ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / SHELTER PLAZA

Registered No litigation declared Residential / Group Housing project

SHELTER PLAZA

By MAHIRA DEVELOPERS

RG-MH-05333 · RERA P52000050990 · Last updated on MahaRERA portal: 24 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
18 of 31Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

SHELTER PLAZA is a Residential / Group Housing project by MAHIRA DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000050990 on 19 May 2023. Possession is promised by 31 Dec 2026. 13 of the 31 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHELTER PLAZA
  • TypeResidential / Group Housing
  • Location
    • BIRWADI
    • Mahad
    • Raigarh
    • 402302
  • Pincode402302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000050990
  • ReraGenie IDRG-MH-05333

Builder

  • NameMAHIRA DEVELOPERS
  • Entity typePartnership
  • PartnersMANSOOR AHMAD LOKHANDE, HAWA MANSOOR LOKHANDE
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredMay 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 May 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed95 files

Current status

42%13 of 31 units booked
100.0%Work done, per cost certificate

Figures as on 24 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHELTER PLAZANA54201131

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SHELTER PLAZA: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area700 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024
LandownerVillageDistrict
NOORJAHA AHMAD MATWANKARDabholRaigarh

Approvals and building plan

Sanctioning authorityTOWN PLANNING RAIGAD ALIBAGH
Permissible FSI1398.2
Proposed, not sanctioned1,398 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHAD
Estimated costRs 2.55 cr
Cost incurredRs 2.55 cr
Work done100.0%
BuildingWingEstimatedIncurred
SHELTER PLAZANARs 2.55 crRs 2.55 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANTULAY IMRAN AND ASSOCIATES
EngineerSALMAN A AZIZ BAGWAN
Chartered AccountantMOHAMMED DESHMUKH
Chartered AccountantASHFAQUE RAHATWAL
PartnerRole in project
MAHIRA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: FORM 5 may 2023 to march 2024.pdf24 Sep 2025
Withdrawal Update Form 1File: FORM 1 QUR 9 APRIL 2025 TO JUNE 2025.pdf20 Sep 2025
Withdrawal Update Form 1File: FORM 1 QUR 9 APRIL 2025 TO JUNE 2025.pdf20 Sep 2025
Withdrawal Update Form 2File: FORM 2 QUR 9 APRIL 25 TO JUNE 25.pdf20 Sep 2025
Withdrawal Update Form 2File: FORM 2 QUR 9 APRIL 25 TO JUNE 25.pdf20 Sep 2025
Withdrawal Update Form 3File: FORM 3 APRIL 25 TO JUNE 25.pdf20 Sep 2025
Withdrawal Update Form 3File: FORM 3 APRIL 25 TO JUNE 25.pdf20 Sep 2025
Form 1File: FORM 1 QUR 1 MAY 23 TO JULY 23.pdf19 Sep 2025
Form 2File: FORM 2 QUR 1 MAY 23 TO JULY 23.pdf19 Sep 2025
Form 3File: FORM 3 QUR 1 MAY 23 TO JULY 23.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: DOBI 31-07-2023.pdf19 Sep 2025
Form 1File: FORM 1 QUR 2 AUG 23 TO OCT 23.pdf19 Sep 2025
Form 2File: FORM 2 QUR 2 AUG 2023 TO OCT 2023.pdf19 Sep 2025
Form 3File: FORM 3 QUR 2 AUG 2023 TO OCT 23.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: DOBI 31-10-2023.pdf19 Sep 2025
Form 1File: FORM 1 QUR 3 NOV 23 TO JAN 24.pdf19 Sep 2025
Form 2File: FORM 2 QUR 3 NOV 23 TO JAN 24.pdf19 Sep 2025
Form 3File: FORM 3 QUT 3 NOV 23 TO JAN 24.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: DOBI 31-01-2024.pdf19 Sep 2025
Form 1File: FORM 1 QUR 4 FEB 24 TO APRIL 24.pdf19 Sep 2025
Form 2File: FORM 2 QUR 4 FEB 24 TO APRIL 24.pdf19 Sep 2025
Form 3File: FORM 3 QUR 4 FEB 24 TO APRIL 24.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: DOBI 30-04-2024.pdf19 Sep 2025
Form 1File: FORM 1 QUR 5 MAY 24 TO JULY 24.pdf19 Sep 2025
Form 2File: FORM 2 QUR 5 MAY 24 TO JULY 24.pdf19 Sep 2025
Form 3File: FORM 3 QUR 5.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: DOBI 30-06-2024.pdf19 Sep 2025
Form 1File: FORM 1 QUR 6 JULY 24 TO OCT 24.pdf19 Sep 2025
Form 2File: FORM 2 QUR 6 JULY 24 TO OCT 24.pdf19 Sep 2025
Form 3File: FORM 3 QUR 6.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: DOBI 30-09-2024.pdf19 Sep 2025
Form 1File: FORM 1 QPR 7 NOV 24 TO DEC 24.pdf19 Sep 2025
Form 2File: FORM 2 QUR 7 nov 2024 - dec 2024.pdf19 Sep 2025
Form 3File: FORM 3 DEC END.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: DOBI 31-12-2024.pdf19 Sep 2025
Form 2File: FORM 2 QUR 8 jan 2025 to march 2025.pdf19 Sep 2025
Form 1File: FORM 1 QUR 8 JAN 25 TO MARCH 25.pdf19 Sep 2025
