ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Shraddha Prominent

Registered No litigation declared Residential / Group Housing project

Shraddha Prominent

By Shraddha Landmark Private Limited

RG-MH-68774 · RERA P51800046232 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 18.00 crore secured on the land, in favour of Shriram Housing Finance Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 99%
22 of 87Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

Shraddha Prominent is a Residential / Group Housing project by Shraddha Landmark Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046232 on 20 Jun 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 65 of the 87 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameShraddha Prominent
  • TypeResidential / Group Housing
  • Location
    • KANNMWAR NAGAR
    • KURLA
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046232
  • ReraGenie IDRG-MH-68774

Builder

  • NameShraddha Landmark Private Limited
  • Entity typeCompany
  • DirectorsRAMCHANDRA KRISHNA RALKAR, SUDHIR BALU MEHTA
  • Other registrations20 more →
  • Completed11 of 21
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed93 files

Current status

75%65 of 87 units booked
44.2%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KANNAMWAR NAGAR OMKAR CHSNA482387087

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

KANNAMWAR NAGAR OMKAR CHS: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises93%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered25
Open Space25

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area653 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofShriram Housing Finance Ltd
Secured amountRs 18.00 crore
CERSAI search filedYes
Declared on9 Dec 2025
LandownerVillageDistrict
SHRADDHA LANDMARK PRIVATE LIMITEDKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMaharashtra Housing & Area Development Authority
Permissible FSI3834.58
Proposed, not sanctioned3,835 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGr Floor, Shop No 4,5,6,7, Vikas Paradise, LBS Marg, Mulund West
Estimated costRs 20.00 cr
Cost incurredRs 8.84 cr
Work done44.21%
BuildingWingEstimatedIncurred
KANNAMWAR NAGAR OMKAR CHSNARs 19.00 crRs 8.84 cr
-NARs 1.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArcho Consultants
EngineerSK Consultants & Engineers
EngineerRajendra P Bankar
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Shraddha Landmark Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03022619695Dec 2025 → Dec 2026

