ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Shraddha Palladium

Registered No litigation declared Residential / Group Housing project

Shraddha Palladium

By Shraddha Apex LLP

RG-MH-42066 · RERA P51800048579 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 53%
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

Shraddha Palladium is a Residential / Group Housing project by Shraddha Apex LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048579 on 10 Jan 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameShraddha Palladium
  • TypeResidential / Group Housing
  • Location
    • Kannamwar Nagar
    • Hariyali
    • Vikhroli East
    • Hariyali
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • RERA no.P51800048579
  • ReraGenie IDRG-MH-42066

Builder

  • NameShraddha Apex LLP
  • Entity typePartnership
  • PartnersRamchandra Krishna Ralkar, Sudhir Balu Mehta

Key dates

this monthRegisteredJan 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed89 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 252 - A WingNA240000
Building 252 - B WingNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 53%.

Building 252 - A Wing52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure53%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises21%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building 252 - B Wing52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure53%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises21%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,376 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Kannamwar Nagar Sahajeevan CoOperative Hsg Soc LtdKurlaMumbai Suburban

Approvals and building plan

Permissible FSI12310.69
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGr Floor Shop No 4,5,6,7, Vikas Paradise, LBS Marg, Mulund West

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerS K Consultants & Engineers
EngineerRajendra Bankar
Chartered AccountantNB Sayed & Associates
PartnerRole in project
Shraddha Apex LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A FY 25-26 SHRADDHA PALLADIUM.pdf9 Jul 2026
Form 1File: Form 1.pdf20 May 2026
Form 2File: Form 2 of Shraddha Palladium as on 31-03-2026.pdf20 May 2026
Form 3File: Form 3 of Shraddha Palladium as on 31-03-2026.pdf20 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 of Shraddha Palladium as on 31-03-2026.pdf20 May 2026
Form 1File: Form 1 - Shraddha Palladium as on Dec 2025.pdf13 May 2026
Form 2File: Form 2 - Shraddha Palladium as on June 2025.pdf13 May 2026
Form 3File: Form 3 - Shraddha Palladium as on June 2025.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Palladium as on June 2025.pdf13 May 2026
Form 1File: Form 1 - Shraddha Palladium as on Dec 2025.pdf13 May 2026
Form 2File: Form 2 - Shraddha Palladium as on Sep 2025.pdf13 May 2026
Form 3File: Form 3 - Shraddha Palladium as on Sep 2025.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Palladium as on Sep 2025.pdf13 May 2026
Form 1File: Form 1 - Shraddha Palladium as on Dec 2025.pdf13 May 2026
Form 2File: Form 1 - Shraddha Palladium as on Dec 2025.pdf13 May 2026
Form 3File: Form 3 - Shraddha Palladium as on Dec 2025.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shraddha Palladium as on Dec 2025.pdf13 May 2026
Form 5 (FY 2024-2025)File: Form 5 - Sharddha Palladium for FY 2024-25.pdf27 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Palladium as on March 2025.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shraddha Palladium as on 31st March 2025-Signed.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Palladium as on March 2025.pdf2 May 2025
Commencement Certificates / NA Order for plotted developmentFile: Bldg No 252 KNR FCC.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Palladium as on Dec 2024.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Palladium as on Dec 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Palladium as on Dec 2024.pdf20 Jan 2025
Proforma of Agreement for saleFile: AFS_Shraddha Palladium.pdf7 Jan 2025
Details of encumbrances concerned to FinanceFile: SHRADDHA APEX LLP (1).pdf26 Dec 2024
Details of encumbrances concerned to LegalFile: SHRADDHA APEX LLP (1).pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: sh palladium_0001_3_11zon.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Shraddha Palladium Sep 2024.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Shraddha Palladium for FY 2023-24.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shraddha Palladium as on September 2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Palladium as on Sep 2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Shraddha Palladium Sep 2024.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shraddha Palladium as on June 2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shraddha Palladium as on June 2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shraddha Palladium as on March 2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shraddha Palladium as on June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Shraddha Palladium as on June 2024_compressed.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revise Form 3 Shraddha Palladium as on Mar-24.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Shraddha Palladium as on June 2024.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Palladium as on June 2024.pdf18 Jul 2024
Building plan approvalFile: KNR Amended IOD.pdf25 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: KNR Amended IOD.pdf25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shraddha Palladium as on Dec 2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Shraddha Palladium as on Dec 23.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shraddha Palladium as on Dec 2023.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Palladium as on March 2023.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha Palladium as on June 2023.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shraddha PAlladium as on Sept 2023.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Plladium as on March 2023.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Plladium as on June 2023.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shraddha Plladium as on Sept 2023.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Shraddha Palladium as on March 2023.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BULIDING NO 252 KNOWN AS KANNAMWAR NAGAR.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg No 252 KNR RERA Form - March 23.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bldg No 252 KNR RERA Form - June 23.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shraddha Palladium as on September 2023.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shraddha Palladium as on March 2023.pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shraddha Palladium as on Sept-23.pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Format Form 3 Shraddha Palladium as on Mar-23.pdf27 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Shraddha Palladium FY 22-23.pdf25 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Shraddha Palladium as on 16-09-2023.pdf20 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shraddha Palladium as on June 2023.pdf18 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shraddha Palladium as on June 2023.pdf18 Sep 2023
Details of encumbrances concerned to FinanceFile: SHRADDHA PLLADIUM - Encumbrance Cert.pdf17 Aug 2023
Details of encumbrances concerned to LegalFile: SHRADDHA PLLADIUM - Encumbrance Cert.pdf17 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: organized (47)_11zon.pdf3 Jan 2023
Proforma of Allotment letterFile: Allotment Letter _ Shraddha Palladium_24122022.pdf3 Jan 2023
Layout approvalFile: Shraddha Palladium- Layout Plan (1).pdf22 Dec 2022
Building plan approvalFile: Shraddha Palladium- Layout Plan (1).pdf22 Dec 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance - Finance- Shraddha Palladium.pdf22 Dec 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance -legal- Shraddha Palladium.pdf22 Dec 2022
Details of encumbrances concerned to LegalFile: No Encumbrance - Finance- Shraddha Palladium.pdf22 Dec 2022
Details of encumbrances concerned to LegalFile: No Encumbrance -legal- Shraddha Palladium.pdf22 Dec 2022
Copy of Layout Approval (in case of layout)File: Shraddha Palladium- Layout Plan (1).pdf22 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Shraddha Palladium- Layout Plan (1).pdf22 Dec 2022
Declaration about Commencement CertificateFile: Format D- Shraddha Palladium.pdf22 Dec 2022
Proforma of Agreement for saleFile: Agreement for sale- Shraddha Palladium_16122022.pdf22 Dec 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shraddha Palladium on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hariyali, Vikhroli East6,700+ in Mumbai Suburban

Builder: Shraddha Apex LLP

Shraddha Apex LLP has 1 registration on MahaRERA, including Shraddha Palladium. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Shraddha Palladium is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shraddha Palladium?

The registered promoter entity is Shraddha Apex LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shraddha Palladium?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shraddha Palladium?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shraddha Palladium?

The professionals named in the filing: Engineer: S K Consultants & Engineers; Engineer: Rajendra Bankar; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shraddha Palladium?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shraddha Palladium. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shraddha Palladium to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one