Home / Browse projects / Bengaluru Urban, Karnataka / SHELL SAPPHIRE

Registration approved No litigation declared Residential/Group Housing project

SHELL SAPPHIRE

By SHELL PROMOTERS AND INFRA LLP

RG-KA-87284 · RERA PRM/KA/RERA/1251/310/PR/270723/006098 · Last updated on RERA Karnataka portal: 13 May 2026

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
Feb 2026Possession promisedmoved 12 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 136 documents Report an error

SHELL SAPPHIRE is a Residential/Group Housing project by SHELL PROMOTERS AND INFRA LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/270723/006098 on 27 Jul 2023. Possession is promised by 7 Feb 2026. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHELL SAPPHIRE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/270723/006098
  • ReraGenie IDRG-KA-87284

Builder

  • NameSHELL PROMOTERS AND INFRA LLP
  • Entity typePartnership Firm
  • LLPINAAP-2127
  • GSTIN29ADYFS6048M1ZV
  • Authorized SignatoryPRADEEP SWARUP DANDU

Key dates

this monthRegisteredJul 2023First promiseFeb 2025Revised toFeb 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on27 Jul 2023
  • Promised completion7 Feb 2026
  • Revised completionRevised to 7 Feb 2026 (originally 7 Feb 2025)
  • Buildings3 building records
  • Documents filed136 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 1---24024
Wing 2---32032
Wing 3---24024

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Mrs. Shylaja.G--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 30.00 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 30.00 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKalyan Rao
EngineerR VASANTHMADHAVA
Chartered AccountantHARI BABU

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/260529/006098Feb 2025 → Feb 2026

Reason as filed by the promoterAwaiting OC

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00390/2024-SHELL PROMOTERS AND INFRA LLP15/04/2024