Form 3File: FORM 3 JAN 25 TO MARCH 25.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: DOBI - 31-03-2025.pdf19 Sep 2025
Form 1File: FORM 1 QUR 9 APRIL 2025 TO JUNE 2025.pdf19 Sep 2025
Form 2File: FORM 2 QUR 9 APRIL 25 TO JUNE 25.pdf19 Sep 2025
Form 3File: FORM 3 APRIL 25 TO JUNE 25.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: DOBI 30-06-2025.pdf19 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHELTER PLAZA FORM 1 QUE 6.pdf16 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shelter plaza form 3 que 6.pdf16 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHELTER PLAZA FORM 2 QUE 6.pdf16 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LOKHANDE FORM 1 QUA 5.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LOKHANDE FORM 2 QUA 5.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LOKHANDE QUR 5 FORM 3.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LOKHANDE FORM 1 QUA 5.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LOKHANDE FORM 2 QUA 5.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LOKHANDE QUR 5 FORM 3.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LOKHANDE FORM 1 QUA 5.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LOKHANDE FORM 2 QUA 5.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LOKHANDE QUR 5 FORM 3.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LOKHANDE FORM 1 QUA 5.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LOKHANDE QUR 5 FORM 3.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LOKHANDE FORM 2 QUA 5.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F 1 Q 1 LOKHANDE.pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F 1 Q 2 LOKHANDE.pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F 1 Q 3 LOKHANDE.pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F 1 Q 4 LOKHANDE.pdf24 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A LOKHANDE.pdf24 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 QUARTER - 1 LOKHANDE.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - QUARTER - 2 LOKHANDE.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- QUARTER- 3 LOKHANDE.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 QUARTER- 4 LOKHANDE.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 QUARTER - 1 LOKHNADE.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 5 LOKHNADE.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 QUARTER - 3 LOKHANDE.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 4 QUARTER -4 LOKHANDE.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 QUARTER- 2 LOKHNADE.pdf21 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 LOKHNADE.pdf21 Jun 2024
Disclosure of sold/ booked inventoryFile: 2ND QUARTERLY UPDATE DETAILS - SOLD AND UNSOLD.pdf21 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A.pdf15 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200266508480_For_Asset_Based_Search_19_04_2023_14_41_25_463.pdf8 May 2023
Declaration in FORM BFile: DECLARATION IN FORM B1.pdf19 Apr 2023
Proforma of Agreement for saleFile: RERA AGREEMENT.pdf19 Apr 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf18 Apr 2023
Copy of the legal title reportFile: SEARCH REPORT AS PER RERA.pdf14 Apr 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SAMI COMPLEXP52000027643Laxmi Nagar, Raigarh16Dec 2020CompletedJun 2022Oct 2021
SAMI PLAZAP52000008903Birwadi, Raigarh28Aug 2017CompletedDec 2018Dec 2018

How this compares with Raigarh

42%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHELTER PLAZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BIRWADI5,900+ in Raigarh

Builder: MAHIRA DEVELOPERS

MAHIRA DEVELOPERS has 3 registrations on MahaRERA, including SAMI PLAZA and SAMI COMPLEX. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SHELTER PLAZA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHELTER PLAZA?

The registered promoter entity is MAHIRA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHELTER PLAZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHELTER PLAZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHELTER PLAZA?

The professionals named in the filing: Architect: ANTULAY IMRAN AND ASSOCIATES; Engineer: SALMAN A AZIZ BAGWAN; Chartered Accountant: MOHAMMED DESHMUKH; Chartered Accountant: ASHFAQUE RAHATWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHELTER PLAZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHELTER PLAZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHELTER PLAZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.