-2010 to 16-12-2024 - 17-2.pdf | 18 Dec 2024 |
| ECC-from 01-04-2010 to 10-12-2024 - 17File: 3 ECC-from 01-04-2010 to 10-12-2024 - 17.pdf | 18 Dec 2024 |
| ECC-from 01-04-2024 to 10-12-2024 - 16File: 4 ECC-from 01-04-2024 to 10-12-2024 - 16.pdf | 18 Dec 2024 |
| Gift Deed Srinivasa Gupta to Shashank GuptaFile: 1 Gift Deed Srinivasa Gupta to Shashank Gupta.pdf | 18 Dec 2024 |
| Joint Development AgreementFile: 1 Joint Development Agreement.pdf | 18 Dec 2024 |
| Amalgamation Deed - 22-04-2019 - LatestFile: 2 Amalgamation Deed - 22-04-2019 - Latest.pdf | 18 Dec 2024 |
| GPA AmendedFile: 3 GPA Amended.pdf | 18 Dec 2024 |
| GPA InitialFile: 4 GPA Initial.pdf | 18 Dec 2024 |
| Sale Deed 17-1 Vani Vilas RoadFile: 6 Sale Deed 17-1 Vani Vilas Road.pdf | 18 Dec 2024 |
| Sale Deed MN Parthasarathy in favour of Shravanee HoldingssFile: 7 Sale Deed MN Parthasarathy in favour of Shravanee Holdingss.pdf | 18 Dec 2024 |
| Special Notice LatestFile: 8 Special Notice Latest.pdf | 18 Dec 2024 |
| Clarification on RTC MR and Conversion OrderFile: 9 Clarification on RTC MR and Conversion Order.pdf | 18 Dec 2024 |
| Engineer License CopyFile: 1 Engineer License Copy.pdf | 18 Dec 2024 |
| Project Specs - Certified by EngineerFile: 2 Project Specs - Certified by Engineer.pdf | 18 Dec 2024 |
| HAL - NOCFile: 3 HAL - NOC.pdf | 18 Dec 2024 |
| Fire NOCFile: 6 Fire NOC.pdf | 18 Dec 2024 |
| BESCOM NOCFile: 7 BESCOM NOC.pdf | 18 Dec 2024 |
| KSPCB- NOCFile: 8 KSPCB- NOC.pdf | 18 Dec 2024 |
| ECC-from 01-04-2004 to 16-12-2024 - 17-1File: 1 ECC-from 01-04-2004 to 16-12-2024 - 17-1.pdf | 18 Dec 2024 |
| ECC- from 04-01-2010 to 16-12-2024 - 17-2File: 2 ECC- from 04-01-2010 to 16-12-2024 - 17-2.pdf | 18 Dec 2024 |
| ECC-from 01-04-2010 to 10-12-2024 - 17File: 3 ECC-from 01-04-2010 to 10-12-2024 - 17.pdf | 18 Dec 2024 |
| ECC-from 01-04-2024 to 10-12-2024 - 16File: 4 ECC-from 01-04-2024 to 10-12-2024 - 16.pdf | 18 Dec 2024 |
| Form-1 CA CertificateFile: 3 Form-1 CA Certificate.pdf | 18 Dec 2024 |
| Form 3 Engineer CertificateFile: 9 Form 3 Engineer Certificate.pdf | 18 Dec 2024 |
| Clarification on Single Layout Plan and OrderFile: 10 Clarification on Single Layout Plan and Order.pdf | 18 Dec 2024 |
| BBMP Approved building planFile: 11 BBMP Approved building plan.pdf | 18 Dec 2024 |
| Extract of Master Plan DemarcationFile: 12 Extract of Master Plan Demarcation.pdf | 18 Dec 2024 |
| Common Area and AmenitiesFile: 13 Common Area and Amenities.pdf | 18 Dec 2024 |
| Proforma Allotment LetterFile: 14 Proforma Allotment Letter.pdf | 18 Dec 2024 |
| Proforma Agreement of SaleFile: 15 Proforma Agreement of Sale.pdf | 18 Dec 2024 |
| E Khatha ClarificationFile: 10 E Khatha Clarification.pdf | 18 Dec 2024 |
| Bank AffidavitFile: 4 Bank Affidavit.pdf | 18 Dec 2024 |
| Zonal Regulation 2015File: 16 Zonal Regulation 2015.pdf | 18 Dec 2024 |
| Certified Guidance ValueFile: Certified Guidance Value.pdf | 18 Dec 2024 |
| Registration CertificateFile: Form - C.pdf | - |
| GST CertificateFile: GST.pdf | - |
| Partnership DeedFile: Partnership Deed - SH.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SHRAVANEE ICON on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: M/S SHRAVANEE HOLDINGSS
M/S SHRAVANEE HOLDINGSS has 1 registration on RERA Karnataka, including SHRAVANEE ICON. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SHRAVANEE ICON is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SHRAVANEE ICON?
The registered promoter entity is M/S SHRAVANEE HOLDINGSS, a partnership firm as per the filing. Its GSTIN 29ACOFS1876L1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SHRAVANEE ICON?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SHRAVANEE ICON?
The professionals named in the filing: Architect: DHARMJIT V KAK; Engineer: Jayakumar V; Chartered Accountant: K Chengala Rayudu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHRAVANEE ICON?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback