SHRAVANEE ICON

By M/S SHRAVANEE HOLDINGSS

RG-KA-83212 · RERA PRM/KA/RERA/1251/310/PR/090125/007370 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2026Possession promisedno revision filed
6 of 17Construction stages donefurthest along: Masonry Construction, 95%
12 of 29Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 125 documents Report an error

SHRAVANEE ICON is a Residential/Group Housing project by M/S SHRAVANEE HOLDINGSS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/090125/007370 on 9 Jan 2025. Possession is promised by 31 Dec 2026. 17 of the 29 units on this registration are recorded sold or booked, and 6 of 17 construction stages are filed complete.

At a glance

Project

  • NameSHRAVANEE ICON
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/090125/007370
  • ReraGenie IDRG-KA-83212

Builder

  • NameM/S SHRAVANEE HOLDINGSS
  • Entity typePartnership Firm
  • GSTIN29ACOFS1876L1Z7
  • Authorized SignatoryShailaja Hanumesh

Key dates

this monthRegisteredJan 2025PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 Jan 2025
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed125 files

Current status

59%17 of 29 units booked
57.6%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRAVANEE ICON---29029

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 17 construction stages are filed complete. The stage furthest along is Masonry Construction, at 95%.

Building: 82% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction95%
Plastering inside , outside & Ceiling95%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification75%
Dadoing, Skirting, Flooring, Tiles work (All types)85%
Railing and Grill fixing70%
Electrification, Water supply and Sanitary Finishing85%
Painting75%
Fire prevention and fire fighting fitting and fixture with network85%
Weather Proof work(tile,concrete)75%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work60%
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities37

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes50%
Sewage and Drainage SystemYes50%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes85%
Solid waste management and disposalYes85%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes50%
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes85%
Smart Home AutomationYes0%
CCTV SurveillanceYes0%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes0%
Swimming PoolYes50%
GymYes50%
ParksNoNot applicable
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes50%
Air ConditioningYes0%
StaircasesYes100%
LiftsYes90%
Corridor/LobbiesYes90%
Fire escapesYes90%
Common entrance and exit for the building/common portico/foyer/verandahYes90%
BasementYes85%
TerraceYes80%
Outer WallYes90%
Open parking areasYes80%

Land and ownership10

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners10
LandownerVillageDistrict
M/s. SHRAVANEE HOLDINGSS--
SHUBHA PRASAD--
TANAY N. BYSANI--
SHASHANK B. GUPTA--
G SUBHA DEVI--
G. SAMBASHIVA RAO--
G. LEELA PRASAD--
G. DEVI PRASAD--
SHAILAJA HANUMESH--
S. HANUMESH--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 67.08 cr
Cost incurredRs 38.61 cr
Spent of the estimate57.56%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 67.08 crRs 32.39 cr
On-site expenditure-Site Overhead-Rs 1.11 cr
Payment of taxes-Rs 5.11 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHARMJIT V KAK
EngineerJayakumar V
Chartered AccountantK Chengala Rayudu