Documents filed136

As listed on the registration, under the names the promoter filed them with; the newest 80 of 136 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/270723/006098 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Kindly upload list of allottees and sold and unsold units details with project name and address alonFile: Sold Unsold letter.PDF13 May 2026
Kindly upload list of allottees and sold and unsold units details with project name and address alonFile: Unsold Units.PDF13 May 2026
Kindly upload list of allottees and sold and unsold units details with project name and address alonFile: Sold Units.PDF13 May 2026
Kindly upload the OC application letter.File: Rayasandra OC (1).PDF13 May 2026
Kindly upload the engineer licence who has signed the engineer certificates Ex-5 & Ex-6File: Engineer Certificate (1).PDF13 May 2026
SOURCES FOR PROMOTERS CONTRIBUTION OF 16.4 CRORES WITH SUPPORTING DOCUMENTS TO BE CLARIFIEDFile: shell.pdf24 Jul 2023
notarized non litigation affidavitFile: affidavit shell.pdf5 Jul 2023
Upload certified Carpet area calculationFile: Shell sapphire Carpet area Certificate.pdf28 Jun 2023
FAR As per the sanction Plan is Not Matching with the details EnteredFile: Area statement - (FAR Calculation) -Shell Sapphire.xlsx28 Jun 2023
AS per the CDP there proposed land comes in the industrial zone Upload the change of land use copyFile: CLU.pdf28 Jun 2023
Upload commencement certificateFile: letter cc.pdf28 Jun 2023
Upload SEIAA NOCFile: SEIAA.PDF28 Jun 2023
Uploaded proforma of Agreement for Sale (AFS) not in accordance with the notified AFS. Certain clausFile: sale agreement-SHELL final (2).pdf28 Jun 2023
Upload profit and loss account 2019 -20File: 19-20PL.pdf2 Jun 2023
Upload profit and loss account 2020-21File: 20-21PL.pdf2 Jun 2023
Upload profit and loss account 2021-22File: 21-22PL.pdf2 Jun 2023
Balance sheet 2019-20File: 19-20BS.pdf2 Jun 2023
Balance sheet 2020-21File: 20-21BS.pdf2 Jun 2023
Balance sheet 2021-22File: 21-22BS.pdf2 Jun 2023
What are all the sources of funds to complete the project? With supporting documents.File: Source of Funds.pdf2 Jun 2023
Partition Deed in the name of Raja ReddyFile: partation Deed.PDF2 Jun 2023
MR Copy No. 08/2006-07 as per registered deed No. 05705File: MR 08 - 2006-07.PDF2 Jun 2023
Need notarized Form-B in RERA prescribed form on stamp paper, project end date mention in DD/MM/YY.File: Form B.PDF2 Jun 2023
Need joint affidavit cum declaration in RERA prescribed form on stamp paper between the land owner aFile: Joint Affidavit.PDF2 Jun 2023
Uploaded EC incomplete hence need EC from 01-04-2004 to upto till date FORM -15 and FORM-16.File: Rayasandra EC.pdf2 Jun 2023
Upload CDP map showing the proposed site.File: Dodda Nagamangala CDP Map.pdf2 Jun 2023
Upload village map showing the proposed siteFile: Dodda Nagamangala Village Map.pdf2 Jun 2023
Upload SEIAA NOCFile: SEIAA NOC.PDF2 Jun 2023
Please upload the STP design drawing certified by the concerned Engineer along with the STP demarcatFile: STP Certificate.pdf2 Jun 2023
Please upload the section 3(1) notarized affidavit by incorporating with the project name and projecFile: Affidavit 1.PDF2 Jun 2023
Please mention the project name and project address and upload the project specificationFile: Specification.PDF2 Jun 2023
Please upload the copy of fee receipt paid towards water supply NOCFile: Panchayat Payment receipt.pdf2 Jun 2023
Please upload the copy of fee receipt paid towards Power supply NOCFile: Bescom Receipt.PDF2 Jun 2023
Please upload the Proforma of Agreement for saleFile: sale agreement-SHELL final (1).pdf2 Jun 2023
proforma of allotment letter.File: Allotment Letter.PDF2 Jun 2023
RTC, survey 79/2A1-
Mutation, survey 79/2A1-
Encumbrance Certificate, survey 79/2A1-
Conversion/Alienation Order, survey 79/2A1-
Sale/Title/Gift Deed, survey 79/2A1-
JDA, survey 79/2A1-
Khatha, survey 79/2A1-
Registration CertificateFile: LLP Certificate.PDF-
Partnership DeedFile: Latest LLP Agreement.PDF-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form-1 - CA Certificate_compressed.pdf-
Certificate issued by Architect Form 2File: Form-2.pdf-
Certificate issued by Engineer Form 3File: Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NA2.pdf-
Certificate from Chartered AccountFile: Form-1 - CA Certificate_compressed.pdf-
Balance Sheet 2021 - 2022File: NA2.pdf-
Balance Sheet 2020 - 2021File: SHELL PROMOTERS & INFRA LLP BS.pdf-
Balance Sheet 2019 - 2020File: bs.pdf-
Audited Profit and Loss Statement 2021 - 2022File: NA2.pdf-
Audited Profit and Loss Statement 2020 - 2021File: SHELL PROMOTERS & INFRA LLP PL.pdf-
Audited Profit and Loss Statement 2019 - 2020File: pl.pdf-
Director's Report 2021 - 2022File: NA2.pdf-
Director's Report 2020 - 2021File: NA2.pdf-
Director's Report 2019 - 2020File: NA2.pdf-
Cash Flow Statement 2021 - 2022File: NA2.pdf-
Cash Flow Statement 2020 - 2021File: NA2.pdf-
Auditor's Report 2021 - 2022File: NA2.pdf-
Auditor's Report 2020 - 2021File: SHELL PROMOTERS AND INFRA LLP COM.pdf-
Auditor's Report 2019 - 2020File: infra llp.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: NA2.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: SHELL PROMOTERS AND INFRA LLP ACK.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: Form 3CA-3CD_ARN.pdf-
BDA Approval-
Rayasandra Bescom NOC-
Water NOC-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SHELL SAPPHIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SHELL PROMOTERS AND INFRA LLP

SHELL PROMOTERS AND INFRA LLP has 1 registration on RERA Karnataka, including SHELL SAPPHIRE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SHELL SAPPHIRE is delayed beyond 7 Feb 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHELL SAPPHIRE?

The registered promoter entity is SHELL PROMOTERS AND INFRA LLP, a partnership firm as per the filing. Its LLPIN AAP-2127 and GSTIN 29ADYFS6048M1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHELL SAPPHIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHELL SAPPHIRE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at SHELL SAPPHIRE?

The professionals named in the filing: Architect: Kalyan Rao; Engineer: R VASANTHMADHAVA; Chartered Accountant: HARI BABU. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHELL SAPPHIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHELL SAPPHIRE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHELL SAPPHIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.