Reason as filed by the promoterThe project construction is substantially completed and only minor finishing works remain. However, the application for Occupancy Certificate (OC) is currently pending due to delay in approvals from the concerned local authority. Since the issuance of OC is essential for project completion and handover, additional time is required to obtain the same. The delay is purely administrative and beyond the control of the promoter. Therefore, an extension is sought to complete the remaining minor works and secure the Occupancy Certificate in compliance with RERA provisions.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Shraddha Prominent June 2026.pdf13 Aug 2026
Withdrawal Update Form 2File: Form 2 - Shraddha Prominent June 2026.pdf13 Aug 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Prominent June 2026.pdf13 Aug 2026
Form 2A (FY 2022-2023)File: Form2A 2022-2023.pdf19 Jun 2026
Form 2A (FY 2023-2024)File: Form2A 2023-2024.pdf19 Jun 2026
Form 2A (FY 2024-2025)File: Form2A 2024-2025.pdf19 Jun 2026
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf19 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf19 Jun 2026
Withdrawal Update Form 1File: Form 1 -Shraddha Prominent as on March 2026.pdf21 May 2026
Withdrawal Update Form 2File: Form 2 -Shraddha Prominent as on March 2026.pdf21 May 2026
Withdrawal Update Form 3File: Form 3 -Shraddha Prominent as on March 2026.pdf21 May 2026
Withdrawal Update Form 1File: Form 1 - Shraddha Prominent as on Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 1File: Form 1 - Shraddha Prominent as on Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 - Shraddha Prominent as on Sept 2025.pdf3 Feb 2026
Withdrawal Update Form 2File: Form 2 - Shraddha Prominent as on Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 - Shraddha Prominent as on Sept 2025.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 -Shraddha Prominent as on 31-12-2025.pdf3 Feb 2026
Layout approvalFile: Layout & Ground Floor.pdf9 Dec 2025
Building plan approvalFile: Layout & Ground Floor.pdf9 Dec 2025
Building plan approvalFile: 1, 2-7, 9-14, 16-17.pdf9 Dec 2025
Building plan approvalFile: 18, 19-21, 23.pdf9 Dec 2025
Building plan approvalFile: Terrace.pdf9 Dec 2025
Building plan approvalFile: Elevation.pdf9 Dec 2025
Form 1File: Form 1 - Shraddha Prominent as on June 2025.pdf9 Sep 2025
Form 2File: Form 2 - Shraddha Prominent as on June 2025.pdf9 Sep 2025
Form 3File: Form 3 - Shraddha Prominent as on June 2025.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Prominent as on June 2025.pdf9 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Prominent as on March 2025.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Shraddha Prominent as on 31-03-2025.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Prominent as on March 2025.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Prominent as on Dec 2024.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Prominent as on Dec 2024.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Prominent as on Dec 2024.pdf13 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC - Shraddha Prominent.pdf13 Dec 2024
Disclosure of sold/ booked inventoryFile: sh prominent_0001.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Shraddha Prominent Sep 2024.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Shraddha Prominent - FY 2023-24.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Shraddha Prominent as on 30th September 2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Prominent as on Sep 2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Shraddha Prominent Sep 2024.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2024 (1).pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Prominent as on June 2024.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - With Table F_11zon.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Prominent as on June 2024.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29_SHRADDHA PROMINENT.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 2022-23.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2023-24.pdf14 Oct 2024
Details of encumbrancesFile: Encumbrance on project Shraddha Prominent .pdf13 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - Shraddha Prominent.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Prominent as on June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Shraddha Prominent as on 30th June 2024.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Prominent as on June 2024.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Prominent as on March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Shraddha Prominent as on 31st March 2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Prominent as on Dec 2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Shraddha Prominent as on 31st December 2023.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Prominent as on Dec 2023.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Prominent as on June 2023.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - SHRADDHA PROMINENT_SEP-23.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 - Shraddha Prominent as on June 2023.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on Sep 2023- Shraddha Prominent.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Shraddha Prominent as on March 2023.pdf21 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on June 2023- Shraddha Prominent.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on Sep 2023- Shraddha Prominent.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Shraddha Prominent as on 30-06-2023.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Shraddha Prominent as on 30-09-2023.pdf10 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Bldg No 15 KNR Plinth CC NEW.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 of Shraddha Prominent - FY 22-23.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on June 2022- Shraddha Prominent.pdf16 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on September 2022- Shraddha Prominent.pdf16 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on December 2022- Shraddha Prominent.pdf16 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on March 2023- Shraddha Prominent.pdf16 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Shraddha Prominent as on 30-06-2022.pdf16 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Shraddha Prominent as on 30-09-2022.pdf16 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Shraddha Prominent as on 31-12-2022.pdf16 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Shraddha Prominent as on 31-03-2023.pdf16 Jun 2023
Declaration about Commencement CertificateFile: Commencement_Certificate.pdf15 Jun 2022
Proforma of Allotment letterFile: PROMINENT DRAFT COPY_0001_11zon (4)_11zon.pdf15 Jun 2022
Building plan approvalFile: Layout Plan_Bldg 15.pdf10 Jun 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
MARLESHWAR CHSMARLESHWAR CHS KOKAN NAGAR NEXT TO HANUMAN MANDIR BHANDUP WEST MUMBAI 40007860CompletedJan 2016Late, Jun 2017
MARLESHWAR CHSMARLESHWAR CHS KOKAN NAGAR NEXT TO HANUMAN MANDIR BHANDUP WEST MUMBAI 40007860CompletedJan 2016Late, Jun 2017

How this compares with Mumbai Suburban

75%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shraddha Prominent on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KURLA6,700+ in Mumbai Suburban

2 kmShraddha ProminentCompleted 44Lapsed / revoked 22Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: Shraddha Landmark Private Limited

SHRADDHA LANDMARK PRIVATE LIMITED has 21 registrations on MahaRERA, including SHRADDHA EVOQUE and SHRADDHA ORCHID AVENUE. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Shraddha Prominent is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shraddha Prominent?

The registered promoter entity is Shraddha Landmark Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shraddha Prominent?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shraddha Prominent?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shraddha Prominent?

The professionals named in the filing: Architect: Archo Consultants; Engineer: SK Consultants & Engineers; Engineer: Rajendra P Bankar; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shraddha Prominent?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shraddha Prominent. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shraddha Prominent to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.