SHIV RESIDENCY
RG-MH-22980 · RERA P53100032201 · Last updated on MahaRERA portal: 16 Apr 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHIV RESIDENCY is a Residential / Group Housing project by M AND K BUILDERS in Sangli, Maharashtra, registered with MahaRERA as P53100032201 on 15 Dec 2021. The registration is recorded completed; possession was promised by 31 Dec 2024. The completion date has moved by 12 months from the original filing. 0 of the 12 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameSHIV RESIDENCY
- TypeResidential / Group Housing
- Location
- VAKHARBHAG MIRAJ
- VAKHARBHAG
- Sangli Miraj Kupwad (M Corp.)
- Miraj
- Sangli
- 416410
- Pincode416410
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100032201
- ReraGenie IDRG-MH-22980
Builder
- NameM AND K BUILDERS
- Entity typePartnership
- GSTIN27ABRFM9633P1Z5
- PartnerMAHADEV TAMANNA KURANE
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on15 Dec 2021
- Promised completion31 Dec 2024
- Revised completionRevised to 31 Dec 2024 (originally 31 Dec 2023)
- Buildings1 building record
- Documents filed75 files
Current status
Figures as on 16 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHIV RESIDENCY | NA | 6 | 4 | 12 | 0 | 12 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SHIV RESIDENCY: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed12
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Er SUNIL ZARE |
| Engineer | SANDIP MAHADIK |
| Engineer | SUNIL R ZARE |
| Engineer | ER RAKESH R BASARGE |
| Chartered Accountant | S G YESUMALI |
| Partner | Role in project |
|---|---|
| M AND K BUILDERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO VOLATILITY OF THE MARKET AND BOOKING ,
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Dec 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM-1 30-06-24 .pdf | 16 Apr 2026 |
| Form 2File: FORM-2 30-06-24 .pdf | 16 Apr 2026 |
| Form 3File: FORM-3 30-06-24 .pdf | 16 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30-06-24 .pdf | 16 Apr 2026 |
| Form 1File: FORM-1 30-09-24 .pdf | 16 Apr 2026 |
| Form 2File: FORM-2 30-09-24 .pdf | 16 Apr 2026 |
| Form 3File: FORM-3 30-09-24 .pdf | 16 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30-09-24 .pdf | 16 Apr 2026 |
| Form 1File: FORM-1 31-12-24 .pdf | 16 Apr 2026 |
| Form 2File: FORM-2 31-12-24 .pdf | 16 Apr 2026 |
| Form 3File: FORM-3 31-12-24 .pdf | 16 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-12-24 .pdf | 16 Apr 2026 |
| Occupational CertificateFile: REVISED DRAWING_compressed.pdf | 16 Apr 2026 |
| Occupational CertificateFile: Revised building permission.pdf | 16 Apr 2026 |
| Occupational CertificateFile: FORM 4 AR Certificate.pdf | 16 Apr 2026 |
| Occupational CertificateFile: oc mail smkc to rera.pdf | 16 Apr 2026 |
| Occupational CertificateFile: complition certificate.pdf | 28 Jul 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A M AND K BUILDERS (1).pdf | 1 Aug 2024 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf | 29 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 - 1--23 TO 1-3-23.pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 - 1-4-23 TO 30-6-23.pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 - 1-7-23 TO 30-9-23.pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 - 1-10-23 TO 31 - 12-23.pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 - 1-1-24 TO 31 -3 -24.pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DISCLOSURE OF SOLD - 31-12-23.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 -1-1-23 TO 1-3-23.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 - 1-7-23.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 1-10--23.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - 1-10-23 TO 31-12-23.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 -1-1-24 TO 31-3-24.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - 31-3-23.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - 30-6-23.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - 30-9-23.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - 3-3-24.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE - 11-3-24.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE - 1-4-23 TO 30-6-23.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE - 1-7-23 TO 30-9-23.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE - 1 -10-23 TO 31-12-23.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE - 1-1-24 TO 11-3-24.pdf | 22 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf | 22 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 31032022.pdf | 29 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C A CERTIFICATE 30062022.pdf | 29 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - 30092022.pdf | 29 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE-31122022.pdf | 29 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - 31032022.pdf | 29 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE- 30062022.pdf | 29 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 30092022.pdf | 29 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 31122022.pdf | 29 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 A.pdf | 29 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - 31032022.pdf | 29 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - 30062022.pdf | 29 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - 30092022.pdf | 29 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - 30122022.pdf | 29 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE 31032022.pdf | 29 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DISCLOSURE OF SOLD - 30062022.pdf | 29 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DISCLOSURE OF SOLD - 30092022.pdf | 29 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE 31122022.pdf | 29 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ANNUAL REPORT STATEMENT OF ACCOUNTS.pdf | 29 Mar 2023 |
| Proforma of Allotment letterFile: Shiv residency AGREEMENT TO SALE.pdf | 6 Dec 2021 |
| Layout approvalFile: nakasha.pdf | 4 Dec 2021 |
| Building plan approvalFile: dwg.pdf | 4 Dec 2021 |
| PAN CardFile: firm pan card.pdf | 4 Dec 2021 |
| Copy of the legal title reportFile: LEGAL TITAL REPORT.pdf | 4 Dec 2021 |
| Details of encumbrancesFile: certificate.pdf | 4 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: nakasha.pdf | 4 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: dwg.pdf | 4 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: building permission certificate.pdf | 4 Dec 2021 |
| Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf | 4 Dec 2021 |
| Declaration in FORM BFile: form b afidavit cum declaration.pdf | 4 Dec 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf | 4 Dec 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate.pdf | 4 Dec 2021 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 4 Dec 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - c a certificate.pdf | 4 Dec 2021 |
| Proforma of Allotment letterFile: letter of allotment.pdf | 4 Dec 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
Keep SHIV RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VAKHARBHAG790+ in Sangli
Filed coordinates, straight-line distance. 37 registered projects within 2 km.
SHAKTI PRESTIGE
SHAKTI BUILDCON
SHREE RAM SRUSHTI
SHREE ASSOCIATES
GALAXY SKY
SKY GALAXY CONSTRUCTIONS
Agrawal Donage Heights
Vighnesh Nilesh Agrawal
VIJAYALAXMI ARCADE
SAGAR VIVEKANAND DESHPANDE
PRASAD JAGTAP REALTY PVT LTD
PRASAD JAGTAP REALTY PVT LTD
See every Sangli project, with the district possession charts
Builder: M AND K BUILDERS
M AND K BUILDERS has 1 registration on MahaRERA, including SHIV RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What are my rights if SHIV RESIDENCY is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHIV RESIDENCY?
The registered promoter entity is M AND K BUILDERS, a partnership as per the filing. Its GSTIN 27ABRFM9633P1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHIV RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHIV RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHIV RESIDENCY?
The professionals named in the filing: Architect: Er SUNIL ZARE; Engineer: SANDIP MAHADIK; Engineer: SUNIL R ZARE; Engineer: ER RAKESH R BASARGE; Chartered Accountant: S G YESUMALI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHIV RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback