Home / Browse projects / Mumbai Suburban, Maharashtra / SHRADDHA PRIVILEGE

Completed No litigation declared Residential / Group Housing project

SHRADDHA PRIVILEGE

By SHRADDHA LANDMARK PRIVATE LIMITED

RG-MH-60174 · RERA P51800033921 · Last updated on MahaRERA portal: 8 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 20 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Staircases, 90%
18 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

SHRADDHA PRIVILEGE is a Residential / Group Housing project by SHRADDHA LANDMARK PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800033921 on 14 Mar 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 66 of the 84 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHRADDHA PRIVILEGE
  • TypeResidential / Group Housing
  • Location
    • HARIYALI VILLAGE
    • KANNAMWAR NAGAR VIKHROLI EAST
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800033921
  • ReraGenie IDRG-MH-60174

Builder

  • NameSHRADDHA LANDMARK PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsSUDHIR BALU MEHTA, VISHAL PRITHVIRAJ SALECHA, RAMCHANDRA KRISHNA RALKAR
  • Other registrations20 more →
  • Completed11 of 21
  • Past their filed date2
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Mar 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed54 files

Current status

79%66 of 84 units booked
44.0%Work done, per cost certificate

Figures as on 8 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRADDHA PRIVILEGENA232284084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

SHRADDHA PRIVILEGE: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered29

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area611 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI3673.35
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANAKIA ZILLION BKC ANNEXE KURLA WEST MUMBAI 400070
Estimated costRs 20.00 cr
Cost incurredRs 8.80 cr
Work done43.99%
BuildingWingEstimatedIncurred
SHRADDHA PRIVILEGENARs 19.00 crRs 8.36 cr
-NARs 1.00 crRs 43.99 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArcho Consultants
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
SHRADDHA LANDMARK PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Privilege as on March 2025.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Privilege as on Dec 2024.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shraddha Privilege as on 31-03-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Palacious as on March 2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Privilege as on Dec 2024.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Privilege as on March 2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Privilege as on Dec 2024.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Privilege as on Dec 2024.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Privilege as on Dec 2024.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: sh privillege_0001.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Shraddha Privilege Sep 2024.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Shraddha Privilege Fy 2023-24.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shraddha Privilege as on 30-09-2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Privilege as on 30-09-2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Shraddha Privilege Sep 2024.pdf16 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - Shraddha Privilege.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Privilege as on June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shraddha Privilege as on 30th June 2024.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Privilege as on June 2024.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Privilege as on March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shraddha Privilege as on 31st March 2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Privilege as on Dec 2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shraddha Privilege as on 31st December 2023.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Privilege as on Dec 2023.pdf12 Jan 2024
Proforma of Agreement for saleFile: AFS_Shraddha Privilege.pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Privilege as on March 2023.pdf11 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Privilege as on June 2023.pdf11 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Privilege as on Sep 2023.pdf11 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Privilege as on March 2023.pdf11 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Privilege as on June 2023.pdf11 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Privilege as on Sep 2023.pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - SHRADDHA PRIVILEGE as on March 2023.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Privilege as on June 2023.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Privilege as on Sep 2023.pdf7 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Shraddha Privilege for FY 2022-23.pdf2 Dec 2023
Details of encumbrancesFile: RERA Encumbrance Shraddha Privilege.pdf27 Nov 2023
Proforma of Agreement for saleFile: Privilege MT Draft.pdf27 Nov 2023
Copy of the legal title reportFile: Bldg no 11 Knr RERA Title report_compressed.pdf9 Mar 2022
Layout approvalFile: 3 Bldg No11 Layout Plan.pdf1 Mar 2022
Building plan approvalFile: IOD_BUILDING NO 11_compressed.pdf1 Mar 2022
PAN CardFile: SLPL PAN CARD.pdf1 Mar 2022
Copy of the legal title reportFile: 8 Bldg No11 KNR Title Certificate_compressed.pdf1 Mar 2022
Details of encumbrancesFile: 9 Bldg no11 knr encumbrance certificate.pdf1 Mar 2022
Copy of Layout Approval (in case of layout)File: 3 Bldg No11 Layout Plan.pdf1 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD_BUILDING NO 11_compressed.pdf1 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CC Building No 11.pdf1 Mar 2022
Declaration about Commencement CertificateFile: FORM D_BUILDING NO 11.pdf1 Mar 2022
Declaration in FORM BFile: 10 Bldg no11 knr RERA form B.pdf1 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200231368873_For_Asset_Based_Search_01_03_2022_15_40_10_724.pdf1 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_BUILDING NO 11.pdf1 Mar 2022
Proforma of Allotment letterFile: bldg no 11 allotment letter_compressed.pdf1 Mar 2022
Proforma of Allotment letterFile: Building No 11 Agreement draft-1-10_compressed.pdf1 Mar 2022
Proforma of Allotment letterFile: Building No 11 Agreement draft-11-20_compressed.pdf1 Mar 2022
Proforma of Allotment letterFile: Building No 11 Agreement draft-21-30_compressed.pdf1 Mar 2022

How this compares with Mumbai Suburban

79%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHRADDHA PRIVILEGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANNAMWAR NAGAR VIKHROLI EAST6,700+ in Mumbai Suburban

2 kmSHRADDHA PRIVILEGECompleted 35Lapsed / revoked 28Other 98Dot size: filed unitsN

Filed coordinates, straight-line distance. 161 registered projects within 2 km.

Builder: SHRADDHA LANDMARK PRIVATE LIMITED

SHRADDHA LANDMARK PRIVATE LIMITED has 21 registrations on MahaRERA, including SHRADDHA EVOQUE and SHRADDHA ORCHID AVENUE. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHRADDHA PRIVILEGE is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHRADDHA PRIVILEGE?

The registered promoter entity is SHRADDHA LANDMARK PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHRADDHA PRIVILEGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHRADDHA PRIVILEGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHRADDHA PRIVILEGE?

The professionals named in the filing: Architect: Archo Consultants; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHRADDHA PRIVILEGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHRADDHA PRIVILEGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHRADDHA PRIVILEGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.