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed125

As listed on the registration, under the names the promoter filed them with; the newest 80 of 125 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/090125/007370 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 SHRAVANEE ICON Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-6 SHRAVANEE ICON Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 SHRAVANEE ICON Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Q1 - CA - 2026-27.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Q1 - ARC - 2026-27.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Q1 - Engg - 2026-27.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Q4 - CA - 2025-26.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Q4 - ARC - 2025-26.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Q4 - Engg - 2025-26.pdf15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA - Q3.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Arc - Q3.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engg - Q3.pdf14 Jan 2026
Form-6 Engineer CertificatedFile: 1 Form-6 Engineer Certificated.pdf8 Jan 2025
Stability CertificateFile: 2 Stability Certificate.pdf8 Jan 2025
STP Drawing Engineer signedFile: 3 STP Drawing Engineer signed.pdf8 Jan 2025
BESCOM NOC with fee paid receiptFile: 5 BESCOM NOC with fee paid receipt.pdf8 Jan 2025
Certified Guidance ValueFile: 6 Certified Guidance Value.pdf8 Jan 2025
Cost Estimation - Certified by EngineerFile: 7 Cost Estimation - Certified by Engineer.pdf8 Jan 2025
CLARIFICATION ABOUT SOLD AND UNSOLD UNIT DETAILSFile: 8 CLARIFICATION ABOUT SOLD AND UNSOLD UNIT DETAILS.pdf8 Jan 2025
AAI NOCFile: 9 AAI NOC.pdf8 Jan 2025
Certificate of AuthorizationFile: 1 Certificate of Authorization.pdf18 Dec 2024
Source of Funds with supporting documentsFile: 2 Source of Funds with supporting documents.pdf18 Dec 2024
Sec 3(1) AffidavitFile: 1 Sec 3(1) Affidavit.pdf18 Dec 2024
Form B AffidavitFile: 2 Form B Affidavit.pdf18 Dec 2024
Non-Litigation affidavitFile: 3 Non-Litigation affidavit.pdf18 Dec 2024
Affidavit Cum Declaration - JDAFile: 4 Affidavit Cum Declaration - JDA.pdf18 Dec 2024
Khatha Endorsement Dtd 06-11-2023File: 5 Khatha Endorsement Dtd 06-11-2023.pdf18 Dec 2024
ECC-from 01-04-2004 to 16-12-2024 - 17-1File: 1 ECC-from 01-04-2004 to 16-12-2024 - 17-1.pdf18 Dec 2024
ECC- from 04-01-2010 to 16-12-2024 - 17-2File: 2 ECC- from 04-01-2010 to 16-12-2024 - 17-2.pdf18 Dec 2024
ECC-from 01-04-2010 to 10-12-2024 - 17File: 3 ECC-from 01-04-2010 to 10-12-2024 - 17.pdf18 Dec 2024
ECC-from 01-04-2024 to 10-12-2024 - 16File: 4 ECC-from 01-04-2024 to 10-12-2024 - 16.pdf18 Dec 2024
Gift Deed Srinivasa Gupta to Shashank GuptaFile: 1 Gift Deed Srinivasa Gupta to Shashank Gupta.pdf18 Dec 2024
Joint Development AgreementFile: 1 Joint Development Agreement.pdf18 Dec 2024
Amalgamation Deed - 22-04-2019 - LatestFile: 2 Amalgamation Deed - 22-04-2019 - Latest.pdf18 Dec 2024
GPA AmendedFile: 3 GPA Amended.pdf18 Dec 2024
GPA InitialFile: 4 GPA Initial.pdf18 Dec 2024
Sale Deed 17-1 Vani Vilas RoadFile: 6 Sale Deed 17-1 Vani Vilas Road.pdf18 Dec 2024
Sale Deed MN Parthasarathy in favour of Shravanee HoldingssFile: 7 Sale Deed MN Parthasarathy in favour of Shravanee Holdingss.pdf18 Dec 2024
Special Notice LatestFile: 8 Special Notice Latest.pdf18 Dec 2024
Clarification on RTC MR and Conversion OrderFile: 9 Clarification on RTC MR and Conversion Order.pdf18 Dec 2024
Engineer License CopyFile: 1 Engineer License Copy.pdf18 Dec 2024
Project Specs - Certified by EngineerFile: 2 Project Specs - Certified by Engineer.pdf18 Dec 2024
HAL - NOCFile: 3 HAL - NOC.pdf18 Dec 2024
Fire NOCFile: 6 Fire NOC.pdf18 Dec 2024
BESCOM NOCFile: 7 BESCOM NOC.pdf18 Dec 2024
KSPCB- NOCFile: 8 KSPCB- NOC.pdf18 Dec 2024
ECC-from 01-04-2004 to 16-12-2024 - 17-1File: 1 ECC-from 01-04-2004 to 16-12-2024 - 17-1.pdf18 Dec 2024
ECC- from 04-01-2010 to 16-12-2024 - 17-2File: 2 ECC- from 04-01-2010 to 16-12-2024 - 17-2.pdf18 Dec 2024
ECC-from 01-04-2010 to 10-12-2024 - 17File: 3 ECC-from 01-04-2010 to 10-12-2024 - 17.pdf18 Dec 2024
ECC-from 01-04-2024 to 10-12-2024 - 16File: 4 ECC-from 01-04-2024 to 10-12-2024 - 16.pdf18 Dec 2024
Form-1 CA CertificateFile: 3 Form-1 CA Certificate.pdf18 Dec 2024
Form 3 Engineer CertificateFile: 9 Form 3 Engineer Certificate.pdf18 Dec 2024
Clarification on Single Layout Plan and OrderFile: 10 Clarification on Single Layout Plan and Order.pdf18 Dec 2024
BBMP Approved building planFile: 11 BBMP Approved building plan.pdf18 Dec 2024
Extract of Master Plan DemarcationFile: 12 Extract of Master Plan Demarcation.pdf18 Dec 2024
Common Area and AmenitiesFile: 13 Common Area and Amenities.pdf18 Dec 2024
Proforma Allotment LetterFile: 14 Proforma Allotment Letter.pdf18 Dec 2024
Proforma Agreement of SaleFile: 15 Proforma Agreement of Sale.pdf18 Dec 2024
E Khatha ClarificationFile: 10 E Khatha Clarification.pdf18 Dec 2024
Bank AffidavitFile: 4 Bank Affidavit.pdf18 Dec 2024
Zonal Regulation 2015File: 16 Zonal Regulation 2015.pdf18 Dec 2024
Certified Guidance ValueFile: Certified Guidance Value.pdf18 Dec 2024
Registration CertificateFile: Form - C.pdf-
GST CertificateFile: GST.pdf-
Partnership DeedFile: Partnership Deed - SH.pdf-
Partner Details-
Partner Details-
Partner Details-

How this compares with Bengaluru Urban

59%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SHRAVANEE ICON on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: M/S SHRAVANEE HOLDINGSS

M/S SHRAVANEE HOLDINGSS has 1 registration on RERA Karnataka, including SHRAVANEE ICON. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SHRAVANEE ICON is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHRAVANEE ICON?

The registered promoter entity is M/S SHRAVANEE HOLDINGSS, a partnership firm as per the filing. Its GSTIN 29ACOFS1876L1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHRAVANEE ICON?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHRAVANEE ICON?

The professionals named in the filing: Architect: DHARMJIT V KAK; Engineer: Jayakumar V; Chartered Accountant: K Chengala Rayudu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRAVANEE ICON?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRAVANEE ICON. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRAVANEE ICON to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.