Registration approved Residential/Group Housing project

SHIRIN

By SALVINA INFRACON

RG-KA-93588 · RERA PRM/KA/RERA/1251/446/PR/200624/003465 · Last updated on RERA Karnataka portal: 15 Jun 2020

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2024Possession promisedmoved 21 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 69 documents Report an error

SHIRIN is a Residential/Group Housing project by SALVINA INFRACON in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/200624/003465 on 24 Jun 2020. Possession is promised by 30 Mar 2024. The completion date has moved by 21 months from the original filing.

At a glance

Project

  • NameSHIRIN
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/200624/003465
  • ReraGenie IDRG-KA-93588

Builder

  • NameSALVINA INFRACON
  • Entity typeProprietorship Firm
  • Authorized SignatorySiva Kumar Dasari

Key dates

this monthRegisteredJun 2020First promiseJun 2022Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on24 Jun 2020
  • Promised completion30 Mar 2024
  • Revised completionRevised to 30 Mar 2024 (originally 30 Jun 2022)
  • Buildings1 building record
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIRIN---28028

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Jun 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities36

As on 15 Jun 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,871 sq m
Named landowners1
LandownerVillageDistrict
R.Manjunath--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPoornakriti Facadee Designers
EngineerAdharshila Structural Consultant

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2022 → Mar 2023

No reason recorded in the filing

EX/PRM/KA/RERA/1251/446/PR/230908/003465Mar 2023 → Mar 2024

Reason as filed by the promoterShortage of Labour

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed69

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/200624/003465 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
COMPLETE IT 2018-19File: 2018-19-ITR-P&L-Balance sheet.pdf15 Jun 2020
COMPLETE IT 2019-20File: 2019-20-ITR-P&L-Balance sheet.pdf15 Jun 2020
Site PlanFile: Site Plan.pdf4 Jun 2020
Elevation and Section PlanFile: Elevation and Section Plan.pdf4 Jun 2020
Basement Ground and First Floor PlanFile: Basement Ground and First Floor Plan.pdf4 Jun 2020
Second Third and Terrace PlanFile: Second Third and Terrace Plan.pdf4 Jun 2020
Bescom ReceiptFile: BESCOM Connection.pdf4 Jun 2020
KSPCB - NOCFile: KSPCB - NOC.pdf4 Jun 2020
IT complete 2018-19File: 2018-19-ITR-P&L-Balance sheet.pdf4 Jun 2020
IT complete 2019-20File: 2019-20-ITR-P&L-Balance sheet.pdf4 Jun 2020
CertificateFile: Registration Certificate - Proprietorship.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Project Extension Report Architects Certificate For Status Of Work.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form Ex5 - Engineer Certificate for status of work.pdf-
CA Certificate for Funds UtilizationFile: CA Report for Funds Utilized- Form EX3.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Project Extension Report Architects Certificate For Pending Work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form Ex5 - Engineer Certificate for status of work.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Report for Funds Utilized- Form EX3.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
BDA Plan License and Commencement-
Complete Plans from BDA-
Old Sale Deed - Manjunath Land Owner-
Complete Plans from BDA-
Complete Plans from BDA-
Project Specifications-
Encumbrance Certificate till date-
Affidavit-
Joint Affidavit Builder and Land Owner-
RTC And Khatha-
Joint Development Agreement-
KIADB - NOC-
Conversion Order-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
KSPCB - NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Complete Plans from BDA-
Complete Plans from BDA-
Unnamed document-
Balance Sheet 2018 - 2019File: Sivakumar Dasari-Form16-2018-19.pdf-
Balance Sheet 2017 - 2018File: Form16_Sivakumar Dasari_2017-18.pdf-
Balance Sheet 2016 - 2017File: Siva Kumar ITR-Form16-2017-18 - uploaded.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Sivakumar Dasari-Form16-2018-19.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Form16_Sivakumar Dasari_2017-18.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Siva Kumar ITR-Form16-2017-18 - uploaded.pdf-
Cash Flow Statement 2018 - 2019File: Sivakumar Dasari-Form16-2018-19.pdf-
Cash Flow Statement 2017 - 2018File: Form16_Sivakumar Dasari_2017-18.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: Sivakumar-26As-2019.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: Form16_Sivakumar Dasari_2017-18.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Siva Kumar ITR-Form16-2017-18 - uploaded.pdf-
Form - B-
Prospectus/BrochureFile: Salvina Shirin E- Brochure_11zon.pdf-
Tower Excel SheetFile: PRMKARERA1251446PR200624003465.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SHIRIN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SALVINA INFRACON

SALVINA INFRACON has 1 registration on RERA Karnataka, including SHIRIN. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SHIRIN is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHIRIN?

The registered promoter entity is SALVINA INFRACON, a proprietorship firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHIRIN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHIRIN?

The professionals named in the filing: Architect: Poornakriti Facadee Designers; Engineer: Adharshila Structural Consultant. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIRIN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIRIN. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIRIN